HomeMy WebLinkAboutDERR-2024-012714 WESTECH EQUIPMENT
195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307
801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054
PRODUCT PIPING INTEGRITY TESTING
Facility Name: Utah Transportation Building Owner: Rocky Mountain Power
Address: 3133 West 900 South Address: 1407 West North Temple, Room 110
City, State, Zip: Salt Lake City, Utah 84104 City, State, Zip: Salt Lake City, Utah 84116
Facility I.D.#: 4001061 Phone #: 801-220-2335
Testing Company: Westech Phone #: 801-266-2545 Date: 9/10/24
This procedure is to test the integrity of product piping. Tests were performed with Petro-Tite line tester.
Tank Number 1 1 2 3
Product Stored RUL RUL DSL DSL
Piping Run RUL Hi-Flow DSL Hi-Flow
Piping Type Flex D/W Flex D/W Flex D/W Flex D/W
Test Pressure (PSI) 50 50 50 50
Test Duration (minutes) 30 30 30 30
Leak Rate (GPH) 0.003 0.004 0.001 0.001
Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☒Pass ☐Fail ☒Pass ☐Fail
Comments:
Tester’s Name Taber DeHart, UT-0394 Tester’s Signature
RUL
DSL
Hi-Flow
4
3
2
1
WESTECH EQUIPMENT
195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307
801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054
MECHANICAL AND ELECTRONIC LINE LEAK DETECTOR PERFORMANCE TESTS
Facility Name: Utah Transportation Building Owner: Rocky Mountain Power
Address: 3133 West 900 South Address: 1407 West North Temple, Room 110
City, State, Zip: Salt Lake City, Utah 84104 City, State, Zip: Salt Lake City, Utah 84116
Facility I.D.#: 4001061 Phone #: 801-220-2335
Testing Company: Westech Phone #: 801-266-2545 Date: 9/10/24
This data sheet can be used to test the mechanical line leak detector (MLLD) and electronic line leak detector (ELLD) with submersible turbine
pump (STP) systems. See PEI/RP 1200 Sections 9.1 and 9.2 for test procedures.
Line Number 1 2 3 4
Product Stored RUL RUL Hi-Flow DSL DSL Hi-Flow
Leak Detector Manufacturer Red Jacket Red Jacket Red Jacket Red Jacket
Leak Detector Model XL FX FX1DV FX1DV
Type Of leak Detector
☒MLLD
☐ELLD
☒MLLD
☐ELLD
☒MLLD
☐ELLD
☒MLLD
☐ELLD
MLLD (ALL PRESSURE MEASURMENTS ARE MADE IN PSIG)
STP full operating pressure 27 36 30 41
Check valve holding pressure 19 24 14 124
Line resiliency (ml) (line bleedback volume as measured
from check valve holding pressure to 0 psig) 80 400 60 400
Step through time in seconds (time the MLLD hesitates at
metering pressure before going to full operating pressure as
measured from 0 sig with no leak induced on the line)
2 1 1 2
Metering pressure (STP pressure when simulated leak rate 3
gph at 10 psig) 10 8 10 15
Opening time in seconds (the time the MLLD opens to allow
full pressure after simulated leak is stopped) 2 10 1 11
Does the STP pressure remain at or below the metering
pressure for at least 60 seconds when the simulated leak is
induced? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No
Does the leak detector reset (trip) when the line pressure is
bled off to zero psig? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No
Does STP properly clycle on/off under normal fuel system
operating conditions? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No
A "No" answer to any of the above questions indicates that the MLLD fails the test.
ELLD (ALL PRESSURE MEASURMENTS ARE MADE IN PSIG)
STP full operating pressure
How many test cycles are observed before alarm/shutdown
occurs?
Does the simulated leak cause on alarm? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No
A "No" answer to the above question indicates that the ELLD fails the test.
Does the simulated leak cause an STP shutdown? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No
Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☒Pass ☐Fail ☒Pass ☐Fail
Comments:
Tester’s Name Taber DeHart, UT-0394 Tester’s Signature
WESTECH EQUIPMENT
195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307
801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054
AUTOMATIC TANK GAUGE OPERATION INSPECTION
Facility Name: Utah Transportation Building Owner: Rocky Mountain Power
Address: 3133 West 900 South Address: 1407 West North Temple, Room 110
City, State, Zip: Salt Lake City, Utah 84104 City, State, Zip: Salt Lake City, Utah 84116
Facility I.D.#: 4001061 Phone #: 801-220-2335
Testing Company: Westech Phone #: 801-266-2545 Date: 9/10/24
This procedure is to determine whether the automatic tank gauge (ATG) is operating properly. See PEI/RP1200 Section 8.2 for the inspection
procedure. This procedure is applicable to tank monitor stems that touch the bottom of the tank when in place.
Tank Number 1 2
Product Stored RUL DSL
ATG Brand and Model TLS-350 TLS-350
1. Tank Volume, gallons 11,527 11,527
2. Tank Diameter, inches 92 92
3. After removing the ATG from the tank, it has been
inspected and any damaged or missing parts replaced? ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No
4. Float moves freely on the stem without binding? ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No
5. Fuel float level agree with the value programmed
into the console? ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No
6. Water float level agree with the value programmed
into the console? ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No
7. Inch level from the bottom of the stem when 90%
alarm is triggered? 76 3/4 76 3/4
8. Inch level at which the overfill alarm activates
corresponds with the value programmed in the
gauge?
☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No
9. Inch level from the bottom when the water float
first triggers an alarm? 1.5 1.5
10. Inch level at which the water float alarm activates
corresponds with the value programmed in the
gauge?
☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No
If any answers in Lines 3, 4, 5, or 6 are "No" the system has failed the test.
Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail
Comments: Battery OK.
Tester’s Name Taber DeHart, UT-0394 Tester’s Signature
WESTECH EQUIPMENT
195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307
801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054
LIQUID SENSER FUNCTIONALITY TESTING
Facility Name: Utah Transportation Building Owner: Rocky Mountain Power
Address: 3133 West 900 South Address: 1407 West North Temple, Room 110
City, State, Zip: Salt Lake City, Utah 84104 City, State, Zip: Salt Lake City, Utah 84116
Facility I.D.#: 4001061 Phone #: 801-220-2335
Testing Company: Westech Phone #: 801-266-2545 Date: 9/10/24
This procedure is to determine whether liquid sensors, located in the interstitial spaces of the UST systems, are able to det ect the presence of water and fuel. See
PEI/RP1200, Section 8.3 for the test procedure.
Sensor Location L1 E STP L2 W STP L3 E STP L4 W STP L5 UDC 1/2 L6 UDC 3/4 L7 HF UDC
Product Stored RUL RUL DSL DSL RUL/DSL RUL/DSL RUL
Type of Sensor
☐ Discriminating
☒ Non-Discrimi-
nating
☐ Discriminating
☒ Non-Discrimi-
nating
☐ Discriminating
☒ Non-Discrimi-
nating
☐ Discriminating
☒ Non-Discrimi-
nating
☐ Discriminating
☒ Non-Discrimi-
nating
☐ Discriminating
☒ Non-Discrimi-
nating
☐ Discriminating
☒ Non-Discrimi-
nating
Test Liquid ☒ Water
☐ Product
☒ Water
☐ Product
☒ Water
☐ Product
☒ Water
☐ Product
☒ Water
☐ Product
☒ Water
☐ Product
☒ Water
☐ Product
Is the ATG Console clear of any active or
recurring warnings or alarms regarding
the leak sensor? If the sensor is in alarm
and functioning, indicate why.
☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No
Is sensor alarm circuit
operational? ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No
Has sensor been inspected and in good
operating condition? ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No
When placed in test liquid, does the
sensor trigger an alarm? ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No
When alarm is trigger, is the sensor
identified on the ATG console? ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No
Any “No” answers indicate the sensor fails the test.
Test Results: ☒ Pass ☐ Fail ☒ Pass ☐ Fail ☒ Pass ☐ Fail ☒ Pass ☐ Fail ☒ Pass ☐ Fail ☒ Pass ☐ Fail ☒ Pass ☐ Fail
Comments:
Tester’s Name: Taber DeHart, UT-0394 Tester’s Signature
WESTECH EQUIPMENT
195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307
801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054
LIQUID SENSER FUNCTIONALITY TESTING
Facility Name: Utah Transportation Building Owner: Rocky Mountain Power
Address: 3133 West 900 South Address: 1407 West North Temple, Room 110
City, State, Zip: Salt Lake City, Utah 84104 City, State, Zip: Salt Lake City, Utah 84116
Facility I.D.#: 4001061 Phone #: 801-220-2335
Testing Company: Westech Phone #: 801-266-2545 Date: 9/10/24
This procedure is to determine whether liquid sensors, located in the interstitial spaces of the UST systems, are able to detect the presence of water and fuel. See
PEI/RP1200, Section 8.3 for the test procedure.
Sensor Location L8 HF UDC C1 INTERSTICE C2 INTERSTICE
Product Stored DSL RUL DSL
Type of Sensor
☐ Discriminating
☒ Non-Discrimi-
nating
☐ Discriminating
☒ Non-Discrimi-
nating
☐ Discriminating
☒ Non-Discrimi-
nating
☐ Discriminating
☐ Non-Discrimi-
nating
☐ Discriminating
☐ Non-Discrimi-
nating
☐ Discriminating
☐ Non-Discrimi-
nating
☐ Discriminating
☐ Non-Discrimi-
nating
Test Liquid ☒ Water
☐ Product
☒ Water
☐ Product
☒ Water
☐ Product
☐ Water
☐ Product
☐ Water
☐ Product
☐ Water
☐ Product
☐ Water
☐ Product
Is the ATG Console clear of any active or
recurring warnings or alarms regarding
the leak sensor? If the sensor is in alarm
and functioning, indicate why.
☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No
Is sensor alarm circuit
operational? ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No
Has sensor been inspected and in good
operating condition? ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No
When placed in test liquid, does the
sensor trigger an alarm? ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No
When alarm is trigger, is the sensor
identified on the ATG console? ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No
Any “No” answers indicate the sensor fails the test.
Test Results: ☒ Pass ☐ Fail ☒ Pass ☐ Fail ☒ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail
Comments:
Tester’s Name: Taber DeHart, UT-0394 Tester’s Signature
WESTECH EQUIPMENT
195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307
801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054
UST OVERFILL EQUIPMENT INSPECTION
AUTOMATIC SHUTOFF DEVICE AND BALL FLOAT VALVE
Facility Name: Utah Transportation Building Owner: Rocky Mountain Power
Address: 3133 West 900 South Address: 1407 West North Temple, Room 110
City, State, Zip: Salt Lake City, Utah 84104 City, State, Zip: Salt Lake City, Utah 84116
Facility I.D.#: 4001061 Phone #: 801-220-2335
Testing Company: Westech Phone #: 801-266-2545 Date: 9/10/24
This data sheet is for inspecting automatic shutoff devices and ball float valve. See PEI/RP1200 Section 7 for inspection procedures.
Product Grade RUL RUL
Tank Number 1 1
Tank Volume, gallons 11,527 11,527
Tank Diameter, inches 89.75 89.75
Overfill Prevention Device Brand OPW OPW
Type ☒ Automatic
Shutoff Device
☐ Ball Float
Valve
☒ Automatic
Shutoff Device
☐ Ball Float
Valve
☐ Automatic
Shutoff Device
☐ Ball Float
Valve
☐ Automatic
Shutoff Device
☐ Ball Float
Valve
AUTOMATIC SHUTOFF DEVICE INSPECTION
1. Drop tube removed from tank? ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No
2. Drop tube and float mechanisms free of debris? ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No
3. Float moves freely without binding and poppet moves
into flow path? ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No
4. Bypass valve in the drop tube open and free of
blockage (if present)?
☒Yes ☐No
☐Not Present
☒Yes ☐No
☐Not Present
☐Yes ☐No
☐Not Present
☐Yes ☐No
☐Not Present
5. Flapper adjusted to shut off flow at 95% capacity? * ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No
A "No" to any item in Lines 1-5 indicates a test failure.
BALL FLOAT VALVE INSPECTION**
1. Tank top fitting vapor-tight and leak free? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No
2. Ball float cage free of debris? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No
3. Ball free of holes and cracks and moves freely in cage? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No
4. Vent hole in pipe open and near top of tank? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No
5. Ball float pipe proper length to restrict flow to 90%
capacity? *** ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No
A "No" to any item in Lines 1-5 indicates a test failure.
Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail
Comments:
*Use manufacturer’s suggested procedure for determining if automatic shutoff device will shut off flow at 95% capacity.
**If a ball float valve is found to fail the inspection, another method of overfill must be used.
***Use manufacturer’s suggested procedure for determining if flow restriction device will restrict flow at 90% capacity.
Tester’s Name Taber DeHart, UT-0394 Tester’s Signature
WESTECH EQUIPMENT
195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307
801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054
CONTAINMENT SUMP INTEGRITY TESTING
HYDROSTATIC TESTING METHOD
Facility Name: Utah Transportation Building Owner: Rocky Mountain Power
Address: 3133 West 900 South Address: 1407 West North Temple, Room 110
City, State, Zip: Salt Lake City, Utah 84104 City, State, Zip: Salt Lake City, Utah 84116
Facility I.D.#: 4001061 Phone #: 801-220-2335
Testing Company: Westech Phone #: 801-266-2545 Date: 9/10/24
This procedure is to test the leak integrity of containment sumps. See PEI/RP1200 Section 6.5 for the inspection procedure.
Containment Sump ID RUL STP RUL HF STP DSL STP DSL HF STP
Containment Sump Material FRP FRP FRP FRP
Liquid and debris removed from sump?* ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No
Visual Inspection (No cracks, loose parts or separation of
the containment sump.) ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No
Containment Sump Depth 50” 53” 50” 53”
Height From Bottom to Top of Highest Penetration 17” 17” 19” 19”
Starting Water Level 21” 21 1/8” 23 3/4” 23 3/4”
Test Start Time 12:18 10:38 12:18 10:38
Ending Water Level 21” 21 1/8” 23 3/4” 23 3/4”
Test End Time 1:18 11:38 1:18 11:38
Test Period (Minimum test time: 1 hour) 1 Hour 1 Hour 1 Hour 1 Hour
Water Level change 0” 0” 0” 0”
Pass/fail Criteria: Must pass visual inspection. Water level drop of less than 1/8 inch.
Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☒Pass ☐Fail ☒Pass ☐Fail
Comments:
*All Liquids and debris must be disposed of properly.
Tester’s Name Taber DeHart, UT-0394 Tester’s Signature
WESTECH EQUIPMENT
195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307
801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054
CONTAINMENT SUMP INTEGRITY TESTING
HYDROSTATIC TESTING METHOD
Facility Name: Utah Transportation Building Owner: Rocky Mountain Power
Address: 3133 West 900 South Address: 1407 West North Temple, Room 110
City, State, Zip: Salt Lake City, Utah 84104 City, State, Zip: Salt Lake City, Utah 84116
Facility I.D.#: 4001061 Phone #: 801-220-2335
Testing Company: Westech Phone #: 801-266-2545 Date: 9/12/24
This procedure is to test the leak integrity of containment sumps. See PEI/RP1200 Section 6.5 for the inspection procedure.
Containment Sump ID UDC 1/2 UDC 3/4 RUL Hi-Flo DSL Hi-Flo
Containment Sump Material Poly Poly Poly Poly
Liquid and debris removed from sump?* ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No
Visual Inspection (No cracks, loose parts or separation of
the containment sump.) ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No
Containment Sump Depth 29” 29” 29” 29”
Height From Bottom to Top of Highest Penetration 16” 14” 13” 13”
Starting Water Level 23 3/8” 22 3/8” 17 1/8” 17”
Test Start Time 9:39 9:39 9:39 9:39
Ending Water Level 23 3/8” 22 3/8” 17 1/8” 17”
Test End Time 10:44 10:44 10:44 10:44
Test Period (Minimum test time: 1 hour) 1 Hour 1 Hour 1 Hour 1 Hour
Water Level change 0” 0” 0” 0”
Pass/fail Criteria: Must pass visual inspection. Water level drop of less than 1/8 inch.
Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☒Pass ☐Fail ☒Pass ☐Fail
Comments:
*All Liquids and debris must be disposed of properly.
Tester’s Name Taber DeHart, UT-0394 Tester’s Signature
WESTECH EQUIPMENT
195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307
801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054
PIPING SECONDARY CONTAINMENT INTEGRITY TESTING
Facility Name: Utah Transportation Building Owner: Rocky Mountain Power
Address: 3133 West 900 South Address: 1407 West North Temple, Room 110
City, State, Zip: Salt Lake City, Utah 84104 City, State, Zip: Salt Lake City, Utah 84116
Facility I.D.#: 4001061 Phone #: 801-220-2335
Testing Company: Westech Phone #: 801-266-2545 Date: 9/12/24
This procedure is to test the integrity of the interstitial space of double-walled piping. See PEI/RP1200 Section 5 for the test procedure.
Tank Number 1 1 2 2
Piping Run RUL RUL Hi-Flo DSL DSL Hi-Flo
Piping Material D/W Flex D/W Flex D/W Flex D/W Flex
Product Stored RUL RUL DSL DSL
Test Start Time 9:39 9:39 9:39 9:39
Initial Test Pressure, psig (test procedure specifies 5 psig.) 5 5 5 5
Test End Time 10:44 10:44 10:44 10:44
Final Test Pressure, psig 5 5 5 5
Pressure Change (No reduction in pressure allowed for
pass.) 0 0 0 0
Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☒Pass ☐Fail ☒Pass ☐Fail
Comments:
Tester’s Name Taber DeHart, UT-0394 Tester’s Signature
WESTECH EQUIPMENT
195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307
801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054
PRESSURE/VACUUM VENT CAP
LEAK RATES AND OPENING PRESSURES
Facility Name: Utah Transportation Building Owner: Rocky Mountain Power
Address: 3133 West 900 South Address: 1407 West North Temple, Room 110
City, State, Zip: Salt Lake City, Utah 84104 City, State, Zip: Salt Lake City, Utah 84116
Facility I.D.#: 4001061 Phone #: 801-220-2335
Testing Company: Westech Phone #: 801-266-2545 Date: 9/10/24
This procedure is to determine pressure/vent cap specifications. See 40 CFR 63 CCCCCC for the inspection procedure.
Tank Number 1
Product Grade RUL
PV Manufacturer OPW
Model Number 623V
PRESSURE TEST
Passing 2” Leak Rate (CFH) <0.05
Measured 2” Leak Rate (CFH) New Cap
Passing Positive Opening Pressure (Inches WC) 2.5 – 6.0
Measured Positive Opening Pressure (Inches WC) New Cap
VACUUM TEST
Passing -4” Leak Rate (CFH) <0.21
Measured -4” Leak Rate (CFH) New Cap
Passing Negative Opening Pressure (Inched WC) 6.0 – 10.0
Measured Negative Opening Pressure (Inched WC) New Cap
Test Results ☒Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail
Comments: New pressure/vent cap installed 9/10/24.
Tester’s Name Taber DeHart, UT-0394 Tester’s Signature