DRC-2024-007090
Energy Solutions / Class A West Final Cover Phase 6 Schedule 2024 Activity ID Activity Description Orig Dur Rem Dur Early Start Early Finish % 08 JUL 2024 15 AUG 2025 22 SEP 29 OCT 05 NOV 12 DEC 19 JAN 26 02 09 16 23 30 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 Project Duration Summary 100 Total Working Days 68 *38 *20AUG24 A 21NOV24 44 110 Total Calendar Days 94 *52 *20AUG24 A 21NOV24 45 Mobilization / Project Setup 200 Pre-Construction Meeting - Phase 6 0 0 20JUN24 A 100 210 100Mobilization Project Support Equipment 5 0 05AUG24 A 12AUG24 A 100 220 Project Access Preparation / Safety Training 1 0 13AUG24 A 13AUG24 A 100 Radon Barrier Activities 300 Earthwork Duration - Phase 6 88 *10 *15JUL24 A 10OCT24 89 310 Mine and Process Radon Barrier 5x10-8 Clay Layer 15 0 15JUL24 A 26JUL24 A 100 320 Radon Barrier 1x10-6 Clay Layer 12 0 20AUG24 A 05SEP24 A 100 330 Radon Barrier 5x10-8 (Top) Clay Layer 8 0 06AUG24 A 19SEP24 A 100 340 Radon Barrier 5x10-8 (Side Slope) Clay Layer 6 0 20SEP24 A 26SEP24 A 100 350 Finish Grading & Perimeter Ditch Clay Backfill 10 8 27SEP24 A 10OCT24 20 Filter and Protection Layers 400 Filter and Protection Duration - Phase 6 30 *30 *04OCT24 *14NOV24 0 410 Type B Filter Zone Placement & Grading 6 6 04OCT24 *11OCT24 0 420 Sacrificial Soil Placement & Grading 7 7 14OCT24 22OCT24 0 430 Type A Filter Zone Placement 7 7 22OCT24 30OCT24 0 440 Type B Rip Rap Placement & Grading 7 7 30OCT24 07NOV24 0 450 Type A Rip Rap Placement 6 6 07NOV24 14NOV24 0 460 Type A & Type B Rip Rap Tie-in and Access Way 4 4 11NOV24 14NOV24 0 Drainage Improvements / Haul Road Construction 500 Drainage and Access Improvements 3 *3 *15NOV24 19NOV24 0 510 Provide and Place 8 oz. Geotextile / Sandbags 3 3 15NOV24 19NOV24 0 520 Inspection / Haul Road W/30-30 Combi Grid 4 4 14NOV24 19NOV24 0 Completion & Certification 700 Project Cleanup & Demobilization 2 2 20NOV24 21NOV24 0 710 Project Completed & Accepted 0 0 21NOV24 0 Total Working Days Total Calendar Days Pre-Construction Meeting - Phase 6 100Mobilization Project Support Equipment Project Access Preparation / Safety Training Earthwork Duration - Phase 6 Mine and Process Radon Barrier 5x10-8 Clay Layer Radon Barrier 1x10-6 Clay Layer Radon Barrier 5x10-8 (Top) Clay Layer Radon Barrier 5x10-8 (Side Slope) Clay Layer Finish Grading & Perimeter Ditch Clay Backfill Filter and Protection Duration - Phase 6 Type B Filter Zone Placement & Grading Sacrificial Soil Placement & Grading Type A Filter Zone Placement Type B Rip Rap Placement & Grading Type A Rip Rap Placement Type A & Type B Rip Rap Tie-in and Access Way Drainage and Access Improvements Provide and Place 8 oz. Geotextile / Sandbags Inspection / Haul Road W/30-30 Combi Grid Project Cleanup & Demobilization Project Completed & Accepted Early start point Early finish point Early bar Progress bar Critical bar Summary bar Progress point Critical point Summary point Start milestone point Finish milestone point Project Owner - Energy Solutions Contractor - Broken Arrow Inc. Date Revision Checked Approved 01OCT24 D.Cummings SM DC 17SEP24 D.Cummings SM DC 10SEP24 D.Cummings SM DC 03SEP24 D.Cummings SM DC Start date 20JUN24 Finish date 21NOV24 Data date 01OCT24 Run date 01OCT24 Page number 1A © Primavera Systems, Inc.