DAQC-1163-24
Site ID 10655 (B1)
Jeffery Cowlishaw
Staker Parson Companies
2350 South 1900 West
Ogden, UT 84401
Dear Mr. Cowlishaw:
Re: Staker Parson Companies – Temporary Relocation/Operation, Notice of Intent – Sevier
County
Your Notice of Intent dated November 13, 2024, and modified on November 22, 2024, to relocate
portable aggregate equipment to the temporary project for the former Cox/Hales Sand and Gravel
Pit, located at 1400 South 180 West, Elsinore, Utah, was received by the Utah Division of Air
Quality (DAQ) and has been reviewed.
The following equipment has been approved for operation for this temporary project:
Jaw crusher
Two (2) cone crushers
Five (5) screens
725 kW generator
820 kW generator
This equipment has been permitted for operation in the State of Utah by the portable Staker
Parson Companies Approval Order (AO) DAQE-AN115180014-15, dated July 6, 2015. The
above location is a permanent aggregate processing site with established production limits. All
equipment operating at this site must be in accordance with the current AO for this facility dated
February 7, 1986 (no document number). As per Condition 3 of this AO, the aggregate equipment
cannot process more than 450 tons per hour of gravel. The generator engines shall use low sulfur
diesel fuel and operate within the 20% opacity limit of Condition II.B.10.b of the portable AO.
" " * " / Ü Û Ù Û Ý
DAQC-1163-24
Page 2
The owner/operator shall maintain records of the actual operation days, hours, and production
rate, of the above referenced equipment at this relocation site and have the ability to submit the
information to the DAQ upon the request of representatives of the director. Please make certain
that the plant operator is aware of all the location specific requirements for this site and the
conditions of the aforementioned AO.
Federal New Source Performance Standards Subpart OOO requires that initial Method 9
observations be performed for all applicable portable crushers, screens, and attached conveyors.
Subpart OOO also mandates that all crushers constructed, modified, or reconstructed on or after
April 22, 2008, which are not enclosed, must install spray bars on the equipment and keep
maintenance records to ensure proper spray bar operations.
Utah Division of Water Quality Storm Water Permits and regulations may apply to this temporary
project. Please refer to Utah DEQ Water Quality’s current Storm Water Construction
requirements for additional information.
This approval for relocation in no way releases the owner or operator from any liability for
compliance with all other applicable federal, state, and local regulations including the UAC.
If you have any questions regarding this relocation authorization or the temporary relocation
process please contact Susan Weisenberg at (385) 306-6512.
Sincerely,
Jay P. Morris
Assistant Director
JPM:SW:rh
Enclosure: Submitted Temporary Relocation Form
cc: Central Utah Public Health Department
4 * - - $ . — A v A ? A C ? G w C H ˜
Susan Weisenberg <sweisenberg@utah.gov>
[WARNING: MESSAGE ENCRYPTED]TRP location change
1 message
Rose, Chris (Staker & Parson Companies) <chris.rose@stakerparson.com>Fri, Nov 22, 2024 at 2:30 PM
To: Susan Weisenberg <sweisenberg@utah.gov>
Cc: Chad Gilgen <cgilgen@utah.gov>
Susan,
Thanks for taking my call. As we discussed, a recent TRP request was submitted by J Cowlishaw to move crushing
equipment to Hales Sand and Gravel in Centerfield. An administrative decision now has the same crushing equipment set
to move to Hales’ Elsinore site instead. Instead of having to pay for two TRPs, can we just switch the location to Elsinore
in place of Centerfield?
For reference, I’ve attached our most recent TRP to Elsinore. After talking to the manager there, the existing crushing
equipment will be moved out of the site shortly after the new crushing equipment moves in. The existing TRP (DAQC-
1063-24) has a rental track crusher processing RAP, while the new equipment will process virgin material.
Thank you,
Christopher Rose
Environmental Specialist
West Division
Staker Parson
A CRH COMPANY
89 West 13490 South
Draper, Utah 84020
C +1 (385) 400 2119
E chris.rose@stakerparson.com
Temp Relo- Rental crusher to Elsinore.pdf
318K
11/26/24, 11:42 AM State of Utah Mail - [WARNING: MESSAGE ENCRYPTED]TRP location change
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1816459750442408829%7Cmsg-f:1816459750442408829&s…1/1
Susan Weisenberg <sweisenberg@utah.gov>
Portable/Temporary Relocation Form
1 message
noreply@qemailserver.com <noreply@qemailserver.com>Wed, Nov 13, 2024 at 3:57 PM
Reply-To: trigger@qemailserver.com
To: sweisenberg@utah.gov
Susan/Chad:
Site # -- Staker Parson Companies has requested a Temporary Relocation. Please see the information below. Any
attachments can be access by clicking on the links.
Recipient Data:
Time Finished: 2024-11-13 15:57:17 MST
IP: 165.225.10.107
ResponseID: R_7nqhdOWfaCHcgk3
Link to View Results: Click Here
URL to View Results: https://utahgov.iad1.qualtrics.com/apps/single-response-reports/reports/
9BrdZGecmQw2UNzWvyetibfkEGxRdRfAEmMeLDzHYcr9-KjV8X9U1f1WEyHFD8kktryMUKNHdQM
R77bEehiTIe7ITj3hjpimC0p2X3P2s9W5n0yD8HFAf2m2Bhc6KE3u0u5xoduAdLpsuM1dbooYaFxVpmgDOzpyoSDqX
YwrLEHAjlrIIuBZzbK2VWTRvA9SkngUTJ-X%2EU38BIFKmjr8jZGlQJMUIAsjB3F7pc2asDbRnOAYu4hVVIRlQPXm9iQI%
2EVKuqo-Xrb19V4uQHswD3MTA0-SP4%2EcGiNv53RXctnGoMUUbQfxUr0vE-Gabk6k6sBlCz2uBEcEGsJwvj5DAeA
Response Summary:
Please fill out the information below:
Contact Person: Jeffery Cowlishaw
Company Name: Staker Parson Companies
Mailing Address: 2350 S 1900 W
City: Ogden
Zip: 84401
Phone Number: 3854054315
Email: jeffery.cowlishaw@stakerparson.com
Is the site located within a PM2.5 non-attainment and maintenance plan areas on cleared land grea...
No
All temporary relocation projects are required to submit a Fugitive Dust Control Plan (FDCP). Lo...
: 52071A4215
Briefly give directions to the site and/or physical address:
350 E 400 N Centerfield, UT 84622
Proposed Relocation Information:
Closest City Centerfield
County Sanpete
UTM X Coordinates 430632.97
UTM Y Coordinates 4331912.03
Approximate distance to the nearest house/business 1,450 Ft.
UTM X Coordinates to nearest house/business 430688.67
UTM Y Coordinates to nearest house/business 4332343.14
Does this site currently have a permit with DAQ?
Yes
11/18/24, 12:40 PM State of Utah Mail - Portable/Temporary Relocation Form
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1815649868258451803%7Cmsg-f:1815649868258451803&s…1/2
If yes, what is the Permit (DAQ-AN) # ?
DAQ-390-89
If yes, what is the Permit Holder's Name?
Cox Rock Products
Please provide the permit ID for the equipment? (DAQE-XXXXXXXXX-XX)
DAQE-AN115180014-15
Please list all the Equipment on Site:Note: It is important to identify ALL diesel powered engine...
1
Equipment Type Jaw Crusher
Serial or ID# II.A.2
Design Capacity 500 TPH
2
Equipment Type Cone Crusher
Serial or ID# II.A.3
Design Capacity 500 TPH
3
Equipment Type Cone Crusher
Serial or ID# II.A.108
Design Capacity 500 TPH
4
Equipment Type Screens (5)
Serial or ID# II.A.134
Design Capacity 500 TPH
5
Equipment Type Generator
Serial or ID# II.A.703
Design Capacity 725kW
6
Equipment Type Generator
Serial or ID# II.A.717
Design Capacity 820kW
Please attach a site diagram showing the equipment layout and general site dimensions for this re...
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_3fNJGYeBIhDN4Gv
Have any other state or local regulatory agencies issued any other "Conditional Use Permits" for...
No
Operational Information: (Please note: Operating time over 16 hours in a 24 hour period will re...
Total Hours of operation per 24 hr period 16
Starting time of operation (am/pm) 6am
Ending time of operation (am/pm) 10pm
Maximum hourly production rate for project 500TPH
Expected startup date 11/29/2024
Expected completion date 11/28/2025
What type of application is this for?
New Application
In accordance with the fee schedule approved by the Utah State Legislature, the Division of Air Q...
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_brcWcN0wibcBAKB
Owner/Operator Representative:
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_2Xb7r81tXRaeDKb
11/18/24, 12:40 PM State of Utah Mail - Portable/Temporary Relocation Form
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1815649868258451803%7Cmsg-f:1815649868258451803&s…2/2