DRC-2024-007129
Energy Solutions / Class A West Final Cover Phase 6 Schedule 2024 Activity ID Activity Description Orig Dur Rem Dur Early Start Early Finish % JUL 2024 AUG 2025 SEP OCT NOV DEC JAN Project Duration Summary 100 Total Working Days 71 *34 *20AUG24 A 26NOV24 52 110 Total Calendar Days 99 *48 *20AUG24 A 26NOV24 52 Mobilization / Project Setup 200 Pre-Construction Meeting - Phase 6 0 0 20JUN24 A 100 210 100Mobilization Project Support Equipment 5 0 05AUG24 A 12AUG24 A 100 220 Project Access Preparation / Safety Training 1 0 13AUG24 A 13AUG24 A 100 Radon Barrier Activities 300 Earthwork Duration - Phase 6 86 *0 *15JUL24 A 08OCT24 A 100 310 Mine and Process Radon Barrier 5x10-8 Clay Layer 15 0 15JUL24 A 26JUL24 A 100 320 Radon Barrier 1x10-6 Clay Layer 12 0 20AUG24 A 05SEP24 A 100 330 Radon Barrier 5x10-8 (Top) Clay Layer 8 0 06AUG24 A 19SEP24 A 100 340 Radon Barrier 5x10-8 (Side Slope) Clay Layer 6 0 20SEP24 A 26SEP24 A 100 350 Finish Grading & Perimeter Ditch Clay Backfill 10 0 27SEP24 A 08OCT24 A 100 Filter and Protection Layers 400 Filter and Protection Duration - Phase 6 30 *29 *09OCT24 A 19NOV24 3 410 Type B Filter Zone Placement & Grading 6 5 09OCT24 A 16OCT24 17 420 Sacrificial Soil Placement & Grading 7 7 17OCT24 25OCT24 0 430 Type A Filter Zone Placement 7 7 25OCT24 04NOV24 0 440 Type B Rip Rap Placement & Grading 7 7 04NOV24 12NOV24 0 450 Type A Rip Rap Placement 6 6 12NOV24 19NOV24 0 460 Type A & Type B Rip Rap Tie-in and Access Way 4 4 14NOV24 19NOV24 0 Drainage Improvements / Haul Road Construction 500 Drainage and Access Improvements 3 *3 *20NOV24 22NOV24 0 510 Provide and Place 8 oz. Geotextile / Sandbags 3 3 20NOV24 22NOV24 0 520 Inspection / Haul Road W/30-30 Combi Grid 4 4 19NOV24 22NOV24 0 Completion & Certification 700 Project Cleanup & Demobilization 2 2 25NOV24 26NOV24 0 710 Project Completed & Accepted 0 0 26NOV24 0 Total Working Days Total Calendar Days Pre-Construction Meeting - Phase 6 100Mobilization Project Support Equipment Project Access Preparation / Safety Training Earthwork Duration - Phase 6 Mine and Process Radon Barrier 5x10-8 Clay Layer Radon Barrier 1x10-6 Clay Layer Radon Barrier 5x10-8 (Top) Clay Layer Radon Barrier 5x10-8 (Side Slope) Clay Layer Finish Grading & Perimeter Ditch Clay Backfill Filter and Protection Duration - Phase 6 Type B Filter Zone Placement & Grading Sacrificial Soil Placement & Grading Type A Filter Zone Placement Type B Rip Rap Placement & Grading Type A Rip Rap Placement Type A & Type B Rip Rap Tie-in and Access Way Drainage and Access Improvements Provide and Place 8 oz. Geotextile / Sandbags Inspection / Haul Road W/30-30 Combi Grid Project Cleanup & Demobilization Project Completed & Accepted Early start point Early finish point Early bar Progress bar Critical bar Summary bar Progress point Critical point Summary point Start milestone point Finish milestone point Project Owner - Energy Solutions Contractor - Broken Arrow Inc. Date Revision Checked Approved 10OCT24 D.Cummings SM DC 01OCT24 D.Cummings SM DC 17SEP24 D.Cummings SM DC 10SEP24 D.Cummings SM DC Start date 20JUN24 Finish date 26NOV24 Data date 10OCT24 Run date 10OCT24 Page number 1A © Primavera Systems, Inc.