Loading...
HomeMy WebLinkAboutDRC-2024-007181Deq submit <dwmrcsubmit@utah.gov> Fwd: FW: [EXTERNAL] Schedule for CAW Phase 6 Cover Updated on October 14, 2024 1 message LLRW DWMRC <llrw@utah.gov>Tue, Oct 15, 2024 at 12:56 PM To: Deq submit <dwmrcsubmit@utah.gov> DRC ---------- Forwarded message --------- From: Garrett Q. Dutson <gqdutson@energysolutions.com> Date: Tue, Oct 15, 2024 at 9:40 AM Subject: FW: [EXTERNAL] Schedule for CAW Phase 6 Cover Updated on October 14, 2024 To: llrw@utah.gov <LLrw@utah.gov>, cromano@utah.gov <cromano@utah.gov> Cc: Todd L. Stewart <tlstewart@energysolutions.com>, Shauna L. Watkins <slwatkins@energysolutions.com>, James M. Cason <jmcason@energysolutions.com>, Marissa R. Sotelo <mrsotelo@energysolutions.com>, Dave Booth <dbooth@energysolutions.com>, Vern C. Rogers <vcrogers@energysolutions.com>, Brennon Dick <bdick@energysolutions.com> Here is the updated schedule. Garrett Q. Dutson, PE Project Engineer IV, Clive ENERGYSOLUTIONS 299 South Main Street Suite 1700 Salt Lake City, UT 84111 Direct: 801.649.2156 Cell: 801.721.1425 Email: gqdutson@energysolutions.com From: dcummings@brokenarrowusa.com <dcummings@brokenarrowusa.com> Sent: Monday, October 14, 2024 3:10 PM To: Shauna L. Watkins <slwatkins@energysolutions.com>; Todd L. Stewart <tlstewart@energysolutions.com>; Garre Q. Dutson <gqdutson@energysolutions.com>; shanemartin39@yahoo.com; kcummings@brokenarrowusa.com; 'Jared Bunn' <jbunn@brokenarrowusa.com> Subject: [EXTERNAL] Schedule for CAW Phase 6 Cover Updated on October 14, 2024 10/15/24, 4:36 PM State of Utah Mail - Fwd: FW: [EXTERNAL] Schedule for CAW Phase 6 Cover Updated on October 14, 2024 https://mail.google.com/mail/b/AEoRXRQ8BweGx5YosWzgZ9JF9p5D15YYW92aN62-725968WhwX1y/u/0/?ik=adf9d5e615&view=pt&search=all&per…1/2 EXTERNAL: This message is from a NON-EnergySoluons sender, please ensure it is from a legimate source. DO NOT click links or open aachments if sender is unknown or the message seems suspicious in any way. Good Afternoon All, The Phase 6 Cover Project schedule update is attached. Regards, Dave David Cummings | SR. Vice President | Broken Arrow Inc. 8960 Clinton Landing Road | Lake Point | Utah | 84074 O: (801) 355-0527 | F: (801) 252-7501 | M: (435) 241-0010     2 attachments image001.gif 1K 2024 ES CAW PH6 Cover Sch Update 10.14.24.pdf 85K 10/15/24, 4:36 PM State of Utah Mail - Fwd: FW: [EXTERNAL] Schedule for CAW Phase 6 Cover Updated on October 14, 2024 https://mail.google.com/mail/b/AEoRXRQ8BweGx5YosWzgZ9JF9p5D15YYW92aN62-725968WhwX1y/u/0/?ik=adf9d5e615&view=pt&search=all&per…2/2 Energy Solutions / Class A West Final Cover Phase 6 Schedule 2024 Activity ID Activity Description Orig Dur Rem Dur Early Start Early Finish % JUL 2024 AUG 2025 SEP OCT NOV DEC JAN Project Duration Summary 100 Total Working Days 65 *26 *20AUG24 A 18NOV24 60 110 Total Calendar Days 91 *36 *20AUG24 A 18NOV24 60 Mobilization / Project Setup 200 Pre-Construction Meeting - Phase 6 0 0 20JUN24 A 100 210 100Mobilization Project Support Equipment 5 0 05AUG24 A 12AUG24 A 100 220 Project Access Preparation / Safety Training 1 0 13AUG24 A 13AUG24 A 100 Radon Barrier Activities 300 Earthwork Duration - Phase 6 86 *0 *15JUL24 A 08OCT24 A 100 310 Mine and Process Radon Barrier 5x10-8 Clay Layer 15 0 15JUL24 A 26JUL24 A 100 320 Radon Barrier 1x10-6 Clay Layer 12 0 20AUG24 A 05SEP24 A 100 330 Radon Barrier 5x10-8 (Top) Clay Layer 8 0 06AUG24 A 19SEP24 A 100 340 Radon Barrier 5x10-8 (Side Slope) Clay Layer 6 0 20SEP24 A 26SEP24 A 100 350 Finish Grading & Perimeter Ditch Clay Backfill 10 0 27SEP24 A 08OCT24 A 100 Filter and Protection Layers 400 Filter and Protection Duration - Phase 6 24 *21 *09OCT24 A 11NOV24 13 410 Type B Filter Zone Placement & Grading 6 0 09OCT24 A 11OCT24 A 100 420 Sacrificial Soil Placement & Grading 7 4 10OCT24 A 17OCT24 40 430 Type A Filter Zone Placement 7 7 17OCT24 25OCT24 0 440 Type B Rip Rap Placement & Grading 7 7 25OCT24 04NOV24 0 450 Type A Rip Rap Placement 6 6 04NOV24 11NOV24 0 460 Type A & Type B Rip Rap Tie-in and Access Way 4 4 06NOV24 11NOV24 0 Drainage Improvements / Haul Road Construction 500 Drainage and Access Improvements 3 *3 *12NOV24 14NOV24 0 510 Provide and Place 8 oz. Geotextile / Sandbags 3 3 12NOV24 14NOV24 0 520 Inspection / Haul Road W/30-30 Combi Grid 4 4 11NOV24 14NOV24 0 Completion & Certification 700 Project Cleanup & Demobilization 2 2 15NOV24 18NOV24 0 710 Project Completed & Accepted 0 0 18NOV24 0 Total Working Days Total Calendar Days Pre-Construction Meeting - Phase 6 100Mobilization Project Support Equipment Project Access Preparation / Safety Training Earthwork Duration - Phase 6 Mine and Process Radon Barrier 5x10-8 Clay Layer Radon Barrier 1x10-6 Clay Layer Radon Barrier 5x10-8 (Top) Clay Layer Radon Barrier 5x10-8 (Side Slope) Clay Layer Finish Grading & Perimeter Ditch Clay Backfill Filter and Protection Duration - Phase 6 Type B Filter Zone Placement & Grading Sacrificial Soil Placement & Grading Type A Filter Zone Placement Type B Rip Rap Placement & Grading Type A Rip Rap Placement Type A & Type B Rip Rap Tie-in and Access Way Drainage and Access Improvements Provide and Place 8 oz. Geotextile / Sandbags Inspection / Haul Road W/30-30 Combi Grid Project Cleanup & Demobilization Project Completed & Accepted Early start point Early finish point Early barProgress barCritical bar Summary bar Progress point Critical pointSummary pointStart milestone point Finish milestone point Project Owner - Energy Solutions Contractor - Broken Arrow Inc. Date Revision Checked Approved 14OCT24 D.Cummings SM DC 10OCT24 D.Cummings SM DC 01OCT24 D.Cummings SM DC 17SEP24 D.Cummings SM DC Start date 20JUN24 Finish date 18NOV24 Data date 14OCT24 Run date 14OCT24 Page number 1A © Primavera Systems, Inc.