HomeMy WebLinkAboutDERR-2024-012678VCP/Brownfields Section - Site Visit Report SITE NAME: Airport West / North Temple Landfill SITE LOCATION: Salt Lake City DATE OF SITE VISIT: 5 December 2024 PURPOSE OF SITE VISIT: DERR (David Bird) oversight of field activities at the Airport West VCP site. FIELD OBSERVATIONS: The DERR met SITLA’s contractor, NT Development (Eric Rice), Stantec (David Cline), and concrete crushing subcontractor (Staker Parsons) at the site (at ~9:00 am) to discuss the startup of crushing and processing of concrete to commence soon in the southwest portion of the site. NT Development indicated that the permit with DAQ is now in place, and they will forward a copy of it to me. We discussed the need for a certified ACM inspector to examine the windrows of concrete which will be placed approximately 18 to 24 inches in height with a final inspection of the stockpile before being loaded into the crusher. We discussed the need for dust control with a water truck, and how misting is preferred rather than application of water that can produce mud and puddles. The expected timeframe for the crushing of the concrete is 3 to 4 months. The DERR left the site at ~10:00 am. SPLIT SAMPLES COLLECTED: No IS THE WORK BEING PERFORMED IN A MANNER CONSISTENT WITH THE ACCEPTED WORKPLAN? N/A