HomeMy WebLinkAboutDRC-2024-007350Deq submit <dwmrcsubmit@utah.gov> Fwd: Schedule for CAW Phase 6 Cover Updated on October 23, 2024 1 message LLRW DWMRC <llrw@utah.gov>Thu, Oct 24, 2024 at 7:37 AM To: Deq submit <dwmrcsubmit@utah.gov> DRC ---------- Forwarded message --------- From: Shauna L. Watkins <slwatkins@energysolutions.com> Date: Thu, Oct 24, 2024 at 5:42 AM Subject: Schedule for CAW Phase 6 Cover Updated on October 23, 2024 To: carlo Romano (cromano@utah.gov) <cromano@utah.gov>, LLrw@utah.gov <LLrw@utah.gov> Cc: James M. Cason <jmcason@energysolutions.com>, Dave Booth <dbooth@energysolutions.com> Undated Schedule.   SHAUNA WATKINS Quality Assurance Specialist   ENERGYSOLUTIONS LLC 2235 S Saltbush Rd Grantsville, Ut 84029 O: 801-649-2072 C: 435-882-7841 slwatkins@energysolutions.com From: dcummings@brokenarrowusa.com <dcummings@brokenarrowusa.com> Sent: Wednesday, October 23, 2024 9:49 AM To: Shauna L. Watkins <slwatkins@energysolutions.com>; Todd L. Stewart <tlstewart@energysolutions.com>; Garre Q. Dutson <gqdutson@energysolutions.com>; shanemartin39@yahoo.com; kcummings@brokenarrowusa.com; 'Jared Bunn' <jbunn@brokenarrowusa.com> Subject: [EXTERNAL] Schedule for CAW Phase 6 Cover Updated on October 23, 2024 10/24/24, 4:01 PM State of Utah Mail - Fwd: Schedule for CAW Phase 6 Cover Updated on October 23, 2024 https://mail.google.com/mail/b/AEoRXRTMHFaU5A73bzD8e0XAsQPKOJCKZ7wbNG3fzVIeq6Mz7_xv/u/0/?ik=adf9d5e615&view=pt&search=all&per…1/2 EXTERNAL: This message is from a NON-EnergySoluons sender, please ensure it is from a legimate source. DO NOT click links or open aachments if sender is unknown or the message seems suspicious in any way. Good Morning All, The Phase 6 Cover Project schedule update is attached. Regards, Dave David Cummings | SR. Vice President | Broken Arrow Inc. 8960 Clinton Landing Road | Lake Point | Utah | 84074 O: (801) 355-0527 | F: (801) 252-7501 | M: (435) 241-0010     2 attachments image002.gif 1K 2024 ES CAW PH6 Cover Sch Update 10.23.24.pdf 86K 10/24/24, 4:01 PM State of Utah Mail - Fwd: Schedule for CAW Phase 6 Cover Updated on October 23, 2024 https://mail.google.com/mail/b/AEoRXRTMHFaU5A73bzD8e0XAsQPKOJCKZ7wbNG3fzVIeq6Mz7_xv/u/0/?ik=adf9d5e615&view=pt&search=all&per…2/2 Energy Solutions / Class A West Final Cover Phase 6 Schedule 2024 Activity ID Activity Description Orig Dur Rem Dur Early Start Early Finish % JUL 2024 AUG 2025 SEP OCT NOV DEC JAN Project Duration Summary 100 Total Working Days 63 *17 *20AUG24 A 14NOV24 73 110 Total Calendar Days 87 *23 *20AUG24 A 14NOV24 74 Mobilization / Project Setup 200 Pre-Construction Meeting - Phase 6 0 0 20JUN24 A 100 210 100Mobilization Project Support Equipment 5 0 05AUG24 A 12AUG24 A 100 220 Project Access Preparation / Safety Training 1 0 13AUG24 A 13AUG24 A 100 Radon Barrier Activities 300 Earthwork Duration - Phase 6 86 *0 *15JUL24 A 08OCT24 A 100 310 Mine and Process Radon Barrier 5x10-8 Clay Layer 15 0 15JUL24 A 26JUL24 A 100 320 Radon Barrier 1x10-6 Clay Layer 12 0 20AUG24 A 05SEP24 A 100 330 Radon Barrier 5x10-8 (Top) Clay Layer 8 0 06AUG24 A 19SEP24 A 100 340 Radon Barrier 5x10-8 (Side Slope) Clay Layer 6 0 20SEP24 A 26SEP24 A 100 350 Finish Grading & Perimeter Ditch Clay Backfill 10 0 27SEP24 A 08OCT24 A 100 Filter and Protection Layers 400 Filter and Protection Duration - Phase 6 22 *12 *09OCT24 A 07NOV24 46 410 Type B Filter Zone Placement & Grading 6 0 09OCT24 A 11OCT24 A 100 420 Sacrificial Soil Placement & Grading 7 0 10OCT24 A 17OCT24 A 100 430 Type A Filter Zone Placement 7 0 17OCT24 A 23OCT24 A 100 440 Type B Rip Rap Placement & Grading 7 7 23OCT24 31OCT24 0 450 Type A Rip Rap Placement 6 6 31OCT24 07NOV24 0 460 Type A & Type B Rip Rap Tie-in and Access Way 4 4 04NOV24 07NOV24 0 Drainage Improvements / Haul Road Construction 500 Drainage and Access Improvements 3 *3 *08NOV24 12NOV24 0 510 Provide and Place 8 oz. Geotextile / Sandbags 3 3 08NOV24 12NOV24 0 520 Inspection / Haul Road W/30-30 Combi Grid 4 4 07NOV24 12NOV24 0 Completion & Certification 700 Project Cleanup & Demobilization 2 2 13NOV24 14NOV24 0 710 Project Completed & Accepted 0 0 14NOV24 0 Total Working Days Total Calendar Days Pre-Construction Meeting - Phase 6 100Mobilization Project Support Equipment Project Access Preparation / Safety Training Earthwork Duration - Phase 6 Mine and Process Radon Barrier 5x10-8 Clay Layer Radon Barrier 1x10-6 Clay Layer Radon Barrier 5x10-8 (Top) Clay Layer Radon Barrier 5x10-8 (Side Slope) Clay Layer Finish Grading & Perimeter Ditch Clay Backfill Filter and Protection Duration - Phase 6 Type B Filter Zone Placement & Grading Sacrificial Soil Placement & Grading Type A Filter Zone Placement Type B Rip Rap Placement & Grading Type A Rip Rap Placement Type A & Type B Rip Rap Tie-in and Access Way Drainage and Access Improvements Provide and Place 8 oz. Geotextile / Sandbags Inspection / Haul Road W/30-30 Combi Grid Project Cleanup & Demobilization Project Completed & Accepted Early start point Early finish point Early bar Progress bar Critical bar Summary bar Progress point Critical point Summary pointStart milestone pointFinish milestone point Project Owner - Energy Solutions Contractor - Broken Arrow Inc. Date Revision Checked Approved 23OCT24 D.Cummings SM DC 14OCT24 D.Cummings SM DC 10OCT24 D.Cummings SM DC 01OCT24 D.Cummings SM DC Start date 20JUN24 Finish date 14NOV24 Data date 23OCT24 Run date 23OCT24 Page number 1A © Primavera Systems, Inc.