HomeMy WebLinkAboutDERR-2024-012583
195 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144840 • Salt Lake City, UT 84114-4840
Telephone (801) 536-4100 • Fax (801) 359-8853 • T.D.D. (801) 536-4284
www.deq.utah.gov
Printed on 100% recycled paper
State of Utah
SPENCER J. COX
Governor
DEIDRE HENDERSON
Lieutenant Governor
Department of
Environmental Quality
Kimberly D. Shelley
Executive Director
DIVISION OF ENVIRONMENTAL
RESPONSE AND REMEDIATION
Brent H. Everett
Director
ERRL-0102-24
March 15, 2024
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
Brent Miller
L.W. Miller, LLC
1050 West 200 North
Logan, Utah 84321
Re:Subsurface Investigation/Groundwater Monitoring Requirements
Aboveground Petroleum Storage Tank Release
LW’s Truck Stop, located at 1020 West 200 North, Logan, Utah
Facility Identification No. 0100611, Release Site MPA
Dear Mr. Miller:
On August 2, 2023, the Division of Environmental Response and Remediation (DERR)
received a Groundwater Monitoring Report for the above-referenced site. After reviewing
this information, the DERR project manager has recommended further investigation to determine
the full extent of subsurface contamination. During the groundwater monitoring activities on
July 15, 2023, groundwater samples were obtained indicating concentration above State-established
applicable standards.
Groundwater monitoring well MW-16 needs replacement. The groundwater contamination
needs further delineation to the south. Additionally, at least three more groundwater monitoring
events are required. Groundwater monitoring events should take place every nine months.
The Division Director requires that additional samples be collected to determine the full
vertical and horizontal extent and degree of any subsurface petroleum contamination. All
environmental samples must be collected by a Utah certified groundwater and soil sampler
following sampling protocol as outlined in Utah Admin. Code R311-205. A report outlining the
results of the first phase of work must be submitted to the DERR within 90 days of your receipt of
this letter. Follow-up groundwater monitoring reports must be submitted within 30 days of each
subsequent sampling event.
Facility ID# 0100611
Page 2
If you have any questions, please contact Eileen Brennan, the DERR project manager, at
(801) 536-4100.
Sincerely,
Brent H. Everett, Director
Division of Environmental Response and Remediation
BHE/EB/rr
cc: Jordan Mathis, Director, Bear River Health Department
David Hansen, Certified UST Consultant, Rockwell Solutions, Inc.
ti
~ ~
J