HomeMy WebLinkAboutDERR-2024-012485
SITE VISIT REPORT
DATE: 11/20/2024
SITE: Redwood Road Dump
SITE ADDRESS: 1850 West Indiana Avenue, Salt Lake City, UT
PREPARED BY: Allison Stanley
Utah Department of Environmental Quality
Division of Environmental Response and Remediation
195 North 1950 West
Salt Lake City, UT 84116
ATTENDEES: Allison Stanley (DERR), David Bird (DERR)
ARRIVAL TIME: 1:15 PM - DEPARTURE TIME: 2:00 PM
Is the work being performed in a manner consistent with the accepted workplan? Yes
SUMMARY: This was a routine site visit by the DERR to check on the status of the site. Work
is concentrated on the northern half of the Site as most of the lots are underway with various
stages of foundations. Approximately 5-10 tiny homes are now present. Per the approved
Remedial Action Plan (RAP) for the site, there must be vapor intrusion mitigation for all
residential and commercial structures. Most units will have foundations with crawl spaces,
including all the homes that are currently installed. Access to the crawl space will be from inside
the home. Work is still underway on the Pavilion.
Along the east side of the site, the road has been paved and is at a final elevation that is higher
than the east-adjoining properties, in accordance with the approved RAP. Large boulders have
been placed along the slope of the site and the east-adjoining properties. No work is occurring on
the southern half of the site.
PHOTO LOG:
Photo 1: First tiny homes on the site (north-west corner).
Photo 2: Two tiny home units that are elevated.
Photo 3: Inside access to crawl space.
Photo 4: View looking out of the tiny home.
Photo 5: Crawl space units currently sit on wooden planks resting over concrete foundations.
Photo 6: Cuts in wood to provide venting.
Photo 7: Foundation for two units.
Photo 8: Work is continuing on the Pavilion.
Photo 9: Large boulders have been placed along the slope of the site and the east-adjoining
properties.
Photo 10: No work is being conducted on southern portion of the site.