UNDERGROUND STORAGE TANK
INTERNAL INSPECTION REPORT
Two (2) 6,000-gallon USTs
Prepared for:
Johann Defa
Hanna Country Store
40928 W State Rd 35
Hanna UT 84031
5 November 2024
Lining Inspection of two (2) USTs
Guidance from the following:
Utah DEQ DERR R311 UAC
40 CFR § 280.21(b)(1)
API Publication 1631
NLPA Standard 631
NWTLI
UST & AST Inspections
Complete Site Compliance Testing & Upgrades
Industrial Protective Linings & Coatings
Fuel Polishing & Treatment
2
(888) TLC-TANK
Hanna Country Store 5 November 2024
40928 W State Rd 35
Hanna UT 84031
801-299-0888
801-205-7807 mobile
johanndefa@yahoo.com
Hanna Country Store contracted NWTLI to inspect interior lining system on two (2)
underground storage tanks (USTs) located at 40928 W State Rd 35, Hanna UT. The
contract was to complete the following: purge, open and enter confined space; clean out
interior of USTs and conduct an inspection of the interior lining using NPLA Standard 631
and API 1631 nationally recognized industry standards; reseat lid to form airtight seal at
entry point. A complete description of events is detailed below.
NWTLI field crew arrived on site 1 November 2024 to perform UST lining inspection work.
Excavation was required as manways were not available. Total depth to top of tanks
from grade was 3-4 feet deep. USTs were purged with eductor-type air mover (venturi)
to maximize air volume. Atmospheres inside each tank were checked for Lower
Explosion Level (LEL). When LEL was at a safe level, tanks were opened using
pneumatic tools. After each tank was opened, a certified confined space rescue worker
entered each tank with supplied air hood and fully protected clothing. USTs were cleaned
out and sludge was collected in 55-gallon barrels, and left on-site for owner disposal.
FINDINGS ON USTs:
Tank #1 Diesel was opened and cleaned out, interior striker plates were observed under
fill and monitoring ports as required by EPA. Inspection of tank interior found no evidence
of pitting, rusting, physical damage, water leakage, cracks, streaking, discoloration or
other signs of structural instability of the tan k or lining; a visual inspection of tank linings
was conducted and at least 98% of linings was visible for inspection; linings are still
performing according to original design specifications. There was no evidence of lining
peeling, blistering, wrinkled surface or surface roughening.
NWTLI
UST & AST Inspections
Complete Site Compliance Testing & Upgrades
Industrial Protective Linings & Coatings
Fuel Polishing & Treatment
3
(888) TLC-TANK
Tank #2 Regular was opened and cleaned out, interior striker plates were observed under
fill and monitoring ports as required by EPA. Inspection of tank interior found no evidence
of pitting, rusting, physical damage, water leakage, cracks, streaking, discoloration or
other signs of structural instability of the tank or lining; a visual inspection of tank linings
was conducted and at least 98% of linings was visible for inspection; linings are still
performing according to original design specifications. Th ere was no evidence of lining
peeling, blistering, wrinkled surface or surface roughening.
All tank linings were in compliance with industry standards and found to be in good
condition and free of any cracks, damage or de-laminations at the time of final inspection.
This report certifies that these inspected USTs are suitable for continued use for a
minimum of five (5) years. UST lids were reseated with gasket material and bolted on
entry points of USTs.
Photographs were taken to show work in progress, overall condition of tank s and lining
material, locations of interior openings and tank equipment.
Based on tests performed, lining systems of USTs appear to be in good condition. Prior
UST upgrade by installation of epoxy lining material has met State of Utah’s UST rules
and regulations, and Federal EPA’s requirements 40 CFR §280.21 Upgrading of existing
UST systems (b) (1) and in §280.33 Repairs allowed; National Leak Prevention
Association Standard 631 Entry, Cleaning, Interior Inspection, Repair, and Lining
Underground Storage Tanks; API Standard 1631 Interior Lining and Periodic Inspection
of Underground Storage Tanks.
Owners of UST systems should confirm with State, local or other implementing agency
on requirements for periodic lining inspections. NWTLI recommends an interior lining
inspection within five (5) years from the date of this report. If applicable, cathodic
protection system should be maintained by a state licensed Cathodic Protection
technician. UST system owners and operators must maintain records that demonstrate
compliance with the requirements set forth, and be made available for inspection, by the
implementing agency.
NWTLI appreciates the opportunity to help your company with meeting regulatory
compliance requirements.
Sincerely,
Brad C. Boston/NWTLI
ICC U1 Cert# 8294153
NWTLI
UST & AST Inspections
Complete Site Compliance Testing & Upgrades
Industrial Protective Linings & Coatings
Fuel Polishing & Treatment
4
(888) TLC-TANK
UST Recertification Form
Hanna Country Store 5 Nov 2024
Facility ID Completion Date
40928 W SR-35 Hanna UT 84031 Rodolfo Rodriguez
Site Address Coatings Expert
Johann Defa 801-205-7807 Brad Boston
Contact Name & Phone ICC Cert# 8294153
NONDESTRUCTIVE EXAMINATION RESULTS
6000-GALLON UST #1 Ø 8' x 16' TANK HEADS
Top R 3/4 RSL R 1/4 Bot L 1/4 LSL L 3/4 FILL LLM
3 0.243 0.242 0.238 0.242 0.239 0.240 0.242 0.239 0.240 0.243
6 0.239 0.243 0.240 0.244 0.241 0.243 0.243 0.244 0.245 0.245
9 0.242 0.241 0.241 0.239 0.240 0.242 0.240 0.242 0.244 0.246
12 0.240 0.237 0.239 0.244 0.239 0.241 0.241 0.241 0.243 0.244
15 0.239 0.239 0.240 0.238 0.241 0.242 0.246 0.247 0.247 0.243
0.242 AVERAGE UT 101% of UL 58 §3.6 Table 3.1
6,000 Gal Ø 8’ x 16’L Diesel
Nom. Tank Capacity Nom. Tank Dimensions Tank Contents
UST Lining Recertification
Acceptable 125 mil Pass
Shore D Hardness Dry Film Thickness Holiday Test
Meets NLPA Standard 631 & API 1631: [x] Pass [ ] Fail
Tank meets R311, UAC requirements: [x] Pass [ ] Fail
Signed: Date: 5 Nov 2024
Rodolfo Rodriguez/NCCER 6988764
NWTLI
UST & AST Inspections
Complete Site Compliance Testing & Upgrades
Industrial Protective Linings & Coatings
Fuel Polishing & Treatment
5
(888) TLC-TANK
UST Recertification Form
Hanna Country Store 5 Nov 2024
Facility ID Completion Date
40928 W SR-35 Hanna UT 84031 Rodolfo Rodriguez
Site Address Coatings Expert
Johann Defa 801-205-7807 Brad Boston
Contact Name & Phone ICC Cert# 8294153
NONDESTRUCTIVE EXAMINATION RESULTS
6000-GALLON UST #2 Ø 8' x 16' TANK HEADS
Top R 3/4 RSL R 1/4 Bot L 1/4 LSL L 3/4 FILL LLM
3 0.241 0.239 0.238 0.241 0.246 0.244 0.242 0.239 0.241 0.242
6 0.239 0.244 0.240 0.243 0.240 0.241 0.244 0.244 0.246 0.244
9 0.243 0.245 0.242 0.244 0.242 0.244 0.239 0.242 0.244 0.245
12 0.240 0.246 0.239 0.245 0.238 0.241 0.242 0.243 0.245 0.243
15 0.242 0.239 0.244 0.238 0.240 0.242 0.244 0.244 0.247 0.246
0.244 AVERAGE UT 101% of UL 58 §3.6 Table 3.1
6,000 Gal Ø 8’ x 16’L Regular
Nom. Tank Capacity Nom. Tank Dimensions Tank Contents
UST Lining Recertification
Acceptable 125 mil Pass
Shore D Hardness Dry Film Thickness Holiday Test
Meets NLPA Standard 631 & API 1631: [x] Pass [ ] Fail
Tank meets R311, UAC requirements: [x] Pass [ ] Fail
Signed: Date: 5 Nov 2024
Rodolfo Rodriguez/NCCER 6988764
NWTLI
UST & AST Inspections
Complete Site Compliance Testing & Upgrades
Industrial Protective Linings & Coatings
Fuel Polishing & Treatment
6
(888) TLC-TANK
PHOTO DOCUMENTATION
View of Hanna Country Store, Hanna UT
NWTLI
UST & AST Inspections
Complete Site Compliance Testing & Upgrades
Industrial Protective Linings & Coatings
Fuel Polishing & Treatment
7
(888) TLC-TANK
November 2024
View of 6,000-gallon Diesel Tank #1
NWTLI
UST & AST Inspections
Complete Site Compliance Testing & Upgrades
Industrial Protective Linings & Coatings
Fuel Polishing & Treatment
8
(888) TLC-TANK
November 2024
View of 6,000-gallon Diesel Tank #1
NWTLI
UST & AST Inspections
Complete Site Compliance Testing & Upgrades
Industrial Protective Linings & Coatings
Fuel Polishing & Treatment
9
(888) TLC-TANK
November 2024
View of 6,000-gallon Regular Tank #2
NWTLI
UST & AST Inspections
Complete Site Compliance Testing & Upgrades
Industrial Protective Linings & Coatings
Fuel Polishing & Treatment
10
(888) TLC-TANK
November 2024
View of 6,000-gallon Regular Tank #2
NWTLI
UST & AST Inspections
Complete Site Compliance Testing & Upgrades
Industrial Protective Linings & Coatings
Fuel Polishing & Treatment
11
(888) TLC-TANK
View of closed lid on Diesel #1
View of closed lid on Regular #2