HomeMy WebLinkAboutDDW-2024-01335220 NORTH MAIN, SUITE 107 • ST. GEORGE, UTAH 84770
TEL: 435.656.3299 • FAX: 435.656.2190
11-12-2024
J. Paul Wright, P.E.
DEQ Southwest Utah District Engineer
620 S 400 E #400
St. George, UT 84770
Subject: Quail to Cottam Pump Stations Project – Revisions per DEQ Review
Dear Paul:
Per our meeting held on October 31, 2024 to review the plans for the Quail to Cottam Pump Stations
Project, Bowen Collins has made the following revisions in response to comments received:
1. Comment: Tank drain line cannot discharge into the box as currently shown and needs to
drain to daylight.
a. Response: The drawings have been revised to route the tank drain line to daylight.
See the attached drawings C-02 and C-08.
2. Comment: Tank overflow can use #4 mesh rather than #14 mesh
a. Response: See revisions shown on drawing C-08.
3. Comment: Tank hatch needs 2” shoebox overhang, lockable hatch, at least 4” above tank roof,
and include a gasket.
a. Response: Note has been added to drawings to specify the requirement for a gasket
on the hatch. All other items were already included/addressed in drawings. See
attached drawings GS-04 and GS-06
4. Comment: Pump stations will require a compound gauge on the suction side of pumps that
can measure negative pressure.
a. Response: Note has been added to the drawings. See the attached drawings M-05, M-
06, M-011, and M-012.
Thank you for your time spent reviewing the plans. If you have any questions or if there are any
comments that were not adequately addressed, please let me know.
Sincerely,
Bowen Collins & Associates, Inc.
Aaron Anderson
Project Manager