HomeMy WebLinkAboutDERR-2024-012332
44 North 800 East St George, UT 84770 (435) 634-9557 Fax (435) 656-2124
LINE TEST DATA WORKSHEET
Customer: Date:
Address: Tester:
City/State/Zip: Cert #:
Tank 1 Tank 2 Tank 3 Tank 4
Contents
Pump Manufacturer
Isolation Mechanism
Test Pressure
Initial Cylinder Level
Final Cylinder Level
Leak Rate=(ICL-FCL)X2
Time Started
Time Ended
Total Test Time
Conclusion (Pass or Fail)
LINE LEAK DETECTOR TEST DATA
Tank 1 Tank 2 Tank 3 Tank 4
Serial Number
Resiliency
Opening Time
Test Leak Rate ML/MIN
Holding PSI
Metering PSI
Conclusion (Pass/Fail)
Remarks:___________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________