Loading...
HomeMy WebLinkAboutDERR-2024-012327 Environmental Project Report Date of Report: 09/23/2024 Dates of Removal: 09/10/2024-09/13-2024 Enviro Care Project Reference Number: 9753 Response Contact Information Enviro Care, Inc. Project Manager 505 North Main Street Name: Zach Ryan North Salt Lake, Utah 84054 Title: Project Manager Voice: (801) 299-1900 Cell: 720-726-0219 Facsimile: (801) 299-1473 Email: zach.ryan@envirocareusa.com www.envirocarehazmat.com Client Contact Information Client: Paxton Project LLC Client Representative: 2483 North Canyon Rd Bruce Bastian Provo, UT 84604 801-882-0588 801-971-7400 bruce@jbearlco.com Project Information Project Location Project Type : 225 Paxton Avenue Disposal & Removal Salt Lake City, UT 84101 Environmental Project Report 2 Daily Activities Report: Date: 09/10/24 Military Time Activities 0800 The crew arrived on-site. 0805 Began JSA as well as taking photos. 0830 Began offloading Equipment 0900 Began moving motors 0930 Lined roll-off box and began loading box with motors and other car parts. 1030 The crew finished loading the roll-off bin and deployed the floor dry to mitigate the leak that happened while loading the roll-off bin. 1100 Began separating waste to be lab-packed. 1200 Finished separating waste from the garage and began packing waste into containers. 1300 Finished packing waste, moved to second building 1305 Began separating waste in the second building. 1400 Finished separating waste in the second building and moved to the final structure. 1435 Gathered the last of the waste for the lab pack from the final structure and packed into containers. 1450 Began working on removing FLO tubes and ballasts from overhead lights. 1530 Packed FLO tubes and ballasts into proper containers. 1535 Loaded all waste from the day into truck 336, and took pictures for the customer of all the drums that were packed. SEE PHOTOS BELOW. 1630 The finished job and double-checked all labeling and waste before completing paperwork. 1700 Left the site, locked the gate behind us. 1722 Arrived back at Enviro Care. Date: 9/11/24 Military Time Activities 0620 Driver pre-trips his truck and paperwork and leaves for the customer site. 0645 Drives to the customer site. 0705 Driver tarps and loads roll-off bin onto the truck. 0720 The driver drives back to Enviro Care. 0740 Paperwork is submitted and roll-off bin is offloaded. Environmental Project Report 3 Date: 9/13/2024 Military Time Activities 1200 Sent a crew out to pick up the last of the light tubes. 1400 Crew returned to Enviro Care. Project Summary Our team completed a comprehensive waste management and removal project at the site. The work was divided into two primary teams, each focusing on specific tasks to ensure efficient and safe operations. The first team was responsible for the removal of engine blocks and transmissions from the site. This included handling any fluids, such as used oil, that were present in the tractors and other equipment. The team ensured that all components and fluids were managed appropriately according to safety standards. The engine blocks, transmissions, and any other materials removed were placed in designated bins for proper disposal. The second team focused on managing packaged waste present at the site. This team collected all packaged waste materials, consolidated them, and transferred them into drums designed for safe transport. They ensured that all waste materials were securely packed and ready for removal from the site. This process included labeling and documenting each drum to ensure accurate tracking and compliance with disposal regulations. END OF ON-SITE ACTIVITIES Environmental Project Report 4 Waste Disposal Status Status as of 9/24/24 024558959 JJK HAZ Fire Extinguishers Picked Up: 9/10/24 Disposed Of :9/12/24 024558957 JJK HAZ Drums etc… Picked Up: 9/10/24 Disposed Of:9/12/24 9753-1 Drums etc… Picked Up: 9/10/24 Disposed Of:9/12/24 9753UW-01 Universal Waste- Light Tubes & Ballasts Picked Up:9/10/24 & 9/13/24 Not disposed of yet. Will be put on the next Universal Waste load 9753UW-02 Construction Debris- Engines etc.. Picked Up: 9/10/24 Disposed Of:9/12/24 PHOTOGRAPHS Photo: 1 Description: Drum (DM 55gal) Environmental Project Report 5 Photo: 2 Description: Drum (DM 55gal) Photo: 3 Description: Drum (DM 55gal) Environmental Project Report 6 Photo: 4 Description: RCRA Empty Tote Photo: 5 Description: Drum (DF 55gal) Environmental Project Report 7 Photo: 6 Description: Drum (DM 55gal) RCRA Empty Photo: 7 Description: Drum (DM 55gal) RCRA Empty Environmental Project Report 8 Photo: 8 Description: Drum Drum (DM 55gal) RCRA Empty Photo: 9 Description: Drum (DM 55gal) RCRA Empty Environmental Project Report 9 Photo: 10 Description: Drum (DF 55gal) Photo: 11 Description: Drum (DF 30gal) RCRA empty Environmental Project Report 10 Photo: 12 Description: Drum (DF 5 gal) Photo: 13 Description: Drum (DF 5 gal) Environmental Project Report 11 Photo: 14 Description: Light Tubes Photo: 15 Description: Drum (DM 30 gal) Environmental Project Report 12 Site Closure Zach Ryan, Enviro Care Project Manager, approved all cleanup activities, and no further action at the site is required. END OF REPORT Enviro Care is pleased to have been of service to Paxton Project LLC. Should you have any questions or require additional information please feel free to contact Zach Ryan at (720) 726- 0219. In addition, you may contact me via email at zach.ryan@envirocareusa.com Respectfully submitted, Zach Ryan Zach Ryan Project Manager Enviro Care, Inc.