Loading...
HomeMy WebLinkAboutDAQ-2024-011554,.tttFfinctorr February 8,2023 Mr. Bryce Bird, Director Division of Air Quality Utah Department of Environmental Quality 195 North 1950 West Salt Lake City, Utah 84116 RE: ScheduledTurnarounds Dear Mr. Bird: UTAH DEPARTMENT OF ENVIRONMENTAL QUALITY FEB 1 4 2023 DIVISION OF AIR QUALITY Certified Mail: 7019 1120 0000 0070 7821 Pursuant to Utah Administrative Code R307-326-6, HF Sinclair Woods Cross Refining LLC is required to develop and submit for approval a procedure for minimizing VOC emissions during turnarounds. For your information, the Reformer Unit (Unit 6), the Crude Unit (Unit 8), the Solvent Deasphalting Unit (Unit 10), the Naphtha Hydrodesulphurization Unit (Unit l2), the Isomerization Unit (Unit l3), the Gas Oil Hydrocracking Unit (Unit 20), and the NaHS Sour Gas Treatment Unit (Unit 2l) are scheduled for turnaround in March 2023. Additionally, the Distillate Hydro-Treater (Unit l9) and the Sulfur Block (Units 16, 17 , 1 8, and 22) are scheduled for turnaround in August 2023. The units will be shutdown according to HF Sinclair's Standard Operating Procedures. The vessels will be de-pressurized and purged to the flare and will not be opened and purged to atmosphere until the vessel pressure is below 5 psig and below |I%LEL as prescribed by 40 CFR 63.643(c). Please contact me with any questions or comments. I can be reached at (801) 299-6625 or by email at ft ravis. smith@hfsinclair. com. Environmental Specialist cc: E. Benson (r)File 2.2.9 S. Williams S. Cooper HF Sinclair Woods Cross Refining LLC 1070 W. 500 S, West Bountiful, UT 84087 801 -299-6600 | HFSinclair.com Sincerely, REVIEWEDInitials:Date: Nov 14, 2024Compliance Status: OKFile #: 10123 (B2)Comment: FFY 2023