HomeMy WebLinkAboutDAQ-2024-011554,.tttFfinctorr
February 8,2023
Mr. Bryce Bird, Director
Division of Air Quality
Utah Department of Environmental Quality
195 North 1950 West
Salt Lake City, Utah 84116
RE: ScheduledTurnarounds
Dear Mr. Bird:
UTAH DEPARTMENT OF
ENVIRONMENTAL QUALITY
FEB 1 4 2023
DIVISION OF AIR QUALITY
Certified Mail: 7019 1120 0000 0070 7821
Pursuant to Utah Administrative Code R307-326-6, HF Sinclair Woods Cross Refining LLC is required
to develop and submit for approval a procedure for minimizing VOC emissions during turnarounds.
For your information, the Reformer Unit (Unit 6), the Crude Unit (Unit 8), the Solvent Deasphalting Unit
(Unit 10), the Naphtha Hydrodesulphurization Unit (Unit l2), the Isomerization Unit (Unit l3), the Gas
Oil Hydrocracking Unit (Unit 20), and the NaHS Sour Gas Treatment Unit (Unit 2l) are scheduled for
turnaround in March 2023. Additionally, the Distillate Hydro-Treater (Unit l9) and the Sulfur Block
(Units 16, 17 , 1 8, and 22) are scheduled for turnaround in August 2023. The units will be shutdown
according to HF Sinclair's Standard Operating Procedures. The vessels will be de-pressurized and purged
to the flare and will not be opened and purged to atmosphere until the vessel pressure is below 5 psig and
below |I%LEL as prescribed by 40 CFR 63.643(c).
Please contact me with any questions or comments. I can be reached at (801) 299-6625 or by email at
ft ravis. smith@hfsinclair. com.
Environmental Specialist
cc: E. Benson (r)File 2.2.9
S. Williams
S. Cooper
HF Sinclair Woods Cross Refining LLC
1070 W. 500 S, West Bountiful, UT 84087
801 -299-6600 | HFSinclair.com
Sincerely,
REVIEWEDInitials:Date: Nov 14, 2024Compliance Status: OKFile #: 10123 (B2)Comment: FFY 2023