Loading...
HomeMy WebLinkAboutDERR-2024-012118 WESTECH EQUIPMENT 195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307 801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054 UST OVERFILL EQUIPMENT INSPECTION AUTOMATIC SHUTOFF DEVICE AND BALL FLOAT VALVE Facility Name: Smith’s 30 Owner: Smith’s Food and Drug Centers, Inc. Address: 4275 South Harrison Boulevard Address: P.O. Box 305103 City, State, Zip: Ogden, Utah 84401 City, State, Zip: Nashville, Tennessee 37230 Facility I.D.#: 1200584 Phone #: 801-977-2012 Testing Company: Westech Phone #: 801-266-2545 Date: 9/24/24 This data sheet is for inspecting automatic shutoff devices and ball float valve. See PEI/RP1200 Section 7 for inspection procedures. Product Grade PUL Tank Number 2 Tank Volume, gallons 7,796 Tank Diameter, inches 91.63 Overfill Prevention Device Brand OPW Type ☒ Automatic Shutoff Device ☐ Ball Float Valve ☐ Automatic Shutoff Device ☐ Ball Float Valve ☐ Automatic Shutoff Device ☐ Ball Float Valve ☐ Automatic Shutoff Device ☐ Ball Float Valve AUTOMATIC SHUTOFF DEVICE INSPECTION 1. Drop tube removed from tank? ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 2. Drop tube and float mechanisms free of debris? ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 3. Float moves freely without binding and poppet moves into flow path? ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 4. Bypass valve in the drop tube open and free of blockage (if present)? ☒Yes ☐No ☐Not Present ☐Yes ☐No ☐Not Present ☐Yes ☐No ☐Not Present ☐Yes ☐No ☐Not Present 5. Flapper adjusted to shut off flow at 95% capacity? * ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No A "No" to any item in Lines 1-5 indicates a test failure. BALL FLOAT VALVE INSPECTION** 1. Tank top fitting vapor-tight and leak free? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 2. Ball float cage free of debris? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 3. Ball free of holes and cracks and moves freely in cage? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 4. Vent hole in pipe open and near top of tank? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 5. Ball float pipe proper length to restrict flow to 90% capacity? *** ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No A "No" to any item in Lines 1-5 indicates a test failure. Test Results ☒Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail Comments: *Use manufacturer’s suggested procedure for determining if automatic shutoff device will shut off flow at 95% capacity. **If a ball float valve is found to fail the inspection, another method of overfill must be used. ***Use manufacturer’s suggested procedure for determining if flow restriction device will restrict flow at 90% capacity. Tester’s Name Taber DeHart, UT-0394 Tester’s Signature WESTECH EQUIPMENT 195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307 801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054 CONTAINMENT SUMP INTEGRITY TESTING HYDROSTATIC TESTING METHOD Facility Name: Smith’s 30 Owner: Smith’s Food and Drug Centers, Inc. Address: 4275 South Harrison Boulevard Address: P.O. Box 305103 City, State, Zip: Ogden, Utah 84401 City, State, Zip: Nashville, Tennessee 37230 Facility I.D.#: 1200584 Phone #: 801-977-2012 Testing Company: Westech Phone #: 801-266-2545 Date: 9/24/24 This procedure is to test the leak integrity of containment sumps. See PEI/RP1200 Section 6.5 for the inspection procedure. Containment Sump ID PUL STP Containment Sump Material FRP Liquid and debris removed from sump?* ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No Visual Inspection (No cracks, loose parts or separation of the containment sump.) ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No Containment Sump Depth 42” Height From Bottom to Top of Highest Penetration 8” Starting Water Level 14 3/16” Test Start Time 10:27 Ending Water Level 14 3/16” Test End Time 11:27 Test Period (Minimum test time: 1 hour) 1 hour Water Level change 0 Pass/fail Criteria: Must pass visual inspection. Water level drop of less than 1/8 inch. Test Results ☒Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail Comments: *All Liquids and debris must be disposed of properly. Tester’s Name Taber DeHart, UT-0394 Tester’s Signature