Loading...
HomeMy WebLinkAboutDERR-2024-012106 WESTECH EQUIPMENT 195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307 801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054 MECHANICAL AND ELECTRONIC LINE LEAK DETECTOR PERFORMANCE TESTS Facility Name: Mt. Ogden Division Owner: Utah Transit Authority Address: 135 West 17th Street Address: 200 South 669 West City, State, Zip: Ogden, Utah 84401 City, State, Zip: Salt Lake City, Utah 84101 Facility I.D.#: 1200265 Phone #: 801-558-5231 Testing Company: Westech Phone #: 801-266-2545 Date: 9/23/24 This data sheet can be used to test the mechanical line leak detector (MLLD) and electronic line leak detector (ELLD) with submersible turbine pump (STP) systems. See PEI/RP 1200 Sections 9.1 and 9.2 for test procedures. Line Number 1 North DSL 2 South DSL 3 RUL Product Stored DSL DSL RUL Leak Detector Manufacturer Incon Incon Incon Leak Detector Model LSU500 LSU500 LSU500 Type Of leak Detector ☐MLLD ☒ELLD ☐MLLD ☒ELLD ☐MLLD ☒ELLD ☐MLLD ☐ELLD MLLD (ALL PRESSURE MEASURMENTS ARE MADE IN PSIG) STP full operating pressure Check valve holding pressure Line resiliency (ml) (line bleedback volume as measured from check valve holding pressure to 0 psig) Step through time in seconds (time the MLLD hesitates at metering pressure before going to full operating pressure as measured from 0 sig with no leak induced on the line) Metering pressure (STP pressure when simulated leak rate 3 gph at 10 psig) Opening time in seconds (the time the MLLD opens to allow full pressure after simulated leak is stopped) Does the STP pressure remain at or below the metering pressure for at least 60 seconds when the simulated leak is induced? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No Does the leak detector reset (trip) when the line pressure is bled off to zero psig? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No Does STP properly clycle on/off under normal fuel system operating conditions? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No A "No" answer to any of the above questions indicates that the MLLD fails the test. ELLD (ALL PRESSURE MEASURMENTS ARE MADE IN PSIG) STP full operating pressure 36 42 25 How many test cycles are observed before alarm/shutdown occurs? 1 1 1 Does the simulated leak cause on alarm? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No A "No" answer to the above question indicates that the ELLD fails the test. Does the simulated leak cause an STP shutdown? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☒Pass ☐Fail ☐Pass ☐Fail Comments: Tester’s Name Taber DeHart, UT-0394 Tester’s Signature WESTECH EQUIPMENT 195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307 801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054 AUTOMATIC TANK GAUGE OPERATION INSPECTION Facility Name: Mt. Ogden Division Owner: Utah Transit Authority Address: 135 West 17th Street Address: 200 South 669 West City, State, Zip: Ogden, Utah 84401 City, State, Zip: Salt Lake City, Utah 84101 Facility I.D.#: 1200265 Phone #: 801-558-5231 Testing Company: Westech Phone #: 801-266-2545 Date: 9/23/24 This procedure is to determine whether the automatic tank gauge (ATG) is operating properly. See PEI/RP1200 Section 8.2 for the inspection procedure. This procedure is applicable to tank monitor stems the touch the bottom of the tank when in place. Tank Number 1 North DSL 2 South DSL 3 RUL Product Stored DSL DSL RUL ATG Brand and Model Incon Incon Incon 1. Tank Volume, gallons 20,029 20,029 6,085 2. Tank Diameter, inches 119 119 92 3. After removing the ATG from the tank, it has been inspected and any damaged or missing parts replaced? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No 4. Float moves freely on the stem without binding? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No 5. Fuel float level agree with the value programmed into the console? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No 6. Water float level agree with the value programmed into the console? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No 7. Inch level from the bottom of the stem when 90% alarm is triggered? 99 1/2 99 1/2 74 3/8 8. Inch level at which the overfill alarm activates corresponds with the value programmed in the gauge? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No 9. Inch level from the bottom when the water float first triggers an alarm? 2 2 2 10. Inch level at which the water float alarm activates corresponds with the value programmed in the gauge? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No If any answers in Lines 3, 4, 5, or 6 are "No" the system has failed the test. Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☒Pass ☐Fail ☐Pass ☐Fail Comments: Tester’s Name Taber DeHart, UT-0394 Tester’s Signature WESTECH EQUIPMENT 195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307 801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054 LIQUID SENSER FUNCTIONALITY TESTING Facility Name: Mt. Ogden Division Owner: Utah Transit Authority Address: 135 West 17th Street Address: 200 South 669 West City, State, Zip: Ogden, Utah 84401 City, State, Zip: Salt Lake City, Utah 84101 Facility I.D.#: 1200265 Phone #: 801-558-5231 Testing Company: Westech Phone #: 801-266-2545 Date: 9/23/24 This procedure is to determine whether liquid sensors, located in the interstitial spaces of the UST systems, are able to det ect the presence of water and fuel. See PEI/RP1200, Section 8.3 for the test procedure. Sensor Location North DSL STP South DSL STP RUL STP Product Stored DSL DSL RUL Type of Sensor ☐ Discriminating ☒ Non-Discrimi- nating ☐ Discriminating ☒ Non-Discrimi- nating ☐ Discriminating ☒ Non-Discrimi- nating ☐ Discriminating ☐ Non-Discrimi- nating ☐ Discriminating ☐ Non-Discrimi- nating ☐ Discriminating ☐ Non-Discrimi- nating ☐ Discriminating ☐ Non-Discrimi- nating Test Liquid ☒ Water ☐ Product ☒ Water ☐ Product ☒ Water ☐ Product ☐ Water ☐ Product ☐ Water ☐ Product ☐ Water ☐ Product ☐ Water ☐ Product Is the ATG Console clear of any active or recurring warnings or alarms regarding the leak sensor? If the sensor is in alarm and functioning, indicate why. ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No Is sensor alarm circuit operational? ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No Has sensor been inspected and in good operating condition? ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No When placed in test liquid, does the sensor trigger an alarm? ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No When alarm is trigger, is the sensor identified on the ATG console? ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No Any “No” answers indicate the sensor fails the test. Test Results: ☒ Pass ☐ Fail ☒ Pass ☐ Fail ☒ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Comments: Tester’s Name: Taber DeHart, UT-0394 Tester’s Signature WESTECH EQUIPMENT 195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307 801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054 OVERFILL ALARM OPERATION INSPECTION Facility Name: Mt. Ogden Division Owner: Utah Transit Authority Address: 135 West 17th Street Address: 200 South 669 West City, State, Zip: Ogden, Utah 84401 City, State, Zip: Salt Lake City, Utah 84101 Facility I.D.#: 1200265 Phone #: 801-558-5231 Testing Company: Westech Phone #: 801-266-2545 Date: 9/23/24 This procedure is to determine whether the automatic tank gauge (ATG) is operating properly. See PEI/RP1200 Section 8.2 for the inspection procedure. This procedure is applicable to tank monitor stems the touch the bottom of the tank when in place. Tank Number 1 North DSL 2 South DSL 3 RUL Product Stored DSL DSL RUL ATG Brand and Model Incon Incon Incon 1. Tank Volume, gallons 20,029 20,029 6,085 2. Tank Diameter, inches 119 119 92 3. Overfill alarm activates in the test mode at the console? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No 4. When activated, overfill alarm can be heard or seen while delivering to the tank? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No 5. After removing the probe from the tank, it has been inspected and any damaged or missing parts replaced? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No 6. Float moves freely on stem without binding? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No 7. Moving product level float up the stem trigger alarm? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No 8. Inch level from bottom of stem when 90% alarm is triggered? 99 1/2 99 1/2 74 3/8 9. Tank volume at inch level in Line 8. 18,026 18,026 5,476 10. Calculate (Line 9 / Line 1) X 100 90% 90% 90% 11. Is line 10 less than 90%? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No 12. Fuel float level on the console agrees with the gauge stick reading? ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No 13. Overfill alarm activates at any product level above 90% tank capacity? ☐Yes ☒No ☐Yes ☒No ☐Yes ☒No ☐Yes ☐No If any answers in Lines 3, 4, 5, 6, 7, or 11 are "No," or Line 13 is “Yes,” the system has failed the test. Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☒Pass ☐Fail ☐Pass ☐Fail Comments: Tester’s Name Taber DeHart, UT-0394 Tester’s Signature WESTECH EQUIPMENT 195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307 801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054 SPILL BUCKET INTEGRITY TESTING HYDROSTATIC TEST METHOD SINGLE- AND DOUBLE-WALLED VACUUM TEST METHOD Facility Name: Mt. Ogden Division Owner: Utah Transit Authority Address: 135 West 17th Street Address: 200 South 669 West City, State, Zip: Ogden, Utah 84401 City, State, Zip: Salt Lake City, Utah 84101 Facility I.D.#: 1200265 Phone #: 801-558-5231 Testing Company: Westech Phone #: 801-266-2545 Date: 9/23/24 This procedure is to test the leak integrity of single- and double-walled spill buckets. See PEI/RP1200 Section 6.2 for hydrostatic test method, Section 6.3 for single-walled vacuum test method and Section 6.4 for double-walled vacuum test method. Tank Number 1 North DSL 2 South DSL 3 RUL Product Stored DSL DSL RUL Spill Bucket Capacity 5-Gallon 5-Gallon 5-Gallon Manufacturer OPW OPW OPW Construction ☐Double-walled ☒Single-walled ☐Double-walled ☒Single-walled ☐Double-walled ☒Single-walled ☐Double-walled ☐Single-walled Test Type ☒Hydrostatic ☐Vacuum ☐Double-walled ☐Single-walled ☒Hydrostatic ☐Vacuum ☐Double-walled ☐Single-walled ☒Hydrostatic ☐Vacuum ☐Double-walled ☐Single-walled ☐Hydrostatic ☐Vacuum ☐Double-walled ☐Single-walled Spill Bucket Type ☒Product ☐Vapor ☒Product ☐Vapor ☒Product ☐Vapor ☐Product ☐Vapor Liquid and debris remove from spill bucket?* ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No Visual Inspection (no cracks, loose parts or separation of the bucket from the fill pipe.) ☒Yes ☐No ☒Yes ☐No ☒Yes ☐No ☐Yes ☐No Tank Riser cap included in test? ☒Yes ☐No ☐NA ☒Yes ☐No ☐NA ☒Yes ☐No ☐NA ☐Yes ☐No ☐NA Drain valve included in test? ☐Yes ☐No ☒NA ☐Yes ☐No ☒NA ☐Yes ☐No ☒NA ☐Yes ☐No ☐NA Starting Level 10 3/8” 10” 9” Test Start Time 10:35 10:35 10:35 Ending Level 10 3/8” 10” 9” Test End Time 11:35 11:35 11:35 Test Period 1 Hour 1 Hour 1 Hour Level Change 0 0 0 Pass/fail criteria: Must pass visual inspection. Hydrostatic: Water level drop of less than 1/8 inch; Vacuum single-walled only: Maintain at least 26 inches water column; Vacuum double-walled: maintain at least 12 inches water column. Test Results ☒Pass ☐Fail ☒Pass ☐Fail ☒Pass ☐Fail ☐Pass ☐Fail Comments: *All liquids and debris must be disposed of properly Tester’s Name Taber DeHart, UT-0394 Tester’s Signature