Loading...
HomeMy WebLinkAboutDSHW-2024-006379THATCHER COMPANY P. 0. Box 27407, Salt Lake City, UT 84127-0407 May 15, 2024 Phone(801)972-4587 Fax (801) 972-4606 Utah DEQ Division of Waste Management and Radiation Control P.O. Box 144840 Salt Lake City, UT 84114-4880 Reference: Thatcher Phase 3 Materials Management Monthly Letter Report for May 2024 Dear Utah Division of Waste Management and Radiation Control: i CH EM Thatcher Company has prepared this April 2024 Monthly Letter Report as required under the Stipulation and Consent Order dated December 9, 2021, with Utah Department of Environmental Quality Division of Waste Management and Radiation Control (DWMRC) and the approved Phase 3 Material Management Plan (P3MMP). SUMMARY All Areas and Trailers will remain "in process" to allow for the potential to manage containers through 2024. Therefore, the container numbers are estimated and will be finalized when the project is completed. Thatcher Company will prioritize management of unknowns (i.e., aggressive ly manage). Historical files will be updated and maintained for areas that are mostly completed (i.e., uploaded to SharePoint). Two columns have been added to the Phase 3 Area and Containers Summary Table listing: 1) Container Material Management Determination -Not Found, No Data, and/or Used (Subtracted from Total); and 2) Non-Hazardous Containers (Subtracted from Total). The container numbers in these two columns will be subtracted from the container count in order calculate the number of Phase 3 containers to be managed. An updated summary of the number of containers managed and remaining in each area and trailer as compared to the Baseline count of containers is detailed in the table below. 1 Phase 3 Area and Containers Summary Table April 15th Container March Report No. Material May 15th No. of Line 15th of Management Report No. of Items Report Remaining Determination -Remaining Line and/or No. Line Line Items Not Found, No Non-Items and/or Containers Items and/or Data, and/or Hazardous Containers "In- (From and/or Containers Used Containers process"/ Baseline Containers "In-(Subtracted (Subtracted (Potential Area/Trailer Inventory) 1 Remaining process" from Total) from Total) Additions) Comments Area 1 3 3 3 0 0 3 Not Started. Area 2 12 12 12 0 0 12 Not Started. Area 3 5 5 5 0 0 5 Not Started. There were not any containers Area 4 0 0 0 0 0 0 identified on the Baseline Inventory. Active in process. May 1. Containers not found and/or no data: 22 2. Container A-05-116 is empty and is subtracted from total. 3. Shipped 27 containers. Area 5 130 98 57 22 0 7 Total: 50 1 The Baseline Inventory includes the following spreadsheets. 1. Spreadsheets containing line items with container counts : 1) Disposition Spreadsheets for Area 1 O; and, 2) Trailer spreadsheets . 2. Spreadsheets with line items: Areas 1-14. Line items may contain single or multip le containers. 2 April 15th Container March Report No. Material May 15th No. of Line 15th of Management Report No. of Items Report Remaining Determination -Remaining Line and/or No. Line Line Items Not Found, No Non-Items and/or Containers Items and/or Data, and/or Hazardous Containers "In- (From and/or Containers Used Containers process" I Baseline Containers "In-(Subtracted (Subtracted (Potential Area/Trailer Inventory) 1 Remaining process" from Total) from Total) Additions) Comments Ac t iv e In-Progress (1-c o ntainer per line item). May 1. Shipp ed 16 co nta i ners . 2. Non-hazardous containers: 5 Area 6 94 94 94 0 5 73 Total: 21 There w e re not any containers Area 7 0 0 0 0 0 0 identifi ed on the Baseline Inventory. Active in process. May 1. Shipped 3 conta i ners. 2. Used containers: 1 3. Containers not found and/or no data (these were already subtracted from total): 5 Area 8 21 9 28 10 1 0 6 Tota l: 4 Area 9 3 3 3 0 0 3 Not Started . 3 April 15th Container March Report No. Material May 15th No. of Line 15th of Management Report No. of Items Report Remaining Determination -Remaining Line and/or No. Line line Items Not Found, No Non-Items and/or Containers Items and/or Data, and/or Hazardous Containers "In- (From and/or Containers Used Containers process"/ Baseline Containers "In-(Subtracted (Subtracted (Potential Area/Trailer Inventory) 1 Remaining process" from Total) from Total) Additions) Comments Area 10 (Disposition Area 10 (240) and Area 10 List) 771 30 30 23 7 0 Disposi tion (531) Area 11 24 24 24 0 0 24 Not Started . Active In-Progress (1 -container per line item except for 208 and 209 that have 2 containers each, which, would bring the total to 210). May 1. Shipped 58 containers. 2. Non-hazardous containers : 54 3. Containers not found and/or no data (these were already subtracted from total): 5 Total excluding the additional 2 Area 12 208 208 208 0 54 96 containers: 112 4 April 15th Container March Report No. Material May 15th No. of Line 15th of Management Report No. of Items Report Remaining Determination -Remaining Line and/or No. Line Line Items Not Found, No Non-Items and/or Containers Items and/or Data, and/or Hazardous Containers "In- (From and/or Containers Used Containers process"/ Baseline Containers "In-(Subtracted (Subtracted (Potential Area/Trailer Inventory) 1 Remaining process" from Total) from Total) Additions) Comments Active In -Progress (1-container per line item}. May 1. Empties subtracted: 2 2. Non-hazardous containers: 2 Area 13 62 62 62 0 2 58 Total: 4 Area 14 3 3 3 0 0 3 Not Started. Trailer 53323 108 0 0 0 0 0 Trailer completed. Trailer 532173 147 0 0 0 0 0 Trailer completed. Trailer 5316 174 0 0 0 0 0 Trailer completed. Trailer 534325 156 0 0 0 0 0 Trailer completed. Trailer 53138 47 0 0 0 0 0 Trailer completed. Trailer 530417 211 0 0 0 0 0 Trailer completed. Trailer 53113 219 0 0 0 0 0 Trailer completed . 5 April 15th Container March Report No. Material May 15th No. of Line 15th of Management Report No. of Items Report Remaining Determination -Remaining Line and/or No. Line Line Items Not Found, No Non-Items and/or Containers Items and/or Data, and/or Hazardous Containers "In- (From and/or Containers Used Containers process"/ Baseline Containers "In-(Subtracted (Subtracted (Potential Area/Trailer Inventory) 1 Remaining process" from Total) from Total) Additions) Comments Trailer Not Started. 53155 (Baseline The June 6, 2022 Baseline Inventory 53165) 115 115 115 0 0 115 listed thi s as 53165. It is 53155. Totals 2711 685 626 46 68 405 Total with Potential May Additions 407 Area 12: 2 6 Containers Not on the Baseline Inventory Due to a transcription error , trailer 5323 was not included in the Baseline Inventory. Following submittal of the Baseline Inventory, Thatcher Company informed the Project Team of the error caused by the transcription error for trailer 53323 with trailer 5323 (i.e ., similar numbers). Containers Not on the Baseline Inventory Table No. of Containers No. of (From Remaining Baseline Containers "In- Area/Trailer Inventory) process" Traile r 5323 98 0 AlO 145 Containers Jan. 2023 Monthly Report 0 0 Totals 98 0 CONTAINER SHIPMENTS Container shipments included the following. Phase 3 Container Shipment Summary Table2 Shipment Date Container Shipment 58: April 18 , 2024 Container Shipment 59: April 26 , 2024 Comments This trailer was not accounted for as previously indicated in the Monthly Reports. This Trailer has been completed. Upon further review they were accounted for already and are not an addition. Shipping Paper NH2835-01 017418169FLE 017418160FLE 017418172FLE 017418173FLE 2 Previous weekly container shipment updates will be maintained in the historical files on the DWMRC SharePoint site. 7 Shipment Date Shipping Paper NH3718-01 Container Shipment 60: May 2 , 2024 NH3718-02 017418175FLE 017418176FLE NH6856-01 Container Shipment 61: May 10, 2024 NH6856-02 017418180FLE 017418181FLE MANAGEMENT OF CONTAINERS NOT IN GOOD CONDITION Conta iners described as not in viable condition were not identified during weekly inspections. INSPECTION RESULTS There were no reportable observations during weekly inspections . NOT ABLE ITEMS DWMRC Notified of Materials Container Detection of Bis(2-chloroetheyl) sulfide (sulfur mustard) There have not been any additional container sample analyses with detections of sulfur mustard (i.e., reported as zero (0) by Chemtech-Ford). 8 Thatcher Company sincerely appreciates this opportunity to provide the P3MMP Monthly Report. Please contact Darren Bauer directly with questions, concerns, or further comment on the P3MMP Monthly Report. Certification , "I certify under penalty of law that this document and any and all attachments were prepared under my direction or supervision according to a system designed to assure that qualified personnel properly gather and evaluate the information submitted . Based on my inquiry of the person or persons who manage the system , or those persons directly responsible for gathering the information , the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility affine and imprisonment for knowing violations." Sincerely , ike Mitchell, President Thatcher Company , Inc. 1900 Fortune Road Salt Lake City , UT 84104 9