HomeMy WebLinkAboutDERR-2024-011957Line Test
Facility Information
Name:Fast Stop 1129 Certification/Inspection #:54909
Address:604 W Logan Rd State ID:
Phone Number:Form Completed By:Ray Simms Date:09/05/2024
Tank Test Information
Tank #:T1 RUL T2 ETH FREE T3 PUL T4 DSL
Capacity:12145.5 12145.5 12145.5 12145.5
Product:Unleaded Ethanol Free
Unleaded
Premium Diesel
Line Test Information
Line #:DSL
LineType:Pressure
Line Material:SW Flex
Line ID Size (in):2
Line Length (ft):300
Pump Type:Red Jacket
Associated Tank:T4 DSL
Test Equip. Mfg.:Triangle
Test Pressure (PSI):55
Initial Cyl. Level:310
Final Cyl. Level:280
Change in Time (mins):15
Change in Vol:-30.0000
Change in Temp (F):0
Coeff. Of Thermal Expansion (g/F):0.00045
Line Vol (gal):48.94
Leak Rate (GPH):-0.0317
Result:Pass
Notes
TIGHTNESS TESTING CERTIFICATION
CGRS certifies that the systems in the above table have been tested utilizing leak detection methods which meet the prescribed leak rate testing
standard of 0.10 gph with a minimum probability of detection of 95% and a 5% probability of a false alarm. CGRS further certifies that the protocol for
each test method was strictly adhered to, and that all precision tightness testing performed by CGRS was conducted in accordance with EPA 40 CFR
parts 280.43(c) and 280.44(b) and the National Fire Protection Association, Bulletin NFPA 329 criteria.
Contractor Printed Name:Ray Simms Contractor Signature:
Certification Number:1651,UT 407