Loading...
HomeMy WebLinkAboutDERR-2024-011957Line Test Facility Information Name:Fast Stop 1129 Certification/Inspection #:54909 Address:604 W Logan Rd State ID: Phone Number:Form Completed By:Ray Simms Date:09/05/2024 Tank Test Information Tank #:T1 RUL T2 ETH FREE T3 PUL T4 DSL Capacity:12145.5 12145.5 12145.5 12145.5 Product:Unleaded Ethanol Free Unleaded Premium Diesel Line Test Information Line #:DSL LineType:Pressure Line Material:SW Flex Line ID Size (in):2 Line Length (ft):300 Pump Type:Red Jacket Associated Tank:T4 DSL Test Equip. Mfg.:Triangle Test Pressure (PSI):55 Initial Cyl. Level:310 Final Cyl. Level:280 Change in Time (mins):15 Change in Vol:-30.0000 Change in Temp (F):0 Coeff. Of Thermal Expansion (g/F):0.00045 Line Vol (gal):48.94 Leak Rate (GPH):-0.0317 Result:Pass Notes TIGHTNESS TESTING CERTIFICATION CGRS certifies that the systems in the above table have been tested utilizing leak detection methods which meet the prescribed leak rate testing standard of 0.10 gph with a minimum probability of detection of 95% and a 5% probability of a false alarm. CGRS further certifies that the protocol for each test method was strictly adhered to, and that all precision tightness testing performed by CGRS was conducted in accordance with EPA 40 CFR parts 280.43(c) and 280.44(b) and the National Fire Protection Association, Bulletin NFPA 329 criteria. Contractor Printed Name:Ray Simms Contractor Signature: Certification Number:1651,UT 407