Loading...
HomeMy WebLinkAboutDERR-2024-011949AST Monthly Compliance Inspection Facility Information Name:Fast Stop 1129 Certification/Inspection #:53930 Address:604 W Logan Rd, Garden City, UT, 84028 State ID: Phone Number:Form Completed By:Ray Simms Date:08/12/2024 # of Tanks Inspected:4 Tank IDs:T3 PUL , T2 ETH FREE, T4 DSL, T1 RUL Primary Tank and Piping Inspection Item T4 DSL T4 DSL T2 ETH FREE T2 ETH FREE T3 PUL T3 PUL T1 RUL T1 RUL ●1 Is tank exterior (roof, shell, ends, connections, fittings, valves, etc.) free of visible leaks? Note: If "No", identify tank and describe leak. Y Y Y Y ●2 Is aboveground piping (valves, fittings, connections, pumps, etc.) free of visible leaks?Note: If "No", identify location and describe leak. N Y Y Y ®3 Are ladders/platforms/walkways secure with no sign of severe corrosion or damage?Y Y Y Y ®4 Are all tank openings properly sealed (capped, plugged, covered, blind flanged, etc.)?Y Y Y Y ®5 Is the tank liquid level gauge readable and in good working condition?Y Y Y Y ®6 Is overfill prevention equipment in good working condition (overfill valve, audible alarm, etc.)? Note: Verify operation of audible alarms. Y Y Y Y ®7 Is the spill container (spill bucket) empty, free of visible leaks and in good working condition?NA NA NA NA ●8 Is the primary tank free of water?Y Y Y Y ●9 Is the area around the tank (concrete surfaces, ground, containment, etc.) free of visible signs of leakage? Y Y Y Y ●10 Is the cathodic protection system in operating condition and functional? Note: Inspection required every 60 days only. NA NA NA NA ●11 Rectifier reading Volts: Amps: Are these readings within manufacturer specifications? Note: Inspection required every 60 days only. NA NA NA NA Double-Wall Tank Double-Wall Tank Item T4 DSL T2 ETH FREE T3 PUL T1 RUL ®12 For double-wall tanks, is interstice free of liquid?NA NA NA NA ®13 For double-wall tanks, is interstitial monitoring equipment in good working condition?NA NA NA NA Containment (Diking/Impounding) Containment (Diking/Impounding) Item T4 DSL T2 ETH FREE T3 PUL T1 RUL ®14 Is the containment free of liquid, debris, combustible materials, and empty or full drums/barrels?Y Y Y ®15 Are dike drain valves closed and in good working condition?Y Y Y Y ®16 Are containment egress pathways clear and any gates/doors operable?Y Y Y Other Conditions Item T4 DSL T2 ETH FREE T3 PUL T1 RUL ®17 Is the system free of any other conditions needing to be addressed for continued safe operation or that may affect the site SPCC Plan? N N N N Deficiency Information Rec Item Item ID Equip ID Description Remedy Date Image ®17 T1 RUL Coating Failure on all AST's ®17 T2 ETH FREE Coating Failure on all AST's ®17 T3 PUL Coating Failure on all AST's ®17 T4 DSL Coating Failure on all AST's ®2 T4 DSL DSL Functional element verified leaking. Replaced Functional element.08/12/2024 Inspector Information Contractor Signature:Date:08/12/2024 Printed Name:Ray Simms Certification Number:21899