HomeMy WebLinkAboutDERR-2024-011949AST Monthly Compliance Inspection
Facility Information
Name:Fast Stop 1129 Certification/Inspection #:53930
Address:604 W Logan Rd, Garden City, UT, 84028 State ID:
Phone Number:Form Completed By:Ray Simms Date:08/12/2024
# of Tanks Inspected:4 Tank IDs:T3 PUL , T2 ETH FREE, T4 DSL, T1
RUL
Primary Tank and Piping
Inspection Item T4 DSL
T4 DSL
T2 ETH
FREE
T2 ETH
FREE
T3 PUL
T3 PUL
T1 RUL
T1 RUL
●1 Is tank exterior (roof, shell, ends, connections, fittings, valves, etc.) free of visible leaks? Note: If "No",
identify tank and describe leak.
Y Y Y Y
●2 Is aboveground piping (valves, fittings, connections, pumps, etc.) free of visible leaks?Note: If "No",
identify location and describe leak.
N Y Y Y
®3 Are ladders/platforms/walkways secure with no sign of severe corrosion or damage?Y Y Y Y
®4 Are all tank openings properly sealed (capped, plugged, covered, blind flanged, etc.)?Y Y Y Y
®5 Is the tank liquid level gauge readable and in good working condition?Y Y Y Y
®6 Is overfill prevention equipment in good working condition (overfill valve, audible alarm, etc.)? Note: Verify
operation of audible alarms.
Y Y Y Y
®7 Is the spill container (spill bucket) empty, free of visible leaks and in good working condition?NA NA NA NA
●8 Is the primary tank free of water?Y Y Y Y
●9 Is the area around the tank (concrete surfaces, ground, containment, etc.) free of visible signs of
leakage?
Y Y Y Y
●10 Is the cathodic protection system in operating condition and functional? Note: Inspection required every
60 days only.
NA NA NA NA
●11 Rectifier reading Volts: Amps: Are these readings within manufacturer specifications? Note:
Inspection required every 60 days only.
NA NA NA NA
Double-Wall Tank
Double-Wall Tank Item T4 DSL T2 ETH
FREE
T3 PUL T1 RUL
®12 For double-wall tanks, is interstice free of liquid?NA NA NA NA
®13 For double-wall tanks, is interstitial monitoring equipment in good working condition?NA NA NA NA
Containment (Diking/Impounding)
Containment (Diking/Impounding) Item T4 DSL T2 ETH
FREE
T3 PUL T1 RUL
®14 Is the containment free of liquid, debris, combustible materials, and empty or full drums/barrels?Y Y Y
®15 Are dike drain valves closed and in good working condition?Y Y Y Y
®16 Are containment egress pathways clear and any gates/doors operable?Y Y Y
Other Conditions
Item T4 DSL T2 ETH
FREE
T3 PUL T1 RUL
®17 Is the system free of any other conditions needing to be addressed for continued safe operation or that
may affect the site SPCC Plan?
N N N N
Deficiency Information
Rec Item Item ID Equip ID Description Remedy Date Image
®17 T1 RUL Coating Failure on all AST's
®17 T2 ETH
FREE
Coating Failure on all AST's
®17 T3 PUL Coating Failure on all AST's
®17 T4 DSL Coating Failure on all AST's
®2 T4 DSL DSL Functional element verified leaking. Replaced Functional element.08/12/2024
Inspector Information
Contractor Signature:Date:08/12/2024
Printed Name:Ray Simms Certification Number:21899