Loading...
HomeMy WebLinkAboutDERR-2024-011938pei.org 55 Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities APPENDIX C-5 Tester’s Name (print) ___________________________________ Tester’s Signature __________________________________ UST OVERFILL EQUIPMENT INSPECTION AUTOMATIC SHUTOFF DEVICE AND BALL FLOAT VALVE Facility Name:Owner: Address:Address: City, State, Zip Code:City, State, Zip Code: Facility I.D. #:Phone #: Testing Company:Phone #:Date: This data sheet is for inspecting automatic shutoff devices and ball float valves. See PEI/RP1200 Section 7 for inspection procedures. Product Grade Tank Number Tank Volume, gallons Tank Diameter, inches Overfill Prevention Device Brand Type Automatic Shutoff Device Ball Float Valve Automatic Shutoff Device Ball Float Valve Automatic Shutoff Device Ball Float Valve Automatic Shutoff Device Ball Float Valve Automatic Shutoff Device Ball Float Valve Automatic Shutoff Device Ball Float Valve AUTOMATIC SHUTOFF DEVICE INSPECTION 1. Drop tube removed from tank? Yes No Yes No Yes No Yes No Yes No Yes No 2. Drop tube and float mecha- nisms free of debris? Yes No Yes No Yes No Yes No Yes No Yes No 3. Float moves freely without binding and poppet moves into flow path? Yes No Yes No Yes No Yes No Yes No Yes No 4. Bypass valve in the drop tube open and free of blockage (if present)? Yes No Not Present Yes No Not Present Yes No Not Present Yes No Not Present Yes No Not Present Yes No Not Present 5. Flapper adjusted to shut off flow at 95% capacity?* Yes No Yes No Yes No Yes No Yes No Yes No A “No” to any item in Lines 1-5 indicates a test failure. BALL FLOAT VALVE INSPECTION** 1. Tank top fittings vapor- tight and leak-free? Yes No Yes No Yes No Yes No Yes No Yes No 2. Ball float cage free of debris? Yes No Yes No Yes No Yes No Yes No 3. Ball free of holes and cracks and moves freely in cage? Yes No Yes No Yes No Yes No Yes No Yes No 4. Vent hole in pipe open and near top of tank? Yes No Yes No Yes No Yes No Yes No Yes No 5. Ball float pipe proper length to restrict flow at 90% capacity?*** Yes No Yes No Yes No Yes No Yes No Yes No A “No” to any item in Lines 1-5 indicates a test failure. Test Results Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Pass Fail Comments: * Use manufacturer’s suggested procedure for determining if automatic shutoff device will shut off flow at 95% capacity. ** If a ball float is found to fail the inspection, another method of overfill must be used. *** Use manufacturer’s suggested procedure for determining if flow restriction device will restrict flow at 90% capacity.