HomeMy WebLinkAboutDERR-2024-011920Utah Department of Environmental Quality - UST Release Detection
TANK OWNERSHIP
Name CASTLEVIEW HOSPITAL
Address 300 N HOSPITAL DR
PRICE, UT 84501
Contact CASTLEVIEW HOSPITAL
Phone
Email clay.larsen@lpnt.net
TANK LOCATION
Name CASTLEVIEW HOSPITAL
Address 300 N HOSPITAL DR
PRICE, UT 84501
A Operator GARY ANDERSON
Phone (435) 637-4800
B Operator SAME
Phone SAME
Facility ID: 5000036 Inspection Date: 10/29/2024
DISPENSER DETAILS
DISP
ID/ALT
ID
SUBSTANCE UDC PIPE FLEX LOC
INSTALL
DATE
UDC
INSTALL
DATE
FIRE
VALVE
SAT
PRESENT
UDC
TEST
DISP
FLEX
CP
TEST
TANK DETAILS
Tank ID/Alt ID 2 / 2
E-Gen/AST Yes / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Jan. 9, 1998 / 6000 / Single
Substance
Stored Diesel / Diesel #2 (U.L.S.)
Tank Material-
Mod
Composite (Steel w/ FRP)-
Double-Walled
ATG Franklin / TS-550
LTT Test None
LLD Test None
Pipe Material-Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Safe Suction / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Automatic
shutoff / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel Det TankATG PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 3 / 3
E-Gen/AST Yes / Yes
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Jan. 1, 2000 / 1000 /
Substance
Stored Diesel / Off-road Diesel
Tank Material-
Mod
Asphalt Coated or Bare Steel-
Double-Walled
ATG /
LTT Test None
LLD Test None
Pipe Material-Mod Bare Steel / Double-Walled
Pipe type/STP Cont U.S. Suction / No
STP Flex Connectors Not in contact with soil
LLD Model
Spill/Overfill/Sm
Delivery / Overfill alarm / No
PST Fund/Other Type Yes / None
Tank/Pipe Rel Det TankTightness
PipeLDNotListed
CP Tank Test None
CP Pipe Test None
INSPECTION COMMENTS
Title: AST suction pump
inside building on top of day tank. Steel piping in PVC underground to day tank about 8 feet.
No Photos
2024-10-29 Page 1 of 4
FACILITY RESPONSES
The above accurately represents the
facility's release detection records Yes
Financial Responsibility
Financial responsibility method is ok?Yes
Operator Training
A Operator current?Yes
B Operator current?Yes
Monthly checklist available and
complete?Yes
Is the site unmanned?No
TANK RESPONSES
Tank 2 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 2 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 2 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 2 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 2 Suction Piping Leak Detection
Piping qualifies as Safe Suction.
(Documentation is available and
verifiable to show that piping operates
at less than atmospheric pressure, has
only one check valve (under pump),
and has proper slope of piping. If all
these criteria are met, no leak
detection is required on the piping.)
Yes
Tank 2 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 3 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Tank 3 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
2024-10-29 Page 2 of 4
Tank 3 Suction Piping Leak Detection
U.S. suction piping has a valid LTT
every 3 years or monthly monitoring?Yes
DISPENSER RESPONSES
MONTHLY LEAK DETECTION MONITORING
Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24
Tank 2 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 3 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
NON-COMPLIANCE ITEMS
All items are in compliance.
2024-10-29 Page 3 of 4
Prepared by fueloperator.com
Inspection Information
Inspector:Wilson, David
Record Created:Oct. 29, 2024, 12:29
p.m.
Inspection
Date:Oct. 29, 2024
2024-10-29 Page 4 of 4