Loading...
HomeMy WebLinkAboutDRC-2012-001153 - 0901a068802b0800DRC-2012-001153 Denison Mines (USA) Corp 105017th Street Suite 950 Denver CO 80265 USA Tel 303 628-7798 Fax 303 389-4125 www denisonmines com DENISO MINES February 15 2012 VIA PDF AND FEDEX Rusty Lundberg Co Executive Secretary Utah Water Quality Board Utah Department of Environmental Quality 195 North 1950 West P O Box 144850 Salt Lake City UT 84114 4850 Re State of Utah Ground Water Discharge Permit No UGW370004 White Mesa Uranium Mill - Notice Pursuant to Part I G 1 (a) Dear Mr Lundberg The White Mesa Mill (the Mill ) performed fourth quarter ( Q4 ) groundwater monitonng during the period from October 1 to December 31 2011 under the July 14 2011 version of the Mill s Groundwater Discharge Permit (the GWDP ) All analytical data needed for comparison to the GWCLs was received during the period ending January 17 2012 Pursuant to Part IG 1 a) of the GWDP (July 14 2011) please take notice that the concentrations of specific constituents in the monitoring wells highlighted in yellow and bold italics in the columns for the fourth quarter in the attached Table 1 exceeded their respective GWCLs For ease of review Table 1 has been formatted to simplify the tracking of any continued exceedances from one monitonng period to the next by charting ongoing monitoring of the same well in the same row and by highlighting exceedances (in color and bold italics) Part IG 1 c) of the GWDP states that the Permittee shall prepare and submit withm 30 calendar days to the Executive Secretary a plan and a time schedule for assessment of the sources extent and potential dispersion of the contanunation and an evaluation of potential remedial action to restore and maintain groundwater quality to insure that Penrnt limits will not be exceeded at the complieince monitormg pomt and that DMT or BAT will be reestablished The summary below relating to the fourth quarter 2011 exceedances includes for each exceedance a brief discussion of whether such a plan and schedule is or is not required or appropriate at this time in light of other actions currently being undertaken by Denison as determined by Utah Department of Environmental Quality (UDEQ) Staff and as stated m teleconferences with Denison on April 27 and May 2 2011 Based on the assessments noted below relating to the fourth quarter N \Notices\GW Exceedence notices\2012 Exceedance Notices\Notice_of_Exceedance_GW_Q4 2011 02_15 docx Letter to Mr Rusty Lundberg February 15 2012 Page 2 exceedances a plan and schedule for the fourth quarter 2011 exceedances will not be required for the reasons stated Under the July 14 2011 revision of the GWDP GWCLs have been determined on a well by well basis to reflect background groundwater quality as defined by the mean plus second standard deviation concentration or the equivalent Accordingly the GWDP requires that constituent concentrations m each monitoring well shall not exceed the GWCLs set out in Table 2 of the GWDP It should be noted that because the GWCLs have been set at the mean plus second standard deviation or the equivalent un impacted groundwater would normally be expected to exceed the GWCLs approximately 2 5% of the time Therefore exceedances are expected in approximately 2 5% of all sample results and do not necessanly represent impacts to groundwater from Mill operations The following are items of note relevant to all exceedance data presented herein 1 Nitrate + nitnte and chloride in monitoring wells at the site have been the subject of ongoing investigations at the Mill Based on the results of the previous investigations Denison and the Executive Secretary acknowledge that it has not been possible to date to determine the source(s) cause(s) attribution magnitudes of contribution and proportion(s) of the local nitrate + nitnte and chloride m groundwater Denison submitted a Corrective Action Plan ( CAP ) for nitrate + nitrite and chloride m groundwater The CAP is currently under revision in response to DRC comments and will be resubmitted on or before February 27 2012 Based on information provided by UDEQ in teleconferences on Apnl 27 and May 2 2011 due to the ongoing activities and actions the 30 day plan and schedule for assessment is not required for nitrate + nitrite and chloride exceedances at this time 2 As discussed in previous quarterly groundwater sampling reports the background levels and GWCLs for pH were established based on eight or more quarters of laboratory data which are historically higher than field data due to effects from the evolution of carbon dioxide and subsequent increase m pH from field to lab Denison s letter to the Co Executive Secretary of the Utah Water Quality Board dated January 31 2011 proposed the recalculation of the GWCLs for field pH Following the statistical evaluation of pH data by Denison s geochemical consultant INTERA Inc Denison compared the Mill s most recent groundwater pH data from the second quarter of 2011 including accelerated sampling results as recent as June 2011 and noted that all of the June 2011 groundwater results and many of the other results from the second quarter were already outside the revised GWCLs that were to be proposed in the June 30 2011 letter By the letter dated June 30 2011 Denison proposed to submit to DRC a Work Plan and Schedule to complete investigations to address the site wide pH issue following a meeting with DRC to discuss Denison s findings to date and to agree upon the steps and milestone dates to be incorporated in the Work Plan and Schedule Pursuant to teleconferences with DRC on December 5 and December 19 2011 Denison submitted the Work Plan and Schedule on January 20 2012 The Work Plan and Schedule are cunently under review by DRC DENISO MINES N \Notices\GW Exceedence noUces\2012 Exceedance Notices\Notice_of_Exceedance_GW_Q4 2011 02_15 docx Letter to Mr Rusty Lundberg February 15 2012 Pages Based on information provided by UDEQ in teleconferences on April 27 and May 2 2011 and due to the current commitment to evaluate site field pH conditions the 30 day plan and schedule for assessment is not required for field pH exceedances I 0 Exceedances in Required Quarterly Samphng Wells II Quarterly Wells with Two Successive Exceedances As indicated in the attached Table 1 the analytes discussed below exceeded their respective GWCLs for two successive sampling penods m the fourth quarter 2011 However the 30 day plan and schedule contemplated in Part IG 1 c) of the GWDP will not be required for these particular consecutive exceedances which first occurred m the fourth quarter of 2011 for the reasons stated below One time exceedances and non successive exceedances are noted on Table 1 but not listed below Consecutive exceedances which occurred m previous reporting periods are discussed in the respective 30 day plan and schedule for that quarter MW 26 • Nitrate + nitrite concentration exceeded its GWCL in all sampling events during the fourth quarter 2011 As mentioned above nitrate + nitrite concentrations are currently under re evaluation and a plan to address this consecutive exceedance is not necessary and IS not being submitted Uranium concentration exceeded its GWCL m all of the Q4 sampling events Uranium concentrations exceeded the GWCLs in two consecutive sampling events in 2010 The consecutive uranium exceedances noted in MW 26 were previously discussed in the Ql 2011 Plan and Time Schedule Under Part IG4 (d) subimtted to UDEQ on June 13 2011 and revised on January 20 2012 An additional plan or schedule to address the Q4 exceedances is not necessary and is not being subnutted because the assessment processes and schedule have not changed since the June 13 2011 and January 20 2012 submissions Chloroform in MW 26 has exceeded its GWCL for all of the monitoring periods for 2011 MW 26 IS used as a pumping well for the ongoing chloroform capture program and IS expected to yield increased concentrations of chloroform Methylene chloride in MW 26 exceeded its GWCL m the November and December monthly sampling events MW 26 is used as a pumping well for the ongoing chloroform capture program and is expected to yield increased concentrations of methylene chloride MW 26 Note As stated in the September 2009 Statement of Basis (page 23) in support of the January 20 2010 revisions to the GWDP [i]t should be noted that because MW 26 is a pumping well for chloroform removal concentrations of all constituents in that well are subject to potential variation over time as a result of the pumping activity This will be taken into account by the Executive Secretary m detemumng compliance for this well Based on DENISO MINES N \Notices\GW Exceedence notices\2012 Exceedance Notices\Notice_of_Exceedance_GW_Q4 2011 02_15 docx Letter to Mr Rusty Lundberg February 15 2012 Page 4 information provided by UDEQ in teleconferences on April 27 and May 2 2011 due to the current pumping status as part of the chloroform investigation program the 30 day plan and schedule for assessment is not required at this time for exceedances of chloroform and methylene chlonde in MW 26 • Chloride concentration exceeded its GWCL in the October (Q4) and December sampling events As mentioned above chloride concentrations are currently under re evaluation and a plan to address this consecutive exceedance is not necessary and is not being submitted MW 30 • Nitrate + nitrite concentration exceeded its GWCL m all sampling events during the fourth quarter 2011 and dunng previous quarters As mentioned above nitrate + nitrite concentrations are cunently under re evaluation and a plan to address this consecutive exceedance is not necessary and is not being submitted Chloride concentration exceeded its GWCL m the September monthly and the October (Q4) sampling events As mentioned above chlonde concentrations are cunently under re evaluation and a plan to address this consecutive exceedance is not necessary and is not being submitted Selenium concentration exceeded its GWCL in all sampling events dunng the first and second quarter 2011 The consecutive selenium exceedances noted in MW 30 in Q4 2011 were previously discussed in the Ql 2011 Plan and Time Schedule Under Part IG4 (d) submitted to UDEQ on June 13 2011 as revised on January 201 2012 An additional plan or schedule to address the Q4 exceedances is not necessary and is not being submitted because the assessment processes and schedule have not changed since the June 13 2011 and January 20 2012 subnussions MW 31 Nitrate + nitrite concentration exceeded its GWCL in all sampling events during the fourth quarter 2011 and dunng previous quarters As mentioned above nitrate + nitnte concentrations are cunently under re evaluation and a plan to address this consecutive exceedance is not necessary and is not being submitted Chloride concentration exceeded its GWCL in all sampling events during the fourth quarter 2011 As mentioned above chloride concentrations are cunently under re evaluation and a plan to address this consecutive exceedance is not necessary and is not being submitted Sulfate concentration exceeded its GWCL in the October (Q4) and November sampling events Sulfate concentrations exceeded the GWCLs in two consecutive sampling events in Ql 2011 The consecutive sulfate exceedances noted in MW 31 m Q4 2011 were previously discussed in the Ql 2011 Plan and Time Schedule Under Part IG4 (d) DENISO MINES N \NoUces\GW Exceedence notices\2012 Exceedance Notices\Notice_of_Exceedance_GW_Q4 2011 02_15 docx Letter to Mr Rusty Lundberg February 15 2012 Page 5 submitted to UDEQ on June 13 2011 as revised on January 201 2012 An additional plan or schedule to address the Q4 exceedances is not necessary and is not being subnutted because the assessment processes and schedule have not changed since the June 13 2011 and January 201 2012 submissions MW 35 • Manganese concentration exceeded the GWCL in MW 35 m all of the Q4 sampling events The consecutive manganese exceedances noted in MW 35 were previously discussed in the Plan and Time Schedule Under Part 104 (d) submitted to UDEQ on September 7 2011 as revised on January 20 2012 An additional plan or schedule to address the Q4 exceedances is not necessary and is not being subnutted because the assessment processes and schedule have not changed since the September 7 2011 and January 20 2012 submissions It should be noted that background has not yet been established for MW 35 and that the intenm GWCLs for MW 35 have been set at a fraction of the Groundwater Quality Standards pending the determination of background Therefore exceedances of the interim GWCLs do not necessarily represent impacts to groundwater from Mill activities • Uranium concentration exceeded the GWCL in MW 35 in all of the Q4 sampling events The consecutive uranium exceedances noted in MW 35 were previously discussed in the Plan and Time Schedule Under Part IG4(d) submitted to UDEQ on September 7 2011 as revised on January 20 2012 An additional plan or schedule to address the Q4 exceedances is not necessary and is not being submitted because the assessment processes and schedule have not changed since the September 7 201 land January 20 2012 submissions It should be noted that background has not yet been established for MW 35 and that the interim GWCLs for MW 35 have been set at a fraction of the Groundwater Quality Standards pending the determination of background Therefore exceedances of the interim GWCLs do not necessarily represent impacts to groundwater from Mill activities • Gross alpha concentration exceeded the GWCL in MW 35 m all of the Q4 sampling events An additional plan or schedule to address the Q4 exceedances is not necessary and IS not being submitted because the background has not yet been established for MW 35 and the interim GWCLs for MW 35 have been set at a fraction of the Groundwater Quality Standards pending the determination of background Therefore exceedances of the intenm GWCLs do not necessarily represent impacts to groundwater from Mill activities • Thallium concentration exceeded the GWCL in MW 35 in the Q3 2011 (August) Q4 2011 (October) and the December monthly sampling events An additional plan or schedule to address the these exceedances is not necessary and is not being submitted because the background has not yet been established for MW 35 and the interim GWCLs for MW 35 have been set at a fraction of the Groundwater Quality Standards pending the DENISO MINES N \Notices\GW Exceedence notices\2012 Exceedance Notices\Notice_of_Exceedance_GW_Q4 2011 02_15 docx Mi Letter to Mr Rusty Lundberg February 15 2012 Page 6 determination of background Therefore exceedances of the interim GWCLs do not necessarily represent impacts to groundwater from Mill activities 1 2 Quarterly Wells with New Exceedances Reported in Q4 New exceedances for the Q4 2011 quarterly well sampling program are listed below The exceedances listed will result in an accelerated sampling frequency from quarterly to monthly It IS important to note that the wells listed below will only be sampled during the monthly events for those constituents which exceeded the GWCLs The wells listed below will be sampled for all constituents listed in the GWDP during the quarterly events as that is the regularly scheduled sampling for the quarterly wells • Uranium in MW 30 exceeded the GWCL in the October (Q4) sampling event 2 0 Exceedances m Semiannual Samphng Wells Accelerated to Quarterly 2 1 Seim annual Wells with Two Successive Exceedances As indicated m the attached Table 1 the analytes discussed below exceeded their respective GWCLs for two successive samphng periods (Q3 [2011] and Q4 [2011]) MW 3 Selenium has exceeded the GWCL for both the Q3 sampling event and the Q4 sampling event The consecutive selenium exceedances noted in MW 3 were previously discussed in the Plan and Time Schedule Under Part IG4 (d) submitted to UDEQ on June 13 2011 as revised on January 20 2012 An additional plan or schedule to address the Q4 exceedances is not necessary and is not being submitted because the assessment processes and schedule have not changed since the June 13 2011 and January 20 2012 subnussions Fluoride has exceeded the GWCL for both the Q3 sampling event and the Q4 sampling event The consecutive selenium exceedances noted in MW 3 were previously discussed in the Plan and Time Schedule Under Part IG4 (d) subnutted to UDEQ on June 13 2011 as revised on January 20 2012 An additional plan or schedule to address the Q4 exceedances is not necessary and is not being submitted because the assessment processes and schedule have not changed since the June 13 2011 and January 20 2012 submissions MW 12 • Selenium has exceeded the GWCL for both the Q3 sampling event and the Q4 sampling event The consecutive selenium exceedances noted in MW 12 were previously discussed in the Plan and Time Schedule Under Part IG4 (d) subnutted to UDEQ on June 13 2011 as revised on January 20 2012 An additional plan or schedule to address the Q4 DENISO MINES N \Notices\GW Exceedence notices\2012 Exceedance Notices\Notice_of_Exceedance_GW_Q4 2011 02_15 docx Letter to Mr Rusty Lundberg February 15 2012 Page? exceedances is not necessary and is not being submitted because the assessment processes and schedule have not changed since the June 13 2011 and January 20 2012 submissions MW 18 Thallium has exceeded the GWCL for both the Q3 sampling event and the Q4 sampling event The consecutive thallium exceedances noted in MW 18 were previously discussed in the Plan and Time Schedule Under Part IG4 (d) subnutted to UDEQ on June 13 201 las revised on January 20 2012 An additional plan or schedule to address the Q3 exceedances is not necessary and is not being submitted because the assessment processes and schedule have not changed since the June 13 201 land January 20 2012 submissions MW 24 • Field pH has been slightly outside (slightly lower than) the GWCL for both the Q3 sampling event and the Q4 sampling event As mentioned above site wide pH issues and trends are cunently under re evaluation and a plan and schedule to address this consecutive exceedance is not necessary and is not being subimtted MW 27 • Nitrate + Nitnte have exceeded the GWCL for both the Q3 sampling event and the Q4 sampling event and during previous quarters As mentioned above nitrate + nitnte concentrations are cunently under re evaluation and a plan to address this consecutive exceedance is not necessary and is not being submitted • Chloride has exceeded the GWCL for both the Q3 sampling event and the Q4 sampling event and during previous quarters As mentioned above chloride concentrations are cunently under re evaluation and a plan to address this consecutive exceedance is not necessary and is not being submitted • TDS has exceeded the GWCL for both the Q3 sampling event and the Q4 sampling event The consecutive TDS exceedances noted in MW 27 were previously discussed in the Plan and Time Schedule Under Part IG4 (d) submitted to UDEQ on June 13 2011 as revised on January 20 2012 An additional plan or schedule to address the Q4 exceedances is not necessary and is not being submitted because the assessment processes and schedule have not changed since the June 13 2011 and January 20 2012 submissions MW 28 Field pH has been slightly outside (slightly lower than) the GWCL for both the Q3 sampling event and the Q4 sampling event and dunng previous quarters As mentioned above site wide pH issues and trends are cunently under re evaluation and a plan and schedule to address this consecutive exceedance is not necessary and is not being submitted DENISO MINES N \Notices\GW Exceedence notices\2012 Exceedance Notices\Notice_of_Exceedance_GW_Q4 2011 02_15 docx Mi Letter to Mr Rusty Lundberg February 15 2012 Page 8 MW 32 • Field pH has been slightly outside (slightly lower than) the GWCL for both the Q3 sampling event and the Q4 sampling event and during previous quarters As mentioned above site wide pH issues and trends are cunently under re evaluation and a plan and schedule to address this consecutive exceedance is not necessary and is not being submitted 2 1 Seim annual Wells with New Exceedances Reported in Q4 New exceedances for the senu annual well sampling program are listed below The exceedances listed will result m an accelerated sampling frequency from senu annually to quarterly It is important to note that dunng the first and third quarterly events the wells listed below will only be sampled for those constituents which exceeded the GWCLs because the first and third quarterly events do not include the semi annual well sampling program The wells listed below will be sampled for all constituents listed in the GWDP dunng the second and fourth quarter events as that is the regularly scheduled sampling for the semi annual wells • Iron in MW 15 exceeded the GWCL in the Q4 sampling event in October 2011 • Nitrate + Nitrite in MW 19 exceeded the GWCL in the Q4 sampling event in October 2011 • Manganese in MW 23 exceeded the GWCL in the Q4 samphng event in October 2011 If you have any questions or require any further information please contact the undersigned W^nivTischler director Compliance and Permitting David Frydenlund Ron Hochstem Harold Roberts David Turk DENISO MINES N \Notices\GW Exceedence notices\2012 Exceedance Notices\Notice_of_Exceedance_GW_Q4 2011 02_15 docx J)ii 13r> Q13 .010 Results -->> V < (22 2010 Results > .:^^^^Q3 2010 Results Q4 2010 Results Moniton g WeU(W te Class) Co statue t E ceed ng GWCL GWCL July 14 2011 GWDP Ql 2010" Sample Date Ql 2010 Result Q2 2010^ Sample Date ft" Q2 2010 Result May 2010 M nthiy S mpleDate May 2010 Monthly Result J 2010 Mo thiy S mpleDate J ne2010 Mo thly Result J ly2010 Mo thly SampI Date July,2010 Monthly Result August 2010 Monthly Sample Date August 2010 Mo thly R s It Q3 2010 S mpleDate , Q3 2010 Result Octobe 2010 " Mo thly Sample Date Octobe 2010 Mo thly , Result Q4 2010 S mpleDate ;j^X?4 2010f.^ Result Decembe ; 2010 Mo thly Sample Date Decembe 2010 Monthly Result Required Qua rte ly Sampbng W Ils MW 11 (Class n) ifMangan ( g/L) i 13129 2/10/10 134 4/28/10 137 ^ -=^^5/24/10"' 122 ?6/16/10 5 99 1 7/20/10 i 123 "8/25/10 138 i 9/8/10 128 -ilO/20/10 — 141 11/11/10 133 12/15/10 158 MW 11 (Class n) T trahydr furan ( g/L) } 115 2/10/10 12 4/28/10 5 2.,.. * 5/24/10 1 <10 16/I6/IO i* <10 7/27/10 ^ 217 8/25/10 'i <10 9/8/10 ' <1 0 -ilO/20/10 — 1 <10 11/11/10 S <1 0 ~ 12/15/10 ~ r "<i 0 MW 14 (Class ni).; IdpHTsU) -^^ 2/2/lOT 645 ^-4/21/10 629 -^5/21/10-^ 636 =-^6/16/10"=^ 645 -p7 19 -8/25/10--^ 648 ^-=^9/8/10--"--4-6 51—-= I <-*•!, I1O/2O/IO— --^ 6 60 -11/10/10 637 12/15/10 647 MW 25 (Clas ^ in) - F Id pH (S U ) 65_8r,. "^2/26/20Tcr" i T^a" —V6 53 1 4/28/2010"^ i 1 ~ \ NA^ ,J_NS.i_ -.^ NA^L,,. NS^^ % J2 NA 1 ~ 9/8/2010""'°" _ L6 58"^ T„NA "T— 11/10/10 ^ 636 ^TTNA^II MW 25 (Clas ^ in) J \ U ahi m " "^2/26/20Tcr" i T^a" {"5 93 r 1 4/28/2010"^ i 1 ! 6 43 NS f NA NS ~1"NA~ " NS " NA""^ -ir^NA —" 1 ~ 9/8/2010""'°" 657 - 1'~NA 11/10/10 f5 89 f MW26 (Clas ni) N tr te N tnte (as N) '*"-^""(mK/L) -0 62.^.^*^ 2/2/10 13 4/22/10 2 ! V 5/21/10 _4>-0 3_^A_< r 6/16/10 ^.^0 4L„ Nt, T 7/21/10 1 • — - 0 6., 1 """•>! 8/16/10 .Jl.06 ^7 f I •1 -1 9/26/10 07 ...t„ 0.4, 11/15/10 37-0 4 f MW26 (Clas ni) ? U am m ( g/L) \ 418 2/2/10 58 7 4/22/10 .66 7 ! V 5/21/10 j 37 4 r 6/16/10 1 36 6 ^ Nt, T 7/21/10 i 34 4 1 """•>! 8/16/10 718 f I •1 -1 9/26/10 72 7 Jf 37 5 11/15/10 .^30 4 ' 29 6 \ f MW26 (Clas ni) 'Chl f rm"(iig/L) ~ ~i( 70 2/2/10 700 4/22/10 1700 ! V 5/21/10 800 r 6/16/10 940 Nt, T 7/21/10 900 1 """•>! 8/16/10 2800 f I •1 -1 9/26/10 2100 i 10/20/10 1000 11/15/10 1900 1400 f MW26 (Clas ni) ? Chl^nd (mg/L) ~ " "58 31 2/2/10 72 4/22/10 i 57 ! V 5/21/10 80 r 6/16/10 Nt, T 7/21/10 1 """•>! 8/16/10 " ""49 r f I •1 -1 9/26/10 64 i 10/20/10 52— 11/15/10 48 - 12/15/10 f MW26 (Clas ni) F IdpH(SU) 6 74 8 5 2/2/10 659 4/22/10 C7 18 ! V 5/21/10 636 r 6/16/10 6 98 Nt, T 7/21/10 645 1 """•>! 8/16/10 639 f I •1 -1 9/26/10 6 60 i 10/20/10 661 11/15/10 649 12/15/10 645 f MW26 (Clas ni) f D hlo om thane (Methyle e Chl nde) 5 2/2/10 1 4/22/10 99 ! V 5/21/10 NR r 6/16/10 22 Nt, T 7/21/10 12 1 """•>! 8/16/10 24 f I •1 -1 9/26/10 45 i 10/20/10 55 11/15/10 16 12/15/10 1 2 f MW26 (Clas ni) TDS (mg/L) 3284 19 2/2/10 3100 4/22/10 3280 ! V 5/21/10 NS r 6/16/10 NS Nt, T 7/21/10 NS NS f I •1 -1 9/26/10 3440 i 10/20/10 NS 11/15/10 3140 NS f MW26 (Clas ni) Gros Alpha min R & U (pCi/L) 4 69 2/2/10 24 4/22/10 06 ! V 5/21/10 NS r 6/16/10 NS Nt, T 7/21/10 NS NS f I •1 -1 9/26/10 25 i 10/20/10 NS 11/15/10 „ 64 NS MW 30 (Clas U) N trate -i- N tnte (as N) (mg/L) 25 2/9/10 161 4/27/10 158 5/21/10 17 6/15/10 153 7/21/To 16 8/24/lo" 16 9/14/10 /5 10/19/10 /5 11/9/10 15 12/14/10 16 MW 30 (Clas U) Chlonde (mg/L) 128 2/9/10 127 4/27/10 97 5/21/10 NS 6/15/10 NS NS NS NS NS 9/14/10 111 10/19/10 NS 11/9/10 126 12/14/10 NS MW 30 (Clas U) F IdpH(SU) 65 85 2/9/10 681 4/27/10 6 55 5/21/10 6 62 6/15/10 7 47 7/21/2010 6 82 8/24/10 6 73 9/14/10 6 80 10/19/10 6 77 11/9/10 6 75 12/14/10 6 65 MW 30 (Clas U) U am m ( g/L) 8 32 2/9/10 6 82 4/27/10 6 82 5/21/10 NS 6/15/10 NS NS NS NS NS 9/14/10 7 10 10/19/10 NS 11/9/10 664 12/14/10 NS MW 30 (Clas U) Sel mum( g/L) 34 2/9/10 32 4/27/10 353 5/21/10 NS 6/15/10 NS 7/27/10 33 5 8/24/10 35 6 9/14/10 32 6 10/19/10 32 4 11/9/10 32 2 12/14/10 30 5 MW31 (Clas DI) N trate + N tnte (as N) (mg/L) 5 2/9/10 21 7 4/20/10 22 5 5/21/10 23 6/15/10 211 7/21/10 20 8/24/10 22 9/13/10 21 10/19/10 20 11/9/10 20 12/14/10 20 MW31 (Clas DI) TDS (mg/L) 1320 2/9/10 1150 4/20/10 1220 NS NA NS NA NS NA NS NA 9/13/10 1330 NS NA 11/9/10 1320 12/14/10 NS MW31 (Clas DI) Chlonde (mg/L) 143 2/9/10 128 4/20/10 128 NS NA NS NA NS NA NS NA 9/13/10 139 NS NA 11/9/10 138 12/14/10 NS MW31 (Clas DI) F IdpH(SU) 65 85 2/9/10 6 96 4/20/10 7 38 5/21/10 6 95 6/15/10 7 01 7/21/10 78 8/24/10 7 1 9/13/10 7 66 10/19/10 6 92 11/9/10 6 98 12/14/10 6 95 MW31 (Clas DI) S If te (mg/L) 532 2/9/10 507 4/20/10 522 NS NA NS NA NS NA NS NA 9/13/10 527 NS NA 11/9/10 539 12/14/10 NS MW 35 (Clas n) Manganese ( g/L) 200 NS NA NS NA NS NA NS NA NS NA NS NA NS NA NS NA 11/30/10 698 NS NA MW 35 (Clas n) Thall m( g/1) 05 NS NA NS NA NS NA NS NA NS NA NS NA NS NA NS NA 11/30/10 114 NS NA MW 35 (Clas n) G OSS Alph mm R & U (pCi/L) 3 75 NS NA NS NA NS NA NS NA NS NA NS NA NS NA NS NA 11/30/10 26 NS NA MW 35 (Clas n) U am m ( g/L) 75 NS NA NS NA NS NA NS NA NS NA NS NA NS NA NS NA 11/30/10 272 NS NA Req md Semi Annual S mphng Wells MW 2 (Clas ni) G Alpha mi sR & U (pCi/L) 32 NS NA 1 2 NS NA NS NA NS NA NS NA NS NA NS NA 55 NS NA MW 3 (Class m) S 1 m m ( g/L) 37 NS NA 5/3/10 372 NS NA NS NA NS NA NS NA 9/20/10 35 5 NS NA 11/19/10 38 8 NS NA MW 3 (Class m) Feid pH(SU) 65 85 NS NA 5/3/10 614(625) NS NA NS NA NS NA NS NA 9/20/10 639 NS NA 11/19/10 635 NS NA MW 3 (Class m) Fi onde(Mg/L) 0 68 NS NA 5/3/10 0 71 NS NA NS NA NS NA NS NA 9/20/10 0 63 NS NA 11/19/10 0 77 NS NA MW 3A (Clas ni) FeldpH (SU) 65 8 5 NS NA 5/4/10 623(624) NS NA NS NA NS NA NS NA 9/21/10 642 NS NA 11/22/10 621 NS NA MW 3A (Clas ni) S If te (mg/L) 3640 NS NA 5/4/10 3680 NS NA NS NA NS NA NS NA 9/21/10 3630 NS NA 11/22/10 3850 NS NA MW 3A (Clas ni) TDS (mg/L) 5805 NS NA 5/4/10 5860 NS NA NS NA NS NA NS NA 9/21/10 5470 NS NA 11/22/10 5330 NS NA MW 3A (Clas ni) S 1 m m( g/L) 89 NS NA 5/4/10 81 4 NS NA NS NA NS NA NS NA 9/21/10 NS NS NA 11/22/10 948 NS NA MW 5 (Class n) Uram m( g/L) 75 NS NA 4/26/10 0 39 NS NA NS NA NS NA NS NA NS NA NS NA 11/11/10 116 NS NA MW 12 (Clas ID) F IdpH(SU) 65 85 NS NA 4/27/10 7 16 NS NA NS NA NS NA NS NA 9/20/10 6 62 NS NA 11/19/10 11/11/10 647 NS NA MW 12 (Clas ID) S 1 m m ( g/L) 25 NS NA 4/27/10 25 7 NS NA NS NA NS NA NS NA 9/20/10 319 NS NA 11/19/10 11/11/10 276 NS NA MW 15 (Class m Ir ( g/L) 81 7 NS NA 4/21/10 ND NS NA NS NA NS NA NS NA NS NA NS NA 11/19/10 11/11/10 ND NS NA MW 18 (Clas ID) Thall m( g/1) 1 95 NS NA 5/4/10 3 73 NS NA NS NA NS NA NS NA 9/15/10 364 NS NA 11/18/10 3 57 NS NA MW 18 (Clas ID) S If te (mg/L) 1938 9 NS NA 5/4/10 1950 NS NA NS NA NS NA NS NA 9/15/10 1930 NS NA 11/18/10 1910 NS NA MW 18 (Clas ID) F IdpH(SU) 6 25 8 5 NS NA 5/4/10 62 NS NA NS NA NS NA NS NA 9/15/10 7 23 NS NA 11/18/10 6 37 NS NA MW 18 (Clas ID) TDS (mg/L) 3198 77 NS NA 5/4/10 3280 NS NA NS NA NS NA NS NA 9/15/10 3190 NS NA 11/18/10 3030 NS NA Ql 2010 Results Q2 2010 Results 03 2010 Res Its Q4 2010 Results Mon tonng WeU (Wate Class) Constatue tE ceed ing GWCL GWCL Current GWDP Ql Sample Date Ql Result Q2 Sample Date Q2 Result May Monthly Sample Date May Mo thly Result J e Monthly Sample D te June M thly Result Juiy Mo thly Sample Date July Monthly Result August Mo thly Sample Date August Monthly Result Q3 SampI Date Q3 Result Octobe Mo thly Sample Date Octobe Monthly Result Q4 Sample Date Q4 Result December Mo thly Sample D te Decembe M thly Result Required Sem A ual Samplmg Wells, CO ta ed MW 19 (Clas ID) Feid pH(SU) 6 78 8 5 NS NA 5/4/10 661(666) NS NA NS NA NS NA NS NA 9/15/10 6 93 NS NA 11/18/10 68 NS NA MW 19 (Clas ID) N trat -1- N tnte (as N) (mg/L) 2 83 NS NA 5/4/10 26 NS NA NS NA NS NA NS NA 9/15/10 NS NA NA 11/18/10 24 NS NA MW 23 (Clas m) F IdpH(SU) 65 85 NS NA 4/22/10 618 NS NA NS NA NS NA NS NA 9/14/10 7 05 NS NA 11/22/10 644 NS NA MW 23 (Clas m) Manganese ( g/L) 550 NS NA 4/22/10 184 NS NA NS NA NS NA NS NA 9/14/10 NS NS NA 11/22/10 65 NS NA MW 24 (Class m) Cadrai m( g/L) 25 NS NA 5/6/10 428 NS NA NS NA NS NA NS NA 9/21/10 506 NS NA 11/17/10 322 NS NA MW 24 (Class m) Thall m ( g/L) 1 NS NA 5/6/10 13 NS NA NS NA NS NA NS NA 9/21/10 157 NS NA 11/17/10 109 NS NA MW 24 (Class m) F eld pH (S U ) 65 85 NS NA 5/6/10 591(5 78) NS NA NS NA NS NA NS NA 9/21/10 6 64 NS NA 11/17/10 61 NS NA MW 27 (Class ni) N tr te + N tnte (as N) (mg/L) 56 NS NA 5/3/10 58 NS NA NS NA NS NA NS NA 9/14/10 J 59 NS NA 11/12/10 57 NS NA MW 27 (Class ni) Chl nd (mg/L) 38 NS NA 5/3/10 42 NS NA NS NA NS NA NS NA 9/14/10 J 42 NS NA 11/12/10 45 NS NA MW 27 (Class ni) S If te (mg/L) 462 NS NA 5/3/10 469 NS NA NS NA NS NA NS NA 9/14/10 J 461 NS NA 11/12/10 452 NS NA MW 27 (Class ni) FeldpH (SU) 65 8 5 NS NA 5/3/10 6 78 NS NA NS NA NS NA NS NA 9/14/10 J 7 68 NS NA 11/12/10 6 89 NS NA MW 27 (Class ni) TDS (mg/L) 1075 NS NA 5/3/10 1160 NS NA NS NA NS NA NS NA 9/14/10 J 1060 NS NA 11/12/10 1110 NS NA MW 27 (Class ni) G s Alpha nu R & U (pCi/L) 2 NS NA 5/3/10 1 6 NS NA NS NA NS NA NS NA 9/14/10 J NA NS NA 11/12/10 24 NS NA MW 28 (Class m) Chlond (mg/L)~ 105 NS -NA 4/19/10 108 NS - NA-==-::^.NS--NA NS NA NS NA 9/14/10 106 NS NA 11/12/10 107 NS NA MW 28 (Class m) Feid pH(SU) 61 85 NS NA 4/19/10 567 NS NA NS NA NS NA"" NS NA 9/14/10 5 91 NS NA 11/12/10 5 72 NS NA MW 29 (Clas m) Iro ( ft/L) 1869 NS NA 4/27/10 1630 NS NA NS NA NS NA NS NA NS NA NS NA 11/9/10 1490 NS NA MW 29 (Clas m) FeldpH(SU) 646 8 5 NS NA 4/27/10 6 82 NS NA NS NA NS NA NS NA NS NA NS NA 11/9/10 617 NS NA MW 32 (Class in) G OSS Alpha mi s R & U (pCi/L) 3 33 NS NA 4/20/10 54 NS NA NS NA NS NA NS NA 9/13/10 29 NS NA 11/10/10 88 NS NA MW 32 (Class in) F eld pH (S U ) 64 85 NS NA 4/20/10 603 NS NA NS NA NS NA NS NA 9/13/10 6 33 NS NA 11/10/10 6 05 NS NA N te GWCL ales are take f omF bruary 15 2011 ers of GWDP NS = Not Required and N t Sampled NR - Req ired and Not Reported NA = Not Appl c ble E ceedan are show yellow Val s nQpare these are the Feid pH measureme tsfo th esampled analyses jPurs ant to the October 26,2011 DRC lette gros alpha m mt n g MW 26 returned t the tme freq e y of q arteriy Table 3 - GWCL Exceedances for Third Quarter 2011 under the July 14 2011 GWDP Ql 2011 Res Its 02 2011 Res Its Q3 2011 Res Its 04 2011 Results Mo to gWeU (Wate Cl ) C statu tE ceed g GWCL GWCL J Iyl4 2011 GWDP Ja ay 2011 M thly S mple Date J uary 2011 Mo thiy S mple Res It Ql 2011 S mple D te Ql 2011 Result March 2011 Mo thly Sample Date M h2011 M thly Result Q2 2011 Sample Date Q2 2011 Result M y 2011 M nthly S mple Date May 2011 M thly Result J 2011 M thly S mpleD te Ju 2011 Mo thiy Res it J iy2011 Mo thly Sample D te July 2011 M thly Result Q3 2011 S mpl D te Q3 2011 Result Septembe 2011 M thly SampI Date S ptembe 2011M thly Re ult Q4 2011S mpl D te Q4 2011 Resuh No embe 2011 Mo thiy Sample Date No mb 2011 M thly R suit Decembe 2011 M thiy Sample D te Decembe 2011 M nthly Result S mpl Frequ y Req redQ rt iySamph gW ils MW 11 (Class n) Mangane ( g/L) 131 29 1/11/11 121 2/2/11 145 3/15/11 68 4/4/2011 148 5/10/2011 170 6/15/2011 121 7/6/2011 151 8/3/2011 118 9/7/2011 106 10/4/2011 112 11/9/2011 105 12/14/2011 100 Q art ly MW 11 (Class n) Tetrahydr furan ( g/L) 11 5 1/11/11 <1 0 2/2/11 <1 0 3/15/11 1 0 4/4/2011 <1 0 5/10/2011 <10 6/20/2011 <1 0 7/6/2011 <1 0 8/30/11 <1 0 9/7/2011 <1 0 10/4/2011 <1 0 11/9/2011 <1 0 12/14/2011 <10 Q arte ly MW 14 (Clas ni) FeldpH (SU) 65 85 1/11/11 637 2/7/11 622 3/14/11 6 76 4/4/2011 663 5/10/2011 637 6/15/2011 5 S3 7/5/2011 64 8/3/2011 623 (641) 9/8/2011 6 50 10/4/2011 6 71 (6 82) 11/9/2011 6 63 12/12/2011 6 84 Q arte ly MW 25 (Clas III) F IdpH(SU) 65 85 1/11/11 644 2/2/11 6 66 3/15/11 6 79 4/4/2011 67 5/11/2011 61 6/20/2011 5 77 7/6/2011 629 8/3/2011 8/30/11 642 (654) 9/7/2011 6 54 10/4/2011 66 11/9/2011 6 51 1212/2011 6 87 Q art ly U am m 65 702 4 77 68 5 56 6 72 7 06 6 74 8/3/2011 6 37 5 96 5 27 656 6 1 Q art ly N tr te -1- N tnt (as N) (mg/L) 0 62 02 0 25 06 08 04 03 09 06 24 09 13 23 Q arte ly U am m ( g/L) 41 8 32 69 3 31 8 602 574 18 5 571 190 561 589 556 57 Q arte ly Chl f nn ( g/L) 70 800 730 1200 390 1900 730 300 1000 1300 440 1200 1400 Q arte ly Chlonde (mg/L) 58 31 52 59 64 64 54 39 64 60 66 61 55 62 Q arte ly MW 26 (Clas UI) Feid pH(SU) 6 74 8 5 1/12/11 6 83 2/16/11 6 06 3/15/11 6 89 4/1/2011 622 5/10/2011 643 6/20/2011 652 7/6/2011 635 8/3/2011 8/30/11 607 (658) 9/7/2011 6 71 10/12/2011 6 82 11/9/2011 6 75 12/14/2011 7 1 Q arte ly MW 26 (Clas UI) D chl m than (Methyle Chl nd ) ( g/L) 5 <1 0 10 14 3 1 20 7 24 8/3/2011 8/30/11 10 79 26 89 77 Q arte ly TDS (mg/L) 3284 19 3100 3270 3140 3310 3140 3020 3270 3190 3200 3190 3220 3160 Q arte ly G OSS Alph mm R & U (pCi/L) 4 69 NS 3 27 33 39 43 28 27 25 22 NS NS Q arteriy N tr te -1- N tnte (as N) (mg/L) 25 75 16 17 16 16 17 17 14 16 16 16 16 Q arte ly MW 30 (Clas n) Chl nd (mg/L) 128 1/10/11 NS 2/1/11 134 3/14/11 NS 4/11/2011 134 5/10/2011 128 6/20/2011 127 7/5/2011 127 8/3/2011 126 9/7/2011 145 10/4/2011 129 11/8/2011 122 12/12/2011 124 Quarte ly MW 30 (Clas n) F IdpH(SU) 65 8 5 1/10/11 6 65 2/1/11 6 96 3/14/11 7 10 4/11/2011 6 83 5/10/2011 67 6/20/2011 5 66 7/5/2011 6 65 8/3/2011 6 61 9/7/2011 6 80 10/4/2011 6 96 (6 73) 11/8/2011 6 83 12/12/2011 7 14 Q arte ly Uramum( g/L) 8 32 NS 5 97 NS 6 49 NS NS NS 8 NS 983 NS NS Q arte ly Selem m( g/L) 34 362 34 7 34 444 3»3 3«7 32 4 39 7 32 4 36 6 36 8 38 Quarte ly N tr te -1- N tnte (as N) (mg/L) 5 19 21 22 21 20 22 22 20 21 21 21 27 Q arte ly MW 31 (Clas TDS (mg/L) 1320 1/10/11 1240 2/1/11 1220 3/14/11 1250 4/1/2011 1370 5/10/2011 1290 6/20/2011 1330 7/5/2011 1280 8/2/2011 1300 9/6/2011 1300 10/3/2011 1320 11/8/2011 1290 12/12/2011 7330 Q arte ly ffl) Chl nd (mg/L) 143 1/10/11 NS 2/1/11 145 3/14/11 NS 4/1/2011 143 5/10/2011 143 6/20/2011 145 7/5/2011 148 8/2/2011 148 9/6/2011 148 10/3/2011 145 11/8/2011 145 12/12/2011 148 Quarte ly F IdpH(SU) 65 85 6 65 111 7 43 7 01 6 73 616 664 6 67 7 03 1 28 (7 34) 701 7 46 Q arte ly S If te (mg/L) 532 NS 538 531 503 512 540 532 537 541 53P 552 530 Q arte ly Mangan se( g/L) 200 NS NA 248 NS NA 369 NS NA NS NA 348 267 270 277 2»3 247 Q arteriy MW 35 (Clas n) Thalh m ( g/1) 05 NS NA <0 50 NS NA <0 50 NS NA NS NA NS 052 NS 057 ND 0 63 Q arte ly MW 35 (Clas n) Gro s Alpha rm s R & U (pCi/L) 3 75 NS NA 2/15/11 26 NS NA 6/7/2011 37 NS NA NS NA 7/20/11 NS 8/2/2011 45 9/7/11 NS 10/3/11 44 11/8/2011 47 12/14/11 42 Q arte ly Uram m ( g/L) 75 NS NA 12 7 NS NA 21 7 NS NA NS NA 242 183 22 3 201 24 23 6 Quarte ly Required Sem Annual Samphng Weils MW2(Clas m) G Alph mi Rn&U (pCi/L) 32 NS NA 1 1 NS NA 4/12/2011 1 2 NS NA NS NA NS NA 8/8/2011 05 NS NA 10/5/2011 1 3 NS NA NS NA S im Ann ally MW 3 (Clas ffl) Sel mum( g/L) 37 NS NA 405 NS NA 45 4 NS NA NS NA NS NA 46 NS NA 46 7 NS NA NS NA S im Ann ally MW 3 (Clas ffl) Feid pH(SU) 65 85 NS NA 2/15/11 609 NS NA 4/13/2011 646 NS NA NS NA NS NA 8/10/2011 632 NS NA 10/10/2011 6 53 (6 83) NS NA NS NA Semi Ann ally Fl nd (Mg/L) 0 68 NS NA 0 69 NS NA 0 68 NS NA NS NA NS NA 0 96 NS NA 091 NS NA NS NA S rm Ann ally MW 3A (Clas ffl) F IdpH(SU) 65 8 5 NS NA 6 05 NS NA 6 58 NS NA NS NA NS NA 619 NS NA 6 5 (6 92) NS NA NS NA Senu An ally MW 3A (Clas ffl) S If te (mg/L) 3640 NS NA 2/16/11 3730 NS NA 4/13/2011 3350 NS NA NS NA NS NA 8/11/2011 3560 NS NA 10/11/2011 3750 NS NA NS NA S mi Ann ally MW 3A (Clas ffl) TDS (mg/L) 5805 NS NA 2/16/11 5770 NS NA 4/13/2011 5720 NS NA NS NA NS NA 8/11/2011 5810 NS NA 10/11/2011 5630 NS NA NS NA Seim Ann ally Selem m( g/L) 89 NS NA 99 NS NA 85 8 NS NA NS NA NS NA 88 5 NS NA 95 NS NA NS NA S mi Ann ally MW 5 (Class 0) U am m ( g/L) 75 NS NA 2/14/11 295 NS NA 4/12/2011 7 16 NS NA NS NA NS NA 8/9/2011 05 NS NA ip/10/2011 4 52 NS NA NS NA Senu Ann ally MW 12 (Clas FeldpH (SU) 65 85 NS NA 2/15/11 643 NS NA 4/5/2011 6 67 NS NA NS NA NS NA 8/9/2011 613 NS NA 1 10/6/2011 ( 6 7 (6 97) NS NA NS NA Semi Ann ally ffl) Selem m( g/L) 25 NS NA 2/15/11 39 NS NA 4/5/2011 21 7 NS NA NS NA NS NA 8/9/2011 254 NS NA 1 10/6/2011 ( 354 NS NA NS NA S mi Ann ally MW 15 (Class m IT ( g/L) 81 7 NS NA NS NA NS NA 4/12/2011 <0 50 NS NA NS NA NS NA NS NA NS NA 10/10/2011 1 137 NS NA NS NA S mi Ann ally MW 18 (Clas ffl) Thall m( g/I) 1 95 NS NA 3 49 NS NA 3 74 NS NA NS NA NS NA 40 339 NS NA i 383 NS NA NS NA S mi Ann ally MW 18 (Clas ffl) S If te (mg/L) 1938 9 NS NA 2/15/11 1770 NS NA 4/6/2011 1780 NS NA NS NA NS NA 8/10/2011 1910 NS NA 1 10/11/2011 1 2020 NS NA NS NA S im Ann ally MW 18 (Clas ffl) F IdpH(SU) 6 25 8 5 NS NA 2/15/11 6 27 NS NA 4/6/2011 671 NS NA NS NA NS NA 9/21/11 5J>5 (630) NS NA 1 10/11/2011 1 6 55 (6 63) NS NA NS NA Semi Ann ally TDS (mg/L) 3198 77 NS NA 3250 NS NA 3250 NS NA NS NA NS NA 3190 NS NA 1 3220 NS NA NS NA Semi Ann ally Ql 2011 Res Its 02 2011 Results 03 2011 Res Its 04 2011 Results M ton g W II (W te Cia ) Constatuent E ceed ng GWCL GWCL n C e t GWDP Ja uary 2011 Mo thly Sample Date Ja uary 2011 Mo thiy Sample Result Ql 2011 S mple D te Ql 2011 R suit March 2011 Mo thiy SampI Date March 2011 Mo thiy Result Q2 2011 Sample D te Q2 2011 Result May 2011 M nthiy S mple Date May 2011 Mo thly Result J e2011 Mo thly S mpleDate Ju e2011 Mo thly Result J Iy2011 Mo thly SampI D te J Iy2011 Mo thly Result Q3 2011 Sampi D te Q3 2011 Res it Septembe 2011 Mo thly Sample D te Septembe 2011M thly Resuh Q4 2011 SampI Date CH2011 Result N mbe 2011 M thly S mple D te N embe 2011 Mo thly Result Decembe 2011 Mo thly Sample D te Decembe 2011 Monthly ResuU Sampi Freq en y Requ red S nu A ual S mph g W lis, co tm ed MW 19 (Class ffl) F IdpH(SU) 6 78 8 5 NS NA 2/21/2011 6 78 NS NA 4/5/2011 7 03 NS NA NS NA NS NA 7/20/3011 6 65 NS NA 1 10/12/2011 6 88 (7 02) NS NA NS NA Senu Ann ally MW 19 (Class ffl) N trate + N tnte (as N) (mg/L) 2 83 NS NA 2/21/2011 NS NS NA 4/5/2011 26 NS NA NS NA NS NA 7/20/3011 NS NS NA 1 10/12/2011 4 NS NA NS NA Senu Ann ally MW 23 (Clas ffl) F IdpH(SU) 6 5 8 5 NS NA 2/9/2011 613 NS NA 4/5/2011 7 14 NS NA NS NA NS NA 8/4/2011 638 NS NA 10/6/2011 6 56 (6 77) NS NA NS NA Senu Ann ally MW 23 (Clas ffl) Mangan ( g/L) 550 NS NA 2/9/2011 NS NS NA 4/5/2011 32 NS NA NS NA NS NA 8/4/2011 NS NS NA 10/6/2011 557 NS NA NS NA S mi Ann ally MW 24 (Clas ffl) Cadmi m ( g/L) 25 NS NA 2/10/2011 2 78 NS NA 4/5/2011 2 61 NS NA NS NA NS NA 8/4/2011 1 46 NS NA 10/11/2011 1 78 NS NA NS NA S nu Ann ally MW 24 (Clas ffl) Thall m( g/L) 1 NS NA 2/10/2011 142 NS NA 4/5/2011 107 NS NA NS NA NS NA 8/4/2011 <0 50 NS NA 10/11/2011 0 62 NS NA NS NA Senu Annually MW 24 (Clas ffl) F eld pH (S U ) 65 85 NS NA 2/10/2011 5 73 NS NA 4/5/2011 612 NS NA NS NA NS NA 8/4/2011 645 NS NA 10/11/2011 644 NS NA NS NA Senu Ann ally MW 27 (Clas III) N tr te -H N tnt (as N) (mg/L) 56 NS NA 2/9/2011 6 NS NA 4/5/2011 64 NS NA NS NA NS NA 8/8/2011 6 NS NA 10/5/2011 1 63 NS NA NS NA S mi Ann ally MW 27 (Clas III) Chlonde (mg/L) 38 NS NA 2/9/2011 46 NS NA 4/5/2011 43 NS NA NS NA NS NA 8/8/2011 43 NS NA 10/5/2011 1 44 NS NA NS NA Semi Ann ally MW 27 (Clas III) S If te (mg/L) 462 NS NA 2/9/2011 455 NS NA 4/5/2011 442 NS NA NS NA NS NA 8/8/2011 424 NS NA 10/5/2011 1 456 NS NA NS NA S mi Ann ally MW 27 (Clas III) F IdpH(SU) 65 85 NS NA 2/9/2011 671 NS NA 4/5/2011 6 79 NS NA NS NA NS NA 8/8/2011 639 NS NA 10/5/2011 1 7 17 (7 24) NS NA NS NA S im Ann ally MW 27 (Clas III) TDS (mg/L) 1075 NS NA 2/9/2011 1090 NS NA 4/5/2011 1190 NS NA NS NA NS NA 8/8/2011 1090 NS NA 10/5/2011 1 1110 NS NA NS NA Semi Ann ally MW 27 (Clas III) G s Alpha nu sR &U (pCi/L) 2 NS NA 2/9/2011 07 NS NA 4/5/2011 1 1 NS NA NS NA NS NA 8/8/2011 08 NS NA 10/5/2011 1 1 5 NS NA NS NA ^ mi Ann ally MW 28 (Class ffl) Chlonde (mg/L) 105 NS _NA 2/14/2011 114 NS NA 4/11/2011 109 NS NA NS NA NS NA 8/8/2011 105 NS NA 10/5/2011 743 NS NA NS NA S mi Annually MW 28 (Class ffl) FeldpH (SU) 61 85 NS NA 2/14/2011 569 NS NA 4/11/2011 601 NS NA NS NA NS NA 8/8/2011 5 78 NS NA 10/5/2011 607(6 11) NS NA NS NA S mi Ann aUy MW 29 (Clas ffl) IT ( g/L) 1869 NS NA NS NA NS NA 4/18/2011 3010 NS NA NS NA NS NA 8/9/2011 1080 NS NA 10/5/2011 1220 NS NA NS NA S nu Ann ally MW 29 (Clas ffl) F IdpH(SU) 6 46 8 5 NS NA NS NA NS NA 4/18/2011 645 NS NA NS NA NS NA 8/9/2011 620 NS NA 10/5/2011 6 52 NS NA NS NA S nu Ann ally MW 32 (Class ffl) G Alpha mi R &U (pCi/L) 3 33 NS NA 2/9/2011 1 5 NS NA 4/1/2011 46 NS NA NS NA NS NA 8/2/2011 8/30/11 1 9 NS NA 10/3/2011 37 NS NA NS NA S mi Ann ally MW 32 (Class ffl) F IdpH(SU) 64 85 NS NA 2/9/2011 599 NS NA 4/1/2011 614 NS NA NS NA NS NA 8/2/2011 8/30/11 610 NS NA 10/3/2011 <f35 NS NA NS NA S im Ann ally Note GW(X al saretak fomJlyl4 2011 rso fGWDP NS = NotReq ired and Not Sampled NR-Req ired and Not Reported NA = Not Appl cabl E ceedan are show yell w Val es n () parentheses are the f eld pH m asu em ts fo the ampled analyses