Loading...
HomeMy WebLinkAboutDRC-2011-007774 - 0901a068802a51ee7'^^':^i^^'zx State of Utah GARY R. HERBERT Governor GREG BELL Lieutenant Governor Department of Environmental Quality Amanda Smith Executive Director DIVISION OF RADIATION CONTROL Rusty Lundberg Director 11-007 DRC-2011-007774 October 31, 2011 Ms. Jd Ann Tischler Director, Compliance and Permitting Denison Mines (USA) Corporation (DUSA) 1050 17*^ Street, Suite 950 Denver, CO 80265 Dear Ms. Tischler: SUBJECT: August 9-10, 2011 DUSA 2011 BAT/DMT Inspection; Engineering Inspection Module 75E; Findings and Closeout An inspection on the subject was held on August 9-10, 2011 at the DUSA mill facilities near Blanding, Utah. Mr. David Rupp represented DRC, Messrs. Ryan Palmer and Daniel Hillsten represented DUSA. A brief discussion of the references and findings of the inspection follow below: Findings and Discussion: No new problems were identified. All facilities appear to be functioning in accordance with the current DMT/BAT requirements, except as separately identified in current DRC documented actions. Therefore, the 2011 DMT/BAT Inspection Module 75E is hereby closed-out. Please contact Mr. David Rupp of DRC, if you have any questions on the above. UTAH RADIATION CONTROL BOARD DAR:dr Craig W. Jones, A6<i^g Executive Secretary AZ F:\DUSA\ lnspections\DMT&BAT\201 IMnspection Closeout Ltr 10-11.doc 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144850 • Salt Lake City, UT 84114-4850 Telephone (801) 536-4250 • Fax (801) 5.33-4097 • T.D.D. (801) 536-4414 www.deq.utah.gov Printed on 100% recycled paper State of Utah GARY R. HERBERT Governor GREG BELL Lieutenant Governor !partmentof Environmental Quality Amanda Smith Executive Director DIVISION OF RADIATION CONTROL Dane L. Finerfrock Director MEMORANDUM TO: FROM: DATE: SUBJECT: File Dave Rupp ^X^^P"^.^ Licensing and Permitting Section October 20, 2011 DUSA 2011 BAT/DMT Inspection; Engineering Inspection Module 75E; Findings and Closeout An inspection on the subject was held on August 9-10, 2011 at the DUSA mill facilities near Blanding, Utah. Mr. David Rupp represented DRC, Messrs. Ryan Palmer and Daniel Hillsten represented DUSA. A brief discussion of the references and findings of the inspection follow Below: References: A. Photos 8-9-ll and,8-10-ll atDUSAbyD.A. Rupp(attached). B. Copy of a record of an Interview with R. Palmer, 8-10-11 (attached). Findings and Discussion: No new problems were identified. All facilities appear to be functioning in accordance with the current DMT/BAT requirements, except as identified in current DRC documentation. The captioned photographs in reference (A) show acceptable events occurring at the tailings cells and mill area. The record of the interview in reference (B) was obtained during the inspection. However, the interview information has been included with the documentation of two other separate DRC actions. One action involves non-measurement of the water level in Cell 4B (sfill under DRC review). The other action has been resolved by an NOED dated September 22, 2011, and involved data logging problems for the LDS in Cell 4A. Both these events are documented in DRC files. END Attachments F:\DUSA\Insps\2011 MEMO BAT-DMT 10-11.doc 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144850 • Salt Lake City, UT 84114-4850 Telephone (801) 536-4250 • Fax (801) 533-4097 • T.D.D. (801) 536-4414 www.deq.ulnh.liov Printed on lOO'/r recycled piiper Photos 8-9-11 and 8-10-11 at DUSA bv D.A. Rupp f^:\ pkoth'^'9'l}' -7 4frr ey^^l»jiuZt(r:^ Cell 43 Access to monitonng well on south dike of Cell 43. Loose soils on top of compacted dike soils. Cell 3. Covering cell on west side, lliU width with imported cover. Cell 4B "porpoising" on circumference of water level. Freeboard at C3 spillway. About 4-feet. C3 New LDS Output Panel. Ron Nieves ready to scan some material N. feedstock fence. 4-feet on cover on rt. <ai south side Cell 2 Standpipe extensions to Slimes Drain foreground. Next ext. to LDS for C 2 in background. Page 2 Discharge Line fi-om C2 Slimes Drain. Note flow and totalizing meter above. Discharge Line fi'om C2 Slimes Drain, daylighting on N. dike of C3. Cell 3 and C2 could potentially be somewhat hydraulically interconnectec^y ''^:Z'Z:.::':^^Zm:i'Zir^^:..,rrr --.• >A;i;:Z^Z'Z:Z r^-mz? <:•- -Z^Z^ r/'^-irZ'-^ smm^ xm • ^z'4 •:<"'>rrr^ >:•,;.-....; ^Y.;'^;;;. -.^isvjft^li^ •'•^rf'Z-'^>. '' .' • -'^^\.p'" \.i,%,' i^^;-. Setup of new LDS for Cl, Flash picture shot of Slimes Drain standpipe for C2. R.Palmer stated there is no change in the diameter of discharge line. 7'. '' :': ••^:^ZZ:''Z-r^''^ y.z:XXXZ: C2 LDS blowpipe standpipe raised 4-feet. Light soil indicates site of former C2 to C3 spillway. (f These two photos show Settlement Monitor sta. no. 2W4-N. The 4' cover on C2 loosely filled around the Settlement Monitors. Bollards were located to the surface. Two photos ofthe walkway down to the water level at Cell ,4B. N.B., the walkway is on a rub sheet. ,J^^1UY^^^-Z^ ^ ff)L^ \t, veU ib^ \^\ ^^j^<>^ ' {1 t' 4g ^vi-<t-. c&yr^^U^v 'ym- 1 ?:? i.? 44- 44- ri —1-4 r