Loading...
HomeMy WebLinkAboutDRC-2011-001510 - 0901a068801fbcb5State of Utah GARY R. HERBERT Governor GREG BELL Lieutenant Govemor January 27, 2011 Departmentof DRC- 2011- 00 1 Environmental Quality Amanda Smith Executive Director DIVISION OF RADIATION CONTROL Rusty Lundberg Director Certified Mail (Retum Receipt Requested) Mr. Harold R. Roberts Vice President, US Operations Denison Mines (USA) Corp (DUSA) 1050 17* Street, Suite 950 Denver, CO 80265 Dear Mr. Roberts: SUBJECT: January 27, 2011, 4:39 p.m. Email from Geosyntec Consultants, regarding Denison Mines Cell 4B - CQA Report Addendum; DUSA CeU 4B Construction Quality Assurance [CQA] Report; Cell 4B CQA Report Approval Please note the following references: 1. The subject January 27, 2011, 4:39 p.m. Email from Geosyntec Consultants, transmitting a Geosyntec Consultants response letter of the same date, known to DRC as CQA Report addendum No. 3 to the subject CQA Report. This letter contains construction work clarifications and is certified by Mr. Greg T. Corcoran, a Registered Professional Engineer in the state of Utah. 2. January 27, 2011, 2:00 pm. telephone conversation between Messrs. Greg Corcoran of Geosyntec Consultants and David Rupp of the DRC. 3. January 27, 2011, 12:39 p.m. DRC Email to DUSA conunenting on the subject CQA Report. 4. January 27, 2011, 10:04 a.m. Geosyntec Consultants Email to DRC conveying a Geosyntec Consultants response LeUer of the same date, known to DRC as CQA Report addendum No. 2. This information is also certified as reference no. 1 above. ^ 5. January 25, 2011 DRC Letter, Request for Information on the subject CQA Report and addendum No.l. 6. January 21, 2011 Geosyntec Consultants Letter, known to DRC as CQA Report addendum No. 1. This information is also certified as reference 1 above. 7. January 20, 2011 DRC Letter, Request for Information on the subject CQA Report. 8. November 30, 2011 DUSA Cell 4B CQA Report, prepared by Geosyntec Consultants, Volumes I through III. We received and reviewed the subject information noted in references 1, 4, 6, and 8 above. DRC provided comments and requests for information per items 2, 3, 5, and 7 above. After review ofthe subject Email as described in reference 1, we have no further comments. Therefore we hereby approve the Cell 4B Construction Quality Assurance [CQA] Report, including addendums 1 through 3 as described in references 1, 4, and 6 above. 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144850 • Salt Lake City, UT 84114-4850 Telephone (801) 536-4250 • Fax (801) 533-4097 • T.D.D. (801) 536-4414 www.deq.utah.gov Printed on 100% recycled paper Page 2 If you have questions on this approval, please contact Mr. Rupp of my staff UTAH RADL\TION CONTROL BOARD Rusty LundbergTExecutive Secretary DAR:dr Cc: Harold R. Roberts, V.P. US Operations Greg Corcoran, GeoSyntec Consultants F:\C4BConstr\CQA RptApproval 01-201 l.doc