Loading...
HomeMy WebLinkAboutDRC-2011-001149 - 0901a068801f513eState of Utah GARY R. HERBERT Govemor GREG BELL Ueulenant Governor Department of Enviroimiental Quality Amanda Smith Executive Director DIVISION OF RADIATION CONTROL Rusty Lundberg Director DRC-2011-00114 January 13, 2010 Mr. Harold Roberts Executive Vice President, U.S. Operations Denison Mines (USA) Corp. 1050 Street, Suite 950 Denver, CO 80265 Re: January 13, 2010 Variance Request Regarding Tailings Cell 4A Freeboard Limit: Conditional Approval. Dear Mr. Roberts, We acknowledge a January 6, 2011 telephone conversation we had with you regarding rising wastewater levels in Tailings Cell 4A, while you await Division review findings on construction of Tail ings Cell 4B. Both parties recognize that upon approval of Cell 4B, that any freeboard limit exceedance will be resolved as wastewater flows over the spillway constructed between Cells 4A and 4B. During the January 6, 2011 call, the Division had agreed to exercise enforcement discretion for limited time regarding excess Cell 4A wastewater level conditions. We acknowledge that Cell 4B has been constructed, that DUSA has submitted several required documents to the Division that are currently under Division review, including: 1) the final as-built report for Cell 4B, 2) operational and maintenance procedures for the new cell, and 3) revisions to the existing reclamation plan to address future Cell 4B closure. In addition, the Division is awaiting submission of evidence of adequate surety, of which you informed us today would be submitted next week. We understand the exigent conditions involved in tailings fluid management during the period the Division reviews the documents mentioned above. We also recognize your telephone request today, where you asked for a written variance to the Cell 4A freeboard limit. We also recognize receipt of the following DUSA email documents: January 13, 2011 (8:02 am) - providing recent Cell 4A freeboard measurements. Included in this email was information that the freeboard was exceeded sometime between January 7 and 10, 2011, and that as of this moming, the wastewater level was 21 inches below the spillway to Cell 4B. January 13, 2011 (11:42 am) - including a formal request for written variance regarding 195 North 1950 West • Salt Uke City, UT Mailing Address: P.O. Box 144850 • SaU Uke City, UT 84114-4850 Telephone(801) 536-4250-Fax(801) 533^097 'T.D.D. (801)536-4414 www.deq.utalt.gov Printed on 100% recycled paper Page 2 the excess Cell 4A wastewater levels This letter constitutes conditional approval of variance to the Cell 4A wastewater freeboard limit, subject to the following conditions: 1. Discharge of any tailings solids or wastewater into Cell 4B is prohibited before DUSA receipt of written Division approval. 2. DUSA will continue to make daily wastewater level measurements in Cell 4A, and report these to Division staff via email on a daily basis. 3. This variance shall expire on March 1, 2011. If you have any questions regarding the terms of this variance approval, please contact Loren Morton of my staff at 801-536-4262. UTAH WATER QUALITY BOARD Rusty Lundberg Co-Executive Secretary RL/LM:lm F:\...\CelI 4A Freeboard Variance.doc File: DUSA GW Permit, Cell 4B