Loading...
HomeMy WebLinkAboutDRC-2010-005578 - 0901a068801cd722DRC-2010-00557B Department of Environmental Quality Amanda Smith Execulive Direcior DIVISION OF RADIATION CONTROL Rusty Lundberg Director State of Utah GARY R. HERBERT Governor GREG BELL , Lieutenant Governor October 11,2010 Certified Mail (Retum Receipt Requested) Ms. Jo Ann Tischler Director, Compliance and Permitting Denison Mines (USA) Corp (DUSA) , 1050 17* Street, Suite 950 Denver, CO 80265 Dear Ms. Tischler: SUBJECT: September 2, 2010 DUSA Response Letter, White Mesa Uranium Mill- New Decontamination Pad [NDP]; the Proposed White Mesa Mill Tailings Management System and Discharge Minimization Technology (DMT)Monitoring Plan (DMT Plan), 9/70 Revision: Denison-10. ]; the Proposed Cell 4A BAT Monitoring, Operations, and Maintenance Plan (Cell 4A O&M Plan), 8/10 Revision Denison 1.6; the May 10, 2009 [2010] DRC Letter on the NDP: Comprehensive Comnients on the Proposed Revised DMT Plan and the Proposed Revised Cell 4A O&M Plan, which include revisions for the NDP and other items. We have reviewed the subject response letter from DUSA dated September 2, 2010. This letter was written in response to our request for information regarding the New Decontamination Pad (NDP) dated May 10, 2009 (actual date was May 10, 2010). You make reference to a DUSA submittal letter, dated August 4, 2010, that contains infonnation pertaining to the NDP. We located two letters from DUSA to DRC with that same date. In the discussion that follows, the DUSA letter of that date, containing information related to the NDP, will be referred to as the August 4, 2010-A letter. We also acknowledge that in your September 2, 2010 letter you request that the DRC ignore the DMT Plan (Revision 10.0) included in the DUSA August 4, 2010-A letter, therefore, our review of the DMT Plan Revision 10.0 document has ceased. However, our review has continued on a separate document in the August 4, 2010-A letter, i.e., the subject Cell 4A O&M Plan, 8/10 Revision Denison 1.6. Our comments on that document are given later in this letter. Our letter of March 30, 2010 is our last known DRC approval of revised DMT and Cell 4A O&M Plans. It approved DMT and Cell 4A O&M Plan revisions, separately known as 3/10 Revision: Denison-7, and revision 3/10 Revision Denison 1.4, respectively. Contingencv Plan (Revision 3) In the subject September 2, 2010 letter, DUSA provided a proposed Revision 3 of the Contingency Plan. This was provided in response to our subject comment letter of May 10, 2010. However, our response 195 North 1950 West • Salt Lake City, UT Mailing Address; P.O. Box 144850 • SaJt Lake City, UT 84114-4850 Telephone (801) 536-4250-Fax (801) 533^097'T.D.D. (801)536-4414 www.deq.ittah.gov Printed on 1(X)% recycled paper Page 2 regarding the Contingency Plan will not be addressed in this letter, but will be addressed under separate cover. Review of that plan will proceed independently, and will not be tied to the use of the NDP. For reference, the third paragraph and Section 2.a.l of the subject September 2, 2010 DUSA letter specifically address the contingency plan comments in our May 10, 2010 letter. We have several comments on the Proposed DMT Plan and Cell 4A O&M Plan, as follows: Comments on the Proposed DMT Plan (Revision 10.1, refer to the black-line copy): 1. Paragraph 3. l.e.i.D. The end of the third sentence should be changed to read, ". .. standing water shall not be less than 6.2 feet." 2. On page 28 of 48 in Appendix A, entries: a. Item numbered as one on that page should state Pond and Beach elevations (as per approved DMT Plan 3/10 Revision: Denison-7). b. For Cell 3 should be deleted (as per approved DMT Plan 3/10 Revision: Denison-7). c. For Cell 4A an item (d) should be added (per the foregoing reference). 3. Per our letter dated April 29, 2010, comment two, where we previously requested that in Appendix A of the DMT Plan, Table 11. Operational Systems, that a line be added in the table for any observable FML liner damage at any disposal cell. Please add this line. 4. For reference, on page 34 of 48 the bottom two new paragraphs of the black-line copy regard storm water. The record of these storm water related inspection items will need to be available for the annual storm water inspections held at the mill. Comments on the Proposed Cell 4A O&M Plan (Revision 1.6): A. The list of Attachments on the last page of this plan needs to be revised. It does not include the revisions for this page, which were proposed in the versions submitted in the DUSA letters of December 11, 2008 and May 26, 2009, Please update and complete. B. The actual attachments need to be included with the proposed plan. This would be a change to the attachments included with the current approved version. Cell 4A O&M Plan 3/10 Revision Denison 1.4. Please submit. Please review the above comments, and submit the requested information. Please include complete final copies of the revised subject plans, given new and unique version numbers. Per your email of October 11, 2010, you committed that DUSA would fully respond to the above with 30 days of receipt of this letter. If you have any questions on the above, please contact me. Sincerely, David A. Rupp, P.E Geotechnical Services DAR: dr Cc: Harold R. Roberts, DUSA Phillip Goble, DRC F:\DUSA\ GWDPermil\NDP\Fnl Cmtsl0-2010.doc