Loading...
HomeMy WebLinkAboutDRC-2010-001803 - 0901a068801698e7State of Utah GARY R. HERBERT Govemor GREG BELL Lieutenant Govemor Department of Environmental Quality Amanda Smith Executive Director DFVISION OF RADL\TION CONTROL Dane L. Finerfrock Director DRC-2010-001 February 3, 2010 CERTIFIED MAIL (Return Receipt Requested) David C. Frydenlund Vice President and General Counsel Denison Mines (USA) Corp. (DUSA) 1050 Seventeenth Street, Suite 950 Denver, CO 80265 Dear Mr. Frydenlund: SUBJECT: January 14, 2010 DUSA Response Letter; November 25, 2009 DRC Request for Information (RFI) on Engineering Inspection Module 75E; Response Review and Request for Information We received your letter dated January 14, 2010 subject as above. We have reviewed the information submitted, as discussed below: 1. Attachment 1 of the subject DUSA letter provides two photographs of installation of a mb sheet beneath the recycle pipe at the top of the southwest comer of Cell 4A, as requested by our subject letter of November 25, 2009. These photos appear satisfactory. 2. Attachment 2 shows a proposed change to an excerpt of the 4A BAT Monitoring, Operations and Maintenance Plan (O&M Plan) on page 3 of the plan, as recommended by our letter of November 25, 2009. The change adds an item g, which states, "g) Rub Protection Sheets - In addition to the splash pads described in f) above, mb sheets are installed beneath all piping entering or exiting Cell 4A that is not located directly on the splash pads." Former item g, is also changed, to be item h in the plan. It appears this change satisfies our recommendation, that the O&M Plan be modified to require all pipelines entering or leaving Cell 4A be maintained with a mb sheet beneath them. 168 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144850 • Salt Lake City, UT 84114-4850 Telephone (801) 536-4250 • Fax (801) 533-4097 -T.D.D. (801) 536-4414 www.deq.utah.gov Printed on \t)Q% recycled paper Mr. David Frydenlund February 3, 2010 Page 2 3. Attachment 3 shows a proposed change to an excerpt of the DMT Plan, paragraph 3.3 (page 10), as recommended by our letter of November 25, 2009. This change adds an item b, to the paragraph which states, "b) a 4 ft. buffer is maintained at the periphery of the storage area which is absent bulk material in order to assure that the materials do not encroach upon the boundary of the storage area: and" Former item b, in paragraph 3.3 is also changed, to be item c in this paragraph of the DMT Plan. It appears this change satisfies our recommendation that DUSA establish minimum distances between the feedstock storage fence and feedstock materials. 4. Attachment 4 shows a proposed change to an excerpt of the DMT Plan, paragraph 2.1 .p (page 3). This change is proposed by DUSA to alert mill staff to reporting requirements of Ground Water Discharge Permit in Parts I.D.6 and I.G.3., with respect to the leak detection system in Cell 4A. This change adds the following sentence to paragraph 2.1.p: "In addition, the requirement to notify the Executive Secretary in accordance with Parts I.D.6 and I.G.3 of the Groundwater Discharge Permit must be adhered to when the solution level trigger for Cell 4A has been exceeded." This change is acceptable. The above proposed changes to the O&M and DMT Plans are acceptable. We request complete copies of the revised plans, including the proposed changes above, be submitted for final review and approval. Copies of these plans must incorporate new revision numbers for the plans. From a telephone message left to you on this subject by Mr. David Rupp on February 2, 2010, you committed by email the same date that DUSA will provide the requested copies of these plans, as noted above, to DRC within 45-calendar days of receipt ofthis letter. If you have any questions on the above, please contact Mr. Rupp. UTAH RADL^TION CONTROL BOARD Dane L. Finerwock, Executive Secretary DLF/ DAR: dr F:\DUSA\ lnspections\ DMT& BAT>i2009\RF12 Feb-04-I0.doc Page 1 of 1 Sonja Robinson - Response time f#.3Sioa¥i-.' •.••• •.B".atsissi^»ir-;'i*s?s-:s;>.vJ'rJ3KTe«Di:\, ' •.sss&w,m:^ss&^ From: David Frydenlund <DFrydenlund(gdenisonmines.com> TO: "dmpp(gutah.gov" <dmpp(gutah.gov> Date: 2/2/2010 2:15 PM Subject: Response time Dave, Further to your voice mail, we should be able to respond to the letter you referred to within 45 days after receipt ofthe letter. Dave David Frydenlund Vice President, Regulatory Affairs and Counsel t: (303) 389-4130 | f: (303) 389-4125 1050 17th Street, Suite 950, Denver, CO 80265 DENISON MINES (USA) CORP www.denisonmines.com This e-mail is intended for exclusive use the person(s) mentioned as the recipient(s). This message and any attached files with it are confidential and may contain privileged or proprietary information. If you are not the intended recipient(s) please delete this message and notify the sender. You may not use, distribute print or copy this message if you are not the intended recipient(s). file://C:\Documents and Settings\Sdrobinson\Local Settings\Temp\XPgrpwise\4B6925ECE... 2/4/2010