Loading...
HomeMy WebLinkAboutDRC-2009-004005 - 0901a06880140824^^c-myvcci^co'b MINIS- Denison Mines (USA) Corp. 105017th Street, Sulla 6$0 Denver, CO 80266 USA Tal :-303"«28-77fl8 Fax: 303 369-4126 www.denl8onmlnes.com Facsimile Transmittal To: OAJO<:> (^opp Fax No. Company: ^ t^ V^ Q. Date: 9-/- d ? From : ^V^J^ I^CKJ^^-J^I O-O Page 1 of: Re: QLGJ^^ ^S^Cy^ 0 \AA?V \Z^^>p<^^'^ Jh 11 SEP 2009 ,^, ST/T:a6ed 0SSb9EST08T6-.oi bSll S3NIW NOSIN3a:'^o-^J 82:ST 6005-T0-d3S White Mesa Uranium Mill DMT Performance Standard Monitoring Report StateofUtah i§ SEP 2nQ9 • ^; Ch-oundwaler Discharge Permit No. UGW370004 V^. P.'ftS ^'', ^'^ 2- Quarier vj:^'---o. C0...0/ ^^.^/ April through June \^... .CSV -f ^, 2000 :::(u.Si.^i> Prepared By: Deni.son Mines (USA) Corp. 1050 i7ih Street, Suite 9.50 Denver. CO. 80265 September 1, 2009 2Txa:36ed 0S3b9£:3T0aT6 = ^l : USH S3NIW NOSINSQ :LUO Jj 8B:ST 600S-T0-d3S DMT PERFORMANCE STANDARD MONITORING REPORT 1.0 Mt^asurements Taken During the Quarter During the Quarter, thc folluvving DMT Monitoring was performed nr adclrcsscd, as required under Pan. T.E.6 of the Permit: -Weekly tailings wastewater pool elevations for tailings (.Iclls 1,3 and 4A; -Monthly slimes drain water levels; -Weekly wastewater level measurements m Robcrt'.s Pond; atid -Weekly feedstock storage area inspections. 2.0 Weekly Tailings Waste Water Pool Elevation Monitorins Mill personnel monitored and recorded weekly the elevation of wastewater in Tailings Cells 1, 3 and 4A lo ensure compliance with the maximum wastewater elevation criteria mandated by Condition 10.3 of the Mill's Radioaclive Materials License. These measurements were made from an elevation survey. The results of such monitoring, reported as feet above me^Hu sea level (frnsl), arc included in Attachment A, Condition 10.3 ofthe Mill's Radioactive Materials License provides that freeboard limits for Cells 1 and 3 shall be set in accordance with procedures thai have been approved by thc U.S. Nuclear Regulatory Commission. Llnder those procedures: (i) The freeboard limits are set as per thc January 10. 1990 Drainage Report for Cell I at a liquid maximum elevation of .5,615.4 fmsl; and (ii) The freeboard limit for Cell 3 is determined armually using a toimula scl out in the procedure. The current freeboard liinit for Cell 3 was previously calculated under this procedure at 5,601.6 fmsl. However, in UDEQ correspondence dated November 20, 2008 an interim variance and liniii was established at 5,602.5 fmsl. (iii) In conjunction with the variance established under (ii) above, an interim maximum elevation for Cel 14A was also established at 5,593.74 In addition. Part LD.2 of the Permit provides that under no circumstances shall die freeboard of any tailings cell bc less than three feel, a.s measured from the top of the flexible membrane liner ("FML"). The top of the FML in Cell 1 is at 5,618.5 fmsl and lhe top of the FML in Cell 3 is at 5,608.5 fmsl. This means thai the maximum wastewater pool elevations in Cells 1 and 3 permitted under Pan LD.2 of the Permit are 5,615.5 and 5,605.5 fmsl, respectively. As indicated in lhe table below, thc wasle water pool elevations in Cells 1 and 3, as measured during thc Quarter, did not exceed these regulatory .standards: 2T/£:36ed 0S2l79£ST0aT6: oi . bSfl S3NIW N0SIN3a :"JOJJ ' 82:ST 600S-T0-d3S Table J • Summary of Wa.«;te Water Pool Elevations Tailinj^s Cell Cel Cell 3 Cell 4A Maximum Wastewater E)leviition Measured During the Quarter (fm.sl) 5.612.23 5,600.68 5,590.14 Maximum Wastewater Klevation Permitted Under Liccn.se Condition 10.3 (fmsl) 5615.4 5.602.5 Maximum Wastewater l^leyation Permitted Under Part l.D.2 of the Permit (fmsl) 5,615.5 5.605.5 5593.74 Note: Interim ma.ximum clevaiions of 5.602,5 fmsl and 5,593.74 fmsl for Cells 3 and 4A, respectively have been established in correspondence from UDEQ dated November 20, 2008. Thc maximum elevation of 5,593.74 fmsl for Cell 4A has been set assuming diat the total PMP volume for Cells 2, 3 and 4A will be accommodated in Cell 4A. By letter dated December 11, 2008 Denison applied for an amendment to ils Radioactive Materials License to set tlie freeboard limit for Cell 4A al 5,593.74 fmsl and to eliminate the need to set a freeboard limit for Cell 3, given that the freeboard limit of 5,593.74 fmsl for Cell 4A is .idcLjuate to accommodate the total PMP volume for CelLs 2. 3 and 4A, 3.0 Monthly Slimes Drain Waler Level Monitoring Pursuant to Patt 1.F.2 of the Groundwater Discharge Permit and correspondence from the UDEQ dated February 7, 2008, the rcsulls of monthly recovery monitoring of the slimes drain for Cell 2 are to be recorded and included with the resulrs of cjuarlerly monitoring in the Quarterly Report. In accordance with these requiremenis, the monthly readings and a graph showing the initial reading and thc final reading for each monlh are included as Attachment B. These readings are to be collected during a 90 hour recovery period aftei' the slimes drain pump has been turned off iri order to delennine the static water level in die drain (head) after this short cessation in pumping. In Part l.E.6.b) of tlie Permit this requirement shall apply to Cell 3 only upon initiation of tailings de- watering operations. As Tailings Cell 3 is currently an active tailings cell and de-watering operations have not commenced, no such measurements will be made in lhe slimes drain access pipe for Cell 3 in the foreseeable future. 4.0 Weekly Wasiewater Level Monitoring: Roberts Pond Mill personnel monitored and recorded weekly, commencing on March 8, 2005, the effective date of thc Permit, the wastewater levels at Roberts Pond to detemiine compliance with the DMT operations standards in Pari LD.3. uf the Pennil. Fait I .D.3 of the Pennit provides that the water level in Robcn's Pond shall not exceed an elevation of 5624 fmsl. Thc results of such monitoring, reported as feet above mean sea level (fmsl), 3T.xb:36ed 0S3b9£ST0ST6:oi bSn S3NIW N0SIN3a:"Jo-i3 63= ST 600S-T0-d3S The maximum wastewater elevation measured in Robcii's Pond during the quarter was 5620:56 fmsl which did not exceed the maximum permitted elevation of 5,624 fmsl. 5.0 Weekly Feedstock Storage Area Inspection Weekly feedstock storage area inspections wcrc performed by the Radiation Safety Department, coimncncing on March 8, 2005, the effective dale of the Pentiit, to confirm that the bulk feedstock materials are stored and mainuiined within the defined area described in the Permit and that all alternate feedstock localed outside the defined feedstock area arc maintained within water light containers. The results of these inspections are recorded on thc Weekly Mill Inspection Forms, which are available at the Mill for inspection. No variance in stored materials from this requirement or leaking alternate feedstock drums or other alternate feedstock containers were observed during the inspections. 6.0 Signature and Certification This document was prepared by Denison Mines (USA) Corp. on September 1, 2009. Denison Mines (USA) Corp. By: David C. Frydenlund - Vice President, Regulatory affairs and Counsel Certificarion: T certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance widi a system designed to assure thai qualified persomiel properly gather and evaluate the information submitted. Based cm my inquiry of the person or persons who manage the system, or those persons directly responsible Ibr gathering the information, the udbnnaiion submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false infomiation, including the possibihty of fine and imprisonment or knowing violations. Dappwl CTFrydcnlund Vice President, Regulatory affairs and Counsel Denison Mines (USA) Corp. 2X/S:36ed 0SSt79£ST08T6: oi bSR S3NIW N0SIN3a:"'o-^J 6S:ST 6008-T0-d3S Attachment A aT/-9:36ed 0SSb9£ST08T6: ^1 bSR S3NIW N0SIN3a :*^o JJ GE-Ql 6003-T0-d3S Tailings Pond Elevations 2nd Quarter Elevations Date Free Board 4/3/2009 4/10/2009 4/17/2009 4/24/2009 5/1/2009 5/8/2009 5/15/2009 5/22/2009 5/29/2009 6/5/2009 6/12/2009 6/19/2009 6/26/2009 CelM 5615.40 5612.2 5612.14 5612.23 5612 5611.86 5611.84 5611.67 5611.51 5611.48 5611.4 5611.27 5611.14 5611,05 Cells 5601.60 5600.58 5600.43 5600.51 560068 5600.4 5600.55 5600,47 5600.38 5600.45 5600.36 5600.34 5600.27 5600.1 Roberts Pond 5624.00 5618.07 5618.05 5618.23 5620.56 5618.66 561884 5618.34 5618.56 Dry Dry Dry Dry Dry Cell 4A 5593.74 5588.4 5588.32 5588.44 5588.21 5588.24 5588.72 5588.77 5589.38 5590.02 5590.14 5590.11 5590.05 5589.86 ST/A:3S^d 0S3b9£ST08T6:oi bSn S3NIW N0SIN3a:«^o-Jd 63=ST 6003-T0-d3S MONTHLY HEAD MEASUREMENT TEST Location; Slime 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 Comments s Cell #2 4/20/2009 4/21/2009 16.79 15.44 16.73 15.4 16.65 15,37 16.6 15.31 16.58 15.27 16.51 15.74 16.4 15.18 T6.32 15.1 16.27 15.04 Date: Sampler: 4/27./2009 14,43 14.41 14.39 14.35 14.32 14.28 14.22 14.17 14.14 : Start number was low because over power was cut to the tailings area for some high voltag* stopped th 4/27/2Q09 4/23/2009 72- 13.66 liJ.54 13.63 33.6 • 13.57 1.3.53 13.49 13,44 13.41 Ryan Palmer 4/24/2009 13.05 13.04 13.01 12.99 12.98 12.95 12.92 12.89 12.85 4/27 the weekend of april 18th and 19th ! repair work. This power outage e pump from working on the slimes drain. When they turned the power back /2009 11.98 11.98 1L9S on the breaker was tripped leaving pump off until the ivionthly head test was started Monday th report num e 20th of april. After completetion of test the pump was turned back on. The ber is going to be 11.98. ElyQ-.s&ed 0S3b9£:ST08Te:oi bSn S3NIW N0SIN3a:"JO~<d 63:21; 6003-T0-d3S MONTHLY HEAD MEASUREMENT TEST Location: Slimes 600 700 . 800 900 1000 1100 1200 1300 1400 1500 1600 Comments: Cell li 2 5^5/2009 11.28 11.28 11.28 11.27 11.27 11,24 11.23 11.22 11.19 5/16/2009 11.11 11.11 11.11 11.11 11.11 .11.11 11.11 11.08 11.06 Test was started mid week Dale: Sampler: 5/17/2009 11 11 10.99 10.97 10.97 10.95 10.95 10.94 10.91 5/20/2009 5/18/2009 10.74 10.74 10.74 10.74 10.72 10.7 10.68 10.66 10.63 Tanner Holliday 5/19/2009 .'5/20/2009 I'W 10.52 10.28 10.51 10,28 10.5 10.28 10.49 10.48 10.45 10.42 10.41 10.38 so repairs could be made to the slimes pump. Environmental staff worked thorugh weekend on other projects, so they recorded the slimes information as well. . 2X/6:a&^d 0S3b9£ST08T6:oi bSn S3NIW NOSIN3a:>^o^d 63:ST 6003-T0-d3S MONTHLY HEAD MEASUREMENT TEST Location: Date; 6/22/2009 Slimes Cell # 2 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 Comments the slimes 6/15/2009 25.16 25.52 24,77 24.05 23.59 Sampler: 6/16/2009 6/17/2009 ^ 19,39 16.75 19.2 1S.7 19.03 16.68 18.84 16.62 18.72 i^ 1G.56 18.55 16.49 18.41 16.41 18.25 16.34 18.05 15.24 Tanner Holliday Ryan Palmer G/18/20O9 6/19/2009 6/20/2009 15.46 l.S.aj 15.38 15.35 •il 15.29 ^t 15.;i6 15.2 15.15 15.1 14.62 13.62 14.61 14.58 14.55 14.52 i(UO 14.47 14.44 14.4 14.35 i During down time the gasket was replaced on the flange just outside pipe. The report number will be 13.00 ' G/22/2009 13.00 13.00 1^^ 13.00 13.00 3T/0T:36ed 0S3t79£:ST08T6:oi bSfl S3NIW mSIN3a:"J9~'d QC-'ST 6003-T0-d3S Auachment B 3T^TT:a6ed 0S3t'9£ST0ST6:oi bSn S3NIUI N0SIN3a:Luo-'d 0£::ST 6003-T0-d3S •Final Reading -Intlial Reading J" <^ J" -.^ J' v^ ^ .^ .!^ .»* ^ 5^ ^ 5^ S? v^vv ^-^v'^*" v^w ^^^<'^°vvv 3T^ST:a6^d 0S3t79£ST08T6:oi bSn S3^^IIN NOSIN3a:^woJd 0£:ST 6003-T0-d3S