HomeMy WebLinkAboutDRC-2009-003805 - 0901a06880137eb4State of Utah
GARY R. HERBERT
Governor
Department of
Environmental Quality
Amanda Smith
Acting Executive Director
Drv IS ION OF RADIATION CONTROL
Dane L. Finerfrock
Director
r^c-^ocf/^cvs'^^S
August 26, 2009
Mr. Steven Landau
Environmental Manager
Denison Mines (USA) Corporation
1050 17"" Street, Suite 950
Denver, CO 80265
Dear Mr. Landau:
Subject: July 15, 2009 DUSA Letter, Site Tank Layout and Update; May 28, 2009 DRC
Confirmatory Action Letter; April 28, 2009 DUSA Letter: White Mesa Uranium Mill-
2008 Engineering Inspection Module 75E: Closeout Letter
We received and reviewed your submittal of July 15, 2009 on the above subject. It appears that the DUSA
response in this matter is complete. Updated maps of the tanks of the original mill site as well as the new
altemative feed circuit have been provided complete, showing the reagents being stored. Therefore, the
requirements of the subject inspection module 75E have been satisfied.
Thank you for your cooperation. Please contact Dave Rupp at (801) 536-4023 with any questions.
UTAH RADIATION CONTROL BOARD
Dane L. Fiiyerlfrock,
Executive Secretary
DLF/ DAR: dr
Cc: Thomas Rushing, DRC
F:\drupp\Moclule lnsp\2008 Module 75E Close-out 8-09.doc
File: IUC02.06.08
168 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144850 • Salt Lake City, LIT 84114-4850
Telephone (801) 536-4250 • Fax (801) 533-4097 • T.D.D. (801) 536-4414
www.deq.utab.gov
Printed on 100% recycled paper