Loading...
HomeMy WebLinkAboutDRC-2009-003395 - 0901a0688012f726State of Utah JON M. HUNTSMAN, JR. Governor GARY HERBERT Lieutenant Governor ^^"^"7 ^tc-^^(y^'Ooi3is Department of Environmental Quality Amanda Smith Acting Executive Director DrVlSlON OF RADIATION CONTROL Dane L. Finerfrock Director August 6, 2009 I iir (7U^\ ^ xn-CERTIFffiD MAIL ICXTl "Cri^^^ QOQO (Return Receipt Requested) David C. Frydenlund Vice President Regulatory Affairs and Counsel Denison Mines (USA) Corp. (DUSA) 1050 Seventeenth Street, Suite 950 Denver, CO 80265 Dear Mr. Frydenlund: SUBJECT: June 5, 2009 DUSA Letter, White Mesa Uranium Mill Ground Water Discharge Permit No. UGW370004 - New Decontamination Pad [NDP]; May 20, 2009, DUSA Drawings of NDP; Request for Information We have reviewed the subject drawings of the New Decontamination Pad system. Our review is focused on the concrete settling tank system (CST). The CST is to be operated as an approved best available technology (BAT) facility. We have the following comments: A. DRC proposed modifications to paragraph r) in Attachments - Proposed Modifications to the DMT Plan found in the letter dated June 29, 2009 by Denison Mines (USA) Corp. (hereafter "DUSA"): 1. Modify the Daily Inspection Form (found in Section VII) to include a location on the form to record the daily visual inspection information for presence of fluid in all leak detection system (LDS) vertical inspection portals for the three chambers in the concrete settling tank system for the decontamination pad. 2. On a quarterly basis submit with the DMT Performance Standard Monitoring Report a summary of the daily visual inspections for the quarter for the presence of fluid in all LDS vertical inspection portals for the primary and secondary containment for the three chambers in the concrete settling tank system for the decontamination pad. The report will also include an electronic or hard copy of daily inspection forms for the quarter and reporting of any BAT failures for the decontamination pad. 168 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144850 • Salt Lake City. UT 84114-4850 Telephone (801) 536-4250- Fax (801) 533-4097 • T.D.D. (801)536-4414 www.deq.Utah.gov Printed on 100% recycled paper Page 2 .;, 3. Should any fluid be observed in any of the LDS vertical inspection portals for the three chambers in the concrete settling tank system for the decontamination pad, the decontamination pad well be immediately taken out of service and be reported to the Executive Secretary as required in Part I.G.3(a) ofthe Permit (see below). Permit Part I.G.3(a): Failure to Maintain DMT or BAT Required by Permit a) Permittee to Provide Information - in the event that the Permittee fails to maintain DMT or BAT or otherwise fails to meet DMT or BAT standards as required by the permit, the Permittee shall submit to the Executive Secretary a notification and description of the failure according to R317-6-6.16(C)(1). Notification shall be given orally 'within 24 hours ofthe Permittee's discovery of the failure of DMT or BAT, and shall be folio-wed up by written notification, including the information necessary to make a determination under R317-6-6.16(C)(2), within five days ofthe Permittee's discovery of the failure of best available technology. B. Regarding Design issues: 4. Will the transmissivity of the compressed geonet, under fully loaded conditions, significantly impede the flow of any horizontal flow of water through the geonet to the monitoring locations? Please demonstrate that the compressed geonet, under fully loaded conditions will not significantly affect the flow of any leakage to the LDS monitoring pipe locations. 5. The permeability of the concrete for the CST needs to be determined. The permeability of the concrete can be estimated by analyzing the concrete mix design, as discussed in the publication of the Portland Cement Association, Design and Control of Concrete Mixtures, EBOOl, 13"^ Ed., and other field and sampling methods. We recommend the first method be used, and the calculation for the estimated permeability of the concrete be submitted for review and approval. 6. Sheet 3 of the drawings indicate the CST subgrade is to be prepared level. The as-built elevations and grades of the concrete floors and elevations of the walls of the CST must be submitted for review and approvaL 7. With respect to the above determination, the CST leakage monitoring pipes must be placed at the locations of the lowest floor elevation within each chamber of the CST. Please revise the as-built drawings to show the new locations of the CST leakage monitoring pipes and submit the revised drawings for review and approval. 8. Related to the above, the upper and lower elevations of the water level measuring pipes at these new locations mentioned above must be determined and shown on the final as-built drawings. 9. The details of the overlap of the steel liner cover over the exterior CST concrete walls, with a specified drip type edging, is not shown on the drawings. The design of the edging must be so that it prevents intrusion of precipitation and wash water into the space between the steel cover and the concrete surfaces. Please revise the as-built drawings to show the Page 3 details of a specific drip type edging over the exterior CST walls, which meets the foregoing criteria, and submit the revised drawings for review and approval. 10. The exterior edges of the installed steel liner cover over.the CST must be tested to demonstrate a "roofing" ability, as discussed in item 9 above. Please submit the results of this testing for review and approval. 11. It is recommended DUSA perform a hydrostatic test on the steel liner prior to installation. This test should be done outside the CST, before the steel liner is installed, so leaks can be easily observed and repaired. Please provide an appropriate standardized and industry approved method for this testing (e.g. ASTM), for DRC review and approval. Please review the above comments, and submit the requested information. If you have any questions on the above, please contact me. Dren B. Morton, P.G. lanager, Geotechnical Services Section LBM:DAR:DH:dr F:\dnipp\DUSA\GWDPenmt\Decon Pad Monitoring & Tech Cmts7-2009.doc File: IUC04.01 As-Builts: New DeConPad at SE Cor Ore Pad 2009