Loading...
HomeMy WebLinkAboutDRC-2009-001002 - 0901a0688010f4d4DENISOI^/ MINES April 3, 2009 VIA Electronic Mail (PDF) and Federal Express Dane L. Finerfi'ock, Executive Secretary Utah Radiation Control Board Utah Department of Environmental Quality 168 North 1950 West P.O. Box 144810 Salt Lake City, UT 84114-4810 ,00 'CC^ Denbon Mines (USA) Corp. 1050 ITtti Street, Suite 990 Denvw, CO 8026S USA Tel: 303 628-7798 Fax:303389412S www.denisdnminet.coin Re: State of Utah Ground Water Discharge Permit No. UW370004 (the "GWDP") White Mesa Uranium Mill - Notice Pursuant to Part I.G.I(a) Dear Mr. Finerfrock: The White Mesa uranium mill (the "Mill") completed its 1^' quarter, 2009 groundwater sampling under the GWDP on Febmary 3, 4, 9, & 11, 2009. The final analytical results of these samplings were issued on March 5, 17, 23, & 24, 2009 Under the GWDP it is intended that background groimdwater quality will be determined on a well-by-well basis, as defined by the mean plus second standard deviation concentration. The Mill is currently in the process of working with the Utah Division of Radiation Control to establish backgroimd (including the mean plus standard deviation) for all of the constituents being sampled under the GWDP. Until background is established, the GWDP requires that constituent concentrations in each monitoring well shall not exceed the Groimdwater Control Limits ("GWCLs") set out in Table 2 of the GWDP. Pursuant to Part I.G.I.a) of the GWDP, please take notice that the concentrations of the following constituents in the following monitoring wells for the 1^' Quarter of 2009 exceeded their respective GWCLs in Table 2 of the Permit: Table 1 - GWCL Exceedances for the Quarter Monitoring WeU (Wat^r Glass) MW-14 (Class UI) Constituent Manganese GWCL (ug/L) 400 Sample Reisult (iig/L) 2,190 Monitoring AVell (Water Class) MW-14 Contd. MW.26 (Class III) MW-32 (Class IID Constituent Uranium Manganese Uranium Chloroform Dichlormethane Cadmium Manganese Nickel Iron GWCL (ug/L) 15 400 15 35 2.5 2.5 400 50 5,500 Sample Result (ug/L) 60.5 1,370 43 1,600 89 2.98 5,170 63 9,180 Unless the compliance status for any constituents in any wells is determined otherwise by the Executive Secretary, the Mill will, pursuant to Part I.G.I.b)l) of the Permit, commence or continue, as the case may be, accelerated sampling of each of the foregoing constituents in its respective well on a monthly or quarterly basis, as applicable, and as set forth below: Table 2 - Accelerated Monitoring Requirements as of April 3,2009 Monitoring Well (Water Class) MW-1 (Class ID MW-3 (Class III) MW-5 (Class II) MW-12 (Class III) MW-14 (Class UT) MW-15 (Class IID Constituent Tetrahydrofuran Manganese Manganese Selinium Thallium Uranium Tetrahydrofuran Manganese Fluoride Tetrahydrofuran Manganese Uranium Manganese Uranium Selenium Uranium Nbrnial ; Frequency of Sampling Semi-Annual Semi-Annual Semi-Annual Semi-Annual Semi-Annual Semi-Annual Semi-Annual Semi-Annual Semi-Annual Semi-Annual Semi-Annual Semi-Annual Quarterly Quarterly Semi-Annual Semi-Annual Accelerated Frequency of Sampling Quarterly Quarterly Quarterly Quarterly Quarterly Quarterly Quarterly Quarterly Quarterly Quarterly Quarterly Quarterly Monthly Monthly Quarterly Quarterly Commencement of Accelerated Monitoring 4" Quarter 2005 1" Quarter 2006 1" Quarter 2006 3"* Quarter 2006 4* Quarter 2005 4* Quarter 2005 3"" Quarter 2006 4"" Quarter 2005 4"" Quarter 2005 1" Quarter 2006 4" Quarter 2005 4" Quarter 2005 June 2005 June 2005 4" Quarter 2005 4" Quarter 2005 DENISOI^ii MINES Mqnitqiring Well; ':;;;(Wat(W^Pass) 1 MW-17 (Class III) MW-18 (Class II) MW-19 (Class ID MW-26 (Class IID MW-32 (Class IID ^i ••;" .Gbnistitiient: \' :}•'••• Uranium Thalium Thallium Uranium Manganese Fluoride Selenium Thallium Uranium Nitrate Manganese Uranium Chloroform Dichloromethane Cadmium Iron Manganese Nickel Gross Alpha .-•;'Npriiial..-:; -Frequency of 4 r : Sainipiing:^: -V Semi-Annual Semi-Annual Semi-Annual Semi-Annual Semi-Annual Semi-Annual Semi-Annual Semi-Annual Semi-Annual Semi-Annual Quarterly Quarterly Quarterly Quarterly Quarterly Quarterly Quarterly Quarterly Quarterly Acteleratedv" ::':FiriE!quehcy6iF.i;^ j.:i-.. Sampling'T/I:.!. Quarterly Quarterly Quarterly Quarterly Quarterly Quarterly Quarterly Quarterly Quarterly Quarterly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly Monthly : Gommeniceimenfof; y - .•*;;; Accel^riied-;;.; 'ii-^ i::-': ; Monitoring -Ok 4" Quarter 2005 I''Quarter 2006 4" Quarter 2005 4" Quarter 2005 January, 2008 I''Quarter 2006 4* Quarter 2005 l"* Quarter 2006 4"" Quarter 2005 l"* Quarter 2009 June 2005 June 2005 June 2005 September 2005 June 2005 June 2005 June 2005 June 2005 March 2007 If you have any questions or require any further information, please contact the undersigned. Yours very tmly, DENISON MINES (USA) CORP. STEVEN D. LANDAU Manager, Environmental Affairs cc: Ron Hochstein Harold Roberts David Frydenlund David Turk DENISO MINES J>ii