Loading...
HomeMy WebLinkAboutDDW-2024-012901Utah Department Of Environmental Quality Division Of Drinking Water Admin Contacts Inventory Report Service Connections Treatment Plants Storage Pumping Stations BEAR LAKE PARK - NORTH EDEN CAMPGROUND PWS ID: UTAH17035 Rating: Approved 10/29/2024 Active Legal Contact UTAH STATE PARKS NORTH REGION RICHARD DROESBEKE 1594 W NORTH TEMPLE SUITE 116 SALT LAKE CITY, UT 84114 Phone: 801-556-1058 County: RICH COUNTY System Type: Transient Non-Community Population: 400 Site Updates Last Inventory Update: 06/05/2024 Last Surveyor Update: 05/30/2024 Surveyor: DANIELLE ZEBELEAN Operating Period: 4/1 - 10/31 Last IPS Update: 10/30/2024 07:10:00 Consumptive Use Zone Irrigation Zone: null Date: Name Title Office Emergency Email DROESBEKE, RICHARD PARK MANAGER 435-946-3343 richarddroesbeke@utah.gov Type Meter Type Meter Size # Of Connections Combined Unknown 0.000 40 Total Service Connections: 40 ID Plant Name Bin Status Date Design Cap Status TP001 NORTH EDEN CHLORINATOR 0 Inactive Treatment Purposes GASEOUS CHLORINATION, POST ID Name Type Effective Volume Material Status Status Reason ST001 NORTH EDEN TANK Ground 10,000 GAL Fiberglass Active Op Issued - Check Total Effective Volume: 10,000 GAL ID Station Name Status Reason Capacity Availability PF001 NORTH EDEN PUMP STATION Active Op Issued - Check Permanent Total Capacity: 0 null DEQ | Drinking Water Run Date: 10/30/2024 08:31:50 | Rating: Approved UTAH17035 BEAR LAKE PARK - NORTH EDEN CAMPGROUND page 1 of 6 Sources Site Visit History ID Source Name OP Date Status Reason Source Type Water Type Period Of Op WS001 NORTH EDEN CAMPGROUND WELL 06/11/2024 Active Op Issued - Check Well Groundwater 4/1 - 10/31 Flow Flow Rate UOM TYLD 150 GPM SYLD 100 GPM PUMP 120 GPM Date Visited Survey Type Surveyor Notified Date Next Inspection 05/30/2024 Sanitary Survey, Finished ZEBELEAN, DANIELLE 06/04/2024 12/31/2027 10/04/2024 Level 1 Assessment FRY, JEFFERY J 10/04/2024 DEQ | Drinking Water Run Date: 10/30/2024 08:31:50 | Rating: Approved UTAH17035 BEAR LAKE PARK - NORTH EDEN CAMPGROUND page 2 of 6 Bacterial Summary Report Routine Bacteriological Sampling Requirements Total Coliform Sample History 09/01/2023 - 10/31/2024 Sample Reuired Schedule Begin Schedule End Operation Begin Operation End 1/Monthly/Routine 08/01/2024 4/1 10/31 Routine Sampling Repeat Sampling Triggered Sampling Assessment Sampling Month #Sample s TC+Ecoli+#Sample s TC+Ecoli + #Sample s TC+Ecoli + #Sample s TC+Ecoli + Sep-23 0 0 0 0 0 0 0 0 0 0 0 0 Oct-23 0 0 0 0 0 0 0 0 0 0 0 0 Nov-23 0 0 0 0 0 0 0 0 0 0 0 0 Dec-23 0 0 0 0 0 0 0 0 0 0 0 0 Jan-24 0 0 0 0 0 0 0 0 0 0 0 0 Feb-24 0 0 0 0 0 0 0 0 0 0 0 0 Mar-24 0 0 0 0 0 0 0 0 0 0 0 0 Apr-24 0 0 0 0 0 0 0 0 0 0 0 0 May-24 0 0 0 0 0 0 0 0 0 0 0 0 Jun-24 0 0 0 0 0 0 0 0 0 1 1 0 Jul-24 1 0 0 0 0 0 0 0 0 1 0 0 Aug-24 1 1 0 3 2 0 1 0 0 1 0 0 Sep-24 1 0 0 0 0 0 0 0 0 1 0 0 Oct-24 0 0 0 0 0 0 0 0 0 1 0 0 DEQ | Drinking Water Run Date: 10/30/2024 08:31:50 | Rating: Approved UTAH17035 BEAR LAKE PARK - NORTH EDEN CAMPGROUND page 3 of 6 Water Monitoring Report BACTERIOLOGICAL MONITORING MONITORING REQUIREMENTS BY FACILITY Sample Count Type Frequency Schedule Begin Schedule End Analyte Name 1 Routine Monthly 08/01/2024 COLIFORM (TCR) ID NAME WS001 NORTH EDEN CAMPGROUND WELL Name Sample Count Type Frequency Last Sampled Next Sample Due NITRATE 1 Routine Yearly 04/25/2024 01/01/2025 - 12/31/2025 SULFATE 1 Routine Quarterly 04/25/2024 07/01/2024 - 09/30/2024 DEQ | Drinking Water Run Date: 10/30/2024 08:31:50 | Rating: Approved UTAH17035 BEAR LAKE PARK - NORTH EDEN CAMPGROUND page 4 of 6 IPS 2020 Report IPS Report IPS Summary Total IPS Pts: 30 Admin & Physical Facilities Quality & Monitoring Significant Deficiency 30 0 0 DEQ | Drinking Water Run Date: 10/30/2024 08:31:50 | Rating: Approved UTAH17035 BEAR LAKE PARK - NORTH EDEN CAMPGROUND page 5 of 6 Physical Facility Points 2020 Total Pts: 30 Facility Facility Name Status Points Effective DS001 UTAH17035 DISTRIBUTION SYSTEM A 30.0 Code Description Severity Comments Determined Date Not Assessed Assessed M004 CCC-NO ANNUAL PUBLIC EDUCATION OR AWARENESS MIN No documentation at time of survey 05/30/2024 15 M006 CCC-LACKS WRITTEN RECORDS OF CCC ACTIVITIES MIN Need to make and inventory of all the spigots 05/30/2024 15 Operator Certification Type Level Required Highest Certificate Distribution Dist 1 Treatment DEQ | Drinking Water Run Date: 10/30/2024 08:31:50 | Rating: Approved UTAH17035 BEAR LAKE PARK - NORTH EDEN CAMPGROUND page 6 of 6