Loading...
HomeMy WebLinkAboutDDW-2024-012897Contacts Type: Administrative Contact Name: DOUGLAS OGILVY Office: 435-333-3700 Emergency: Email: douglas.ogilvy@gmail.com Site Information Legal Contact: RED CLOUD WATER SYSTEM Address: PO BOX 99 , KAMAS, UT 84036 Phone: 435-333-3700 County: SUMMIT COUNTY System Type: Transient Non- Community Certification Required: Total Population: 150 Local Health District: Summit County Public Health Department Site Updates Last Inventory Update: 10/02/2024 Last Surveyor Update: 09/12/2024 Surveyor: JULIE JENNIFER COBLEIGH Operating Period: 1/1 - 12/31 Last IPS Update: 10/30/2024 07:10:00 Political Districts Legislative District Map Water Usage Information per ERC Total Ips Points: 105 Public Water System Water Monitoring ReportDEQ | Drinking Water Red Cloud Water System PWS ID: UTAH22157 Rating:Status: Active BACTERIOLOGICAL MONITORING Sample Count Type Frequency Schedule Begin Schedule End Analyte Name 1 Routine Monthly 10/31/2023 COLIFORM (TCR) DISINFECTION BYPRODUCT STAGE 2 MONITORING Sample Count Type Frequency Sample Label OTHER DISTRIBUTION MONITORING Analyte Name ID Sample Count Type Frequency Last Sampled Next Sample Due CHLORINE RESIDUAL MONITORING ID Facility Name Sample Count Type Frequency Last Sampled Next Sample Due DS001 UTAH22157 DISTRIBUTION SYSTEM 12 Routine Monthly -- MONITORING REQUIREMENTS BY FACILITY ID Name Facility Details GROUPED SOURCE SAMPLING STATIONS Sample Group ID Sample Group Facility Details OPEN COMPLIANCE SCHEDULES Type Required Activities Severity Created Due Lead Copper Rule Revisions COMPLETE INITIAL LSL INVENTORY 12/16/2021 10/16/2024 Lead Copper Rule Revisions SUBMIT LEAD SERVICE LINE INVENTORY 12/16/2021 10/16/2024 WELCOME TO THE CLUB LETTER SCHEDULE ONSITE INSPECTION/SANITARY SURVEY 09/05/2023 09/04/2024 WELCOME TO THE CLUB LETTER SCHEDULE ENGINEERING EVALUATION REPORT 09/05/2023 05/03/2024 WELCOME TO THE CLUB LETTER SCHEDULE GWR CORRECT DEFICIENCY 120 DAYS SIG 09/05/2023 05/02/2025 WELCOME TO THE CLUB LETTER SCHEDULE GWR CORRECT DEFICIENCY 120 DAYS SIG 09/05/2023 05/02/2025 Revised Total Coliform Rule SAMPLING SITE PLAN SUBMITTAL 09/05/2023 10/31/2023 CCR SCHEDULES Submit Consumer Confidence Report 01/01/2024 07/01/2024 CCR SCHEDULES Submit CCR Certification Letter 01/01/2024 10/01/2024