HomeMy WebLinkAboutDDW-2024-012890Utah Department Of Environmental Quality
Division Of Drinking Water
Admin Contacts
Inventory Report
Service Connections
Sources
Site Visit History
PHEASANT RUN
OUTFITTERS
PWS ID: UTAH20079 Rating:Active
Legal Contact
PHEASANT RUN OUTFITTERS
THOMAS JENSEN
PO BOX 314
PLEASANT GROVE, UT 84042
Phone: 801-420-1867
County: SANPETE COUNTY
System Type: Transient Non-Community
Population: 60
Site Updates
Last Inventory Update: 10/02/2023
Last Surveyor Update:
Surveyor:
Operating Period: 1/1 - 12/31
Last IPS Update: 10/28/2024 07:10:00
Consumptive Use Zone
Irrigation Zone: null
Date:
Name Title Office Emergency Email
JENSEN, THOMAS 801-420-1867 pheasantrunoutfitters@msn.com
Type Meter Type Meter Size # Of Connections
Commercial Unknown 0.000 2
Total Service Connections: 2
ID Source Name OP Date Status Reason Source
Type Water Type Period Of
Op
WS001 EAGLE EYE WELL Active Well Groundwater 1/1 - 12/31
Date Visited Survey Type Surveyor Notified Date Next Inspection
10/10/2023 Compliance Assessment 10/10/2023 11/30/2024
DEQ | Drinking Water
Run Date: 10/28/2024 08:46:31 | Rating: UTAH20079 PHEASANT RUN OUTFITTERS page 1 of 5
Water Monitoring Report
BACTERIOLOGICAL MONITORING
MONITORING REQUIREMENTS BY FACILITY
Sample Count Type Frequency Schedule Begin Schedule End Analyte Name
1 Routine Monthly 12/01/2023 COLIFORM (TCR)
ID NAME
WS001 EAGLE EYE WELL
Name Sample
Count Type Frequency Last Sampled Next Sample Due
PRIMARY IOCS 1 ERROR:SP One Time 03/31/2025 - 03/31/2025
SEC IOC AND ADD CONT 1 ERROR:SP One Time 03/31/2025 - 03/31/2025
Open Compliance Schedule
Type Required Activities Severity Created Due
WELCOME TO THE CLUB LETTER
SCHEDULE
GWR CORRECT DEFICIENCY 120 DAYS SIG 10/28/2024 04/26/2026
WELCOME TO THE CLUB LETTER
SCHEDULE
GWR CORRECT DEFICIENCY 120 DAYS SIG 10/28/2024 04/26/2026
WELCOME TO THE CLUB LETTER
SCHEDULE
ONSITE INSPECTION/SANITARY SURVEY 10/28/2024 10/28/2025
WELCOME TO THE CLUB LETTER
SCHEDULE
CAPACITY DEVELOPMENT EVALUATION 10/28/2024 04/26/2026
WELCOME TO THE CLUB LETTER
SCHEDULE
ENGINEERING EVALUATION REPORT 10/28/2024 04/26/2025
WELCOME TO THE CLUB LETTER
SCHEDULE
NEW PWS FORM 10/28/2024 11/26/2024
WELCOME TO THE CLUB LETTER
SCHEDULE
GWR CORRECT DEFICIENCY 120 DAYS SIG 10/28/2024 04/26/2025
Revised Total Coliform Rule SAMPLING SITE PLAN SUBMITTAL 10/10/2023 12/31/2024
DEQ | Drinking Water
Run Date: 10/28/2024 08:46:31 | Rating: UTAH20079 PHEASANT RUN OUTFITTERS page 2 of 5
IPS 2020 Report
IPS Report
IPS Summary Total IPS Pts: 125
Admin & Physical Facilities Quality & Monitoring Significant Deficiency
75 50.0 0
DEQ | Drinking Water
Run Date: 10/28/2024 08:46:31 | Rating: UTAH20079 PHEASANT RUN OUTFITTERS page 3 of 5
Physical Facility Points 2020 Total Pts: 75
Facility Facility Name Status Points Effective
DS001 UTAH20078 DISTRIBUTION SYSTEM A 75.0
Code Description Severity Comments Determined Date Not
Assessed Assessed
G001 UNAPPROVED
FACILITY IN SERVICE
SIG OPERATING PERMIT DUE
FOR ALL FACILITIES BY
APRIL 16, 2025
10/10/2023 50 0
M003 CCC-LACKS LOCAL
AUTHORITY
MIN DUE BY JANUARY 8, 2024 10/10/2023 15
M004 CCC-NO ANNUAL
PUBLIC EDUCATION
OR AWARENESS
MIN DUE BY APRIL 7, 2024 10/10/2023 15
M005 CCC-LACKS
OPERATOR TRAINING
MIN DUE BY APRIL 7, 2024 10/10/2023 15
M006 CCC-LACKS WRITTEN
RECORDS OF CCC
ACTIVITIES
MIN DUE BY APRIL 7, 2024 10/10/2023 15
M007 CCC-LACKS ON-
GOING
ENFORCEMENT
IMPLEMENTATION
MIN DUE BY APRIL 7, 2024 10/10/2023 15
WS001 EAGLE EYE WELL A 0.0
Code Description Severity Comments Determined Date Not
Assessed Assessed
S001 UNAPPROVED
SOURCE IN SERVICE
SIG OPERATING PERMIT DUE
APRIL 16, 2025
10/10/2023 200 0
SP06 NEW WATER SOURCE
LACKS APPROVED
PER
SIG PRELIMINARY
EVALUATION REPORT AND
FULL DRINKING WATER
SOURCE PROTECTION
PLAN DUE BY MAY 1, 2024
10/10/2023 50 0
Microbial Rule Violations Total Pts: 50
Determined Compliance Period Code Violation Type Return To
Compliance Point Effective
01/21/2024 12/01/2023 - 12/31/2023 3A MONITORING, ROUTINE,
MAJOR (RTCR)
N 25.0
08/30/2024 06/01/2024 - 06/30/2024 3A MONITORING, ROUTINE,
MAJOR (RTCR)
N 25.0
Operator Certification
Type Level Required Highest Certificate
Distribution
Treatment
DEQ | Drinking Water
Run Date: 10/28/2024 08:46:31 | Rating: UTAH20079 PHEASANT RUN OUTFITTERS page 4 of 5
Open Compliance Schedule
Type Required Activities Severity Created Due
WELCOME TO THE CLUB LETTER
SCHEDULE
GWR CORRECT DEFICIENCY 120 DAYS SIG 10/28/2024 04/26/2026
WELCOME TO THE CLUB LETTER
SCHEDULE
GWR CORRECT DEFICIENCY 120 DAYS SIG 10/28/2024 04/26/2026
WELCOME TO THE CLUB LETTER
SCHEDULE
ONSITE INSPECTION/SANITARY SURVEY 10/28/2024 10/28/2025
WELCOME TO THE CLUB LETTER
SCHEDULE
CAPACITY DEVELOPMENT EVALUATION 10/28/2024 04/26/2026
WELCOME TO THE CLUB LETTER
SCHEDULE
ENGINEERING EVALUATION REPORT 10/28/2024 04/26/2025
WELCOME TO THE CLUB LETTER
SCHEDULE
NEW PWS FORM 10/28/2024 11/26/2024
WELCOME TO THE CLUB LETTER
SCHEDULE
GWR CORRECT DEFICIENCY 120 DAYS SIG 10/28/2024 04/26/2025
Revised Total Coliform Rule SAMPLING SITE PLAN SUBMITTAL 10/10/2023 12/31/2024
DEQ | Drinking Water
Run Date: 10/28/2024 08:46:31 | Rating: UTAH20079 PHEASANT RUN OUTFITTERS page 5 of 5