October 25, 2024
Thomas Jensen
Pheasant Run Outfitters
PO Box 314
Pleasant Grove, UT 84062
Subject: Extension of Initial Order for New Public Water System, Pheasant Run Outfitters
UTAH20079
Dear Thomas Jensen:
On October 10, 2023, the Director of the Division of Drinking Water (“Director”) issued an Initial Order
(“IO”) for a New Public Water System to Pheasant Run Outfitters UTAH20079 (“System”). Pheasant Run
Outfitters promptly notified the Director after receiving the IO in 2023 that they were experiencing issues
securing water rights. They indicated that they would have to cease operations entirely if those were not
resolved. The Director agreed to allow the system additional time to address their water rights. In August
of 2024, Pheasant Run Outfitters notified the Director that they intended to continue operations. The
Director is issuing the attached amended Enforcement Order Schedule to allow the Pheasant Run Outfitters
additional time to comply with the October 2023 IO. The October 2023 IO remains a final order.
Pheasant Run Outfitters will remain unrated.
Please continue to work with Division staff and your local health department to remain in compliance.
Under Utah law, the Director of the Division is required to provide notice of violations of the Utah Safe
Drinking Water Act (the “Act”), the rules, or orders and to otherwise enforce compliance with regulatory
requirements; this includes violations of the IO.
If you have any further questions, please contact Colt Smith at (385) 515-1529 or acsmith@utah.gov.
Sincerely,
Nathan Lunstad, Ph.D., P.E.,
Director, Division of Drinking Water
Pheasant Run Outfitters
Page 2 of 2
October 25, 2024
Enclosures: Original NSO
Amended Enforcement Order Schedule: Appendix A
Monitoring Schedule, IPS Report, Inventory Report
cc: Thomas Jensen, Pheasant Run Outfitters, pheasantrunoutfitters@msn.com
Eric Larsen, Central Utah Public Health Department, elarsen@centralutahhealth.org
John Chartier, P.E., District Engineer, jchartier@utah.gov
Bret F. Randall, Assistant Attorney General, bfrandall@agutah.gov
EQDWmonitoring, EQDWFS
New System Order Due Dates Date of Issuance: October 25, 2024 Page 1 of 4
Appendix A
Amended Enforcement Order Schedule UTAH20079
System Name: Pheasant Run Outfitters
System Number: UTAH20079
Administrative Contact: Thomas Jensen
Email: pheasantrunoutfitters@msn.com
Phone Number: 801-420-1867
Corrective Action Requirements and Due Dates
Date of Issuance: October 25, 2024
Plan Review
Item 2a New Public Water System Supplemental Form
Action Completion Due Date
Submit a completed New Public Water System Supplemental
Form.
Within 30 days of the Date of
Issuance of this Order.
Division of Drinking Water Contact
Colt Smith
385-515-1529
acsmith@utah.gov
Item 2b Engineering Evaluation Report Rule Citation
R309-500
Action Completion Due Date
Submit an Engineering Evaluation Report prepared by a Utah
licensed engineer containing detailed information on all
system facilities.
Within 180 days of the Date of
Issuance of this Order.
Division of Drinking Water Contact
John Chartier, P.E.
435-896-5451 ext 314 (office) / 435-559-1969 (cell)
jchartier@utah.gov
New System Order Due Dates Date of Issuance: October 25, 2024 Page 2 of 4
Item 2d Operating Permit Rule Citation
R309-500-4
Action Completion Due Date
The respondent shall complete all requirements to obtain an
Operating Permit.
Within 545 days of the Date of
Issuance of this Order.
Division of Drinking Water Contact
John Chartier, P.E.
435-896-5451 ext 314 (office) / 435-559-1969 (cell)
jchartier@utah.gov
3. Capacity Development Evaluation
Item 3 Capacity Development Evaluation Rule Citation
R309-800
Action Completion Due Date
The respondent shall complete all requirements for their
capacity development.
Within 545 days of the Date of
Issuance of this Order.
Division of Drinking Water Contact
Michael Grange
801-674-2563
mgrange@utah.gov
4. Sanitary Survey and Emergency Response
Item 4a Sanitary Survey Rule Citation
R309-100-6
Action Completion Due Date
The respondent shall schedule an onsite inspection/sanitary
survey.
Within 365 days of the Date of
Issuance of this Order.
Division of Drinking Water Contact
Ryan Dearing
801-419-6785
rdearing@utah.gov
5. Cross Connection Control
Item 5a Local Authority Statement Rule Citation
R309-105-12(2)
Action Completion Due Date
The respondent shall submit a complete Cross Connection
Control Local Authority Statement to the Division
Within 90 days of the Date of
Issuance of this Order.
Division of Drinking Water Contact
Gary Rager
385-549-7609
grager@utah.gov
New System Order Due Dates Date of Issuance: October 25, 2024 Page 3 of 4
Item 5b Public Education, Operator Training, Record Keeping,
On-Going Enforcement Implementation
Rule Citation
R309-105-12(2)
Action Completion Due Date
The respondent shall complete the annual public education or
awareness, operator training, record keeping and on-going
enforcement plan and submit evidence to the Division
Within 180 days of the Date of
Issuance of this Order.
Division of Drinking Water Contact
Gary Rager
385-549-7609
grager@utah.gov
6. Source Protection Program
Item 6a Preliminary Evaluation Report Rule Citation
R309-600-13
Action Completion Due Date
Respondent shall submit a Preliminary Evaluation Report Within 180 days of the Date of
Issuance of this Order.
Division of Drinking Water Contact
Source Protection Staff
801-536-4200
7. Monitoring and Reporting
Item 9a Total Coliform Monitoring Rule Citation
R309-211
Action Completion Due Date
The respondent shall submit monthly routine coliform
bacteriological samples to the Division each month the system
is open.
By December 31, 2024
Division of Drinking Water Contact
Sitara Federico
385-515-1459
sfederico@utah.gov
Item 9b Total Coliform Sample Site Plan Rule Citation
R309-211-4
Action Completion Due Date
The respondent shall submit a written total coliform sample
site plan to the Division.
By December 31, 2024
Division of Drinking Water Contact
Sitara Federico
385-515-1459
sfederico@utah.gov
New System Order Due Dates Date of Issuance: October 25, 2024 Page 4 of 4
Item 9c New Source Chemistries Rule Citation
R309-515-4(5)
Action Completion Due Date
The respondent shall take and submit all required New Source
Chemistries for each active source.
By March 31, 2025
Division of Drinking Water Contact
David Kruse
385-566-7789
dbkruse@utah.gov
IT IS SO ORDERED AND AGREED.
DIVISION OF DRINKING WATER
By:
Nathan Lunstad, Ph.D., P.E.
Director
DATE: ___________________________________