HomeMy WebLinkAboutDERR-2024-011858Utah Department of Environmental Quality - UST Release Detection
TANK OWNERSHIP
Name BRET CALAWAY
Address 5833 N 1740 W
SAINT GEORGE, UT 84770
Contact BRET CALAWAY
Phone
Email None
TANK LOCATION
Name SUNSHINE TRUCKSTOP
Address 225 N HWY 91, SUMMIT EXIT
SUMMIT, UT 84772
A Operator BRET CALAWAY
Phone (435) 229-0685
B Operator SAME
Phone SAME
Facility ID: 6000487 Inspection Date: 10/30/2024
DISPENSER DETAILS
DISP
ID/ALT
ID
SUBSTANCE UDC PIPE FLEX LOC
INSTALL
DATE
UDC
INSTALL
DATE
FIRE
VALVE
SAT
PRESENT
UDC
TEST
DISP
FLEX
CP
TEST
TANK DETAILS
Tank ID/Alt ID 9 / 9
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Aug. 21, 1998 / 20000 /
Substance
Stored Diesel /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-450 CSLD No
Manifold
LTT Test Aug. 29, 2024
LLD Test Aug. 29, 2024
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Red Jacket / VR FX1DV
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Ball float
valve / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 10 / 10
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Aug. 21, 1998 / 12000 /
Substance
Stored Gasoline / Regular
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-450 CSLD No
Manifold
LTT Test Aug. 29, 2024
LLD Test Aug. 29, 2024
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Vaporless LD2000
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Ball float
valve / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
2024-10-30 Page 1 of 13
Tank ID/Alt ID 11 / 11
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Aug. 21, 1998 / 12000 /
Substance
Stored Gasoline / Regular
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-450 CSLD No
Manifold
LTT Test Aug. 29, 2024
LLD Test Aug. 29, 2024
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Vaporless LD2000
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Ball float
valve / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 12 / 12
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Aug. 21, 1998 / 12000 /
Substance
Stored Gasoline / Regular
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-450 CSLD No
Manifold
LTT Test Aug. 29, 2024
LLD Test Aug. 29, 2024
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Vaporless LD2000
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Ball float
valve / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 20 / 20
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Aug. 21, 1998 / 20000 /
Substance
Stored Diesel /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-450 CSLD No
Manifold
LTT Test Aug. 29, 2024
LLD Test Aug. 29, 2024
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Red Jacket / VR FX1DV
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Ball float
valve / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
2024-10-30 Page 2 of 13
Tank ID/Alt ID 21 / 21
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Aug. 21, 1998 / 20000 /
Substance
Stored Diesel /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-450 CSLD No
Manifold
LTT Test Aug. 29, 2024
LLD Test Aug. 29, 2024
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Red Jacket / VR FX1DV
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Ball float
valve / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 22 / 22
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Aug. 21, 1998 / 20000 /
Substance
Stored Diesel /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-450 CSLD No
Manifold
LTT Test Aug. 29, 2024
LLD Test Aug. 29, 2024
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Red Jacket / VR FX1DV
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Ball float
valve / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 23 / 23
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Aug. 21, 1998 / 20000 /
Substance
Stored Diesel /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-450 CSLD No
Manifold
LTT Test Aug. 29, 2024
LLD Test Aug. 29, 2024
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Red Jacket / VR FX1DV
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Ball float
valve / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
INSPECTION COMMENTS
Title: Facility is closed
The tanks are not active and the dispensers have been removed.
No Photos
2024-10-30 Page 3 of 13
FACILITY RESPONSES
Financial Responsibility
Financial responsibility method is ok?Yes
The above accurately represents the
facility's release detection records Yes
Operator Training
A Operator current?No
B Operator current?No
Monthly checklist available and
complete?No
Is the site unmanned?Yes
Is a sign posted in a conspicuous area
giving the name and telephone number
of a person in case of an emergency
and if the station is manned part of the
time, are C operators trained?
No
Does the site have emergency shutoff
device?No
TANK RESPONSES
Tank 9 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 9 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
No
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 9 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 9 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 9 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 10 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
2024-10-30 Page 4 of 13
Tank 9 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 10 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 10 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
No
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 10 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 11 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 10 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 10 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 11 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 11 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 11 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 12 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 12 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
2024-10-30 Page 5 of 13
Tank 11 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
No
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 11 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 12 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 12 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 20 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 20 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 20 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 21 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 21 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 21 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
2024-10-30 Page 6 of 13
Tank 12 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
No
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 12 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 20 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 22 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 22 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 22 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 23 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 23 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 23 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
2024-10-30 Page 7 of 13
Tank 20 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
No
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 20 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 21 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
2024-10-30 Page 8 of 13
Tank 21 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
No
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 21 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 22 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
2024-10-30 Page 9 of 13
Tank 22 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
No
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 22 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 23 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
2024-10-30 Page 10 of 13
Tank 23 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
No
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 23 ATG/IM
Does the ATG system have a valid
annual test?Yes
DISPENSER RESPONSES
MONTHLY LEAK DETECTION MONITORING
Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24
Tank 9 Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 10 Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 11 Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 12 Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 20 Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 21 Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 22 Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 23 Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
NON-COMPLIANCE ITEMS
TANK 10
No Photos
Question:ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two
most recent months and 10 of last 12 months)? Show results in the RD tab.
Comments:None
TANK 11
No Photos
Question:ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two
2024-10-30 Page 11 of 13
most recent months and 10 of last 12 months)? Show results in the RD tab.
Comments:None
TANK 12
No Photos
Question:ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two
most recent months and 10 of last 12 months)? Show results in the RD tab.
Comments:None
TANK 20
No Photos
Question:ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two
most recent months and 10 of last 12 months)? Show results in the RD tab.
Comments:None
TANK 21
No Photos
Question:ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two
most recent months and 10 of last 12 months)? Show results in the RD tab.
Comments:None
TANK 22
No Photos
Question:ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two
most recent months and 10 of last 12 months)? Show results in the RD tab.
Comments:None
TANK 23
No Photos
Question:ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two
most recent months and 10 of last 12 months)? Show results in the RD tab.
Comments:None
TANK 9
No Photos
Question:ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two
most recent months and 10 of last 12 months)? Show results in the RD tab.
Comments:None
FACILITY
No Photos
Question:A Operator current?
Comments:None
FACILITY
No Photos
Question:B Operator current?
Comments:None
FACILITY
No Photos
Question:Monthly checklist available and complete?
Comments:None
FACILITY
No Photos
Question:Is a sign posted in a conspicuous area giving the name and telephone number of a person in case of
an emergency and if the station is manned part of the time, are C operators trained?
Comments:None
FACILITY
No Photos
Question:Does the site have emergency shutoff device?
Comments:None
2024-10-30 Page 12 of 13
Prepared by fueloperator.com
Inspection Information
Inspector:Viehweg, Kim
Record Created:Oct. 30, 2024, 4:14 p.m.
Inspection Date:Oct. 30, 2024
2024-10-30 Page 13 of 13