HomeMy WebLinkAboutDERR-2024-011836Deann Rasmussen <darasmussen@utah.gov>
Compliance Issues from Inspection FAC ID 4000211 Fairpark Express 2
1 message
Deann Rasmussen <darasmussen@utah.gov>Fri, Nov 1, 2024 at 12:42 PM
To: Fairpark Express <expressfairpark@gmail.com>
Based on the inspection yesterday there are several issues that need to be addressed.
1) Start doing the monthly inspections and record them on the inspection form. Submit the inspection form to me the first
week or each month for the next 3 months.
2) Get the tools you need to lift the STP containment lids and spill bucket lids. They don't need to be checked monthly but
they do need to be checked yearly. Send me a photo of the opened containment.
3) You should get cones and a safety vest while working with the lids and dispensers.
4) Keep one passing ATG slip for each tank per month. Send these to me for the next 3 months..
5) If there is anyone else that works there - you must train them as a C operator and keep track of that information on a
sheet that I can inspect next time.The A/B Operator Manual details what items you need to go over with your employees.
6) You need to get a sign for the outside of the store that indicates who to call in an emergency. There's an example in
the A/B Operator Manual and there's several good examples online.
7) The Veederoot needs to be set up properly. It needs to record alarms as well as passing results and these need to be
printed. Right now all that is printed is pass or fail. Send me a copy of the invoice from your petroleum supplier. This
needs to be done right away since you're not getting all the information that is needed.
8) Tests that are due on or before January 31, 2024 are::line tightness, line leak detector, automatic tank gauge, and the
pressure vent valves. Pressure vent valves are only lasting about 2-3 years and it may be less expensive to replace them
to test them and then have to replace them. Make sure it is on your testers' schedule.
9) The gauge on the premium spill bucket needs to be cleaned so the dial can be seen. If the issue is on the inside of the
gauge, it needs to be replaced and retested or the spill bucket may need replacing.
If these items aren't addressed within 3 months, you'll be required to take the A/B operator course and test again and you
may be required to pay a penalty when the fees are due. Let's work together to prevent leaks at this site and protect the
environment. Call me with any questions or concerns.
Thanks, DeAnn
--
DeAnn Rasmussen
Environmental Scientist
Mobile: (385) 251-0936
Office: (801) 536-4100
Fax: (801) 359-8853
darasmussen@utah.gov
DEQ/DERR/UST
195 North 1950 West-1st Floor
P.O. BOX 144840
Salt Lake City, UT 84114-4840
11/1/24, 12:43 PM State of Utah Mail - Compliance Issues from Inspection FAC ID 4000211 Fairpark Express 2
https://mail.google.com/mail/u/0/?ik=901d42da0e&view=pt&search=all&permthid=thread-a:r-2752117631809266410%7Cmsg-a:r-4764781246398967…1/1