Loading...
HomeMy WebLinkAboutDDW-2024-012813J. Paul Wright <pwright@utah.gov> Virgin Sky Water System- system # 27-108 - Request for updated letter of exception J. Paul Wright <pwright@utah.gov>Tue, Jun 18, 2024 at 2:19 PM To: karl@pv-eng.com Cc: cmartin@utah.gov, Bygnal Dutson <bygnal@stayopensky.com>, Jeremy Roberts <jroberts@swuhealth.org>, Jeff Thomas <JEFF@pv-eng.com> Karl, Just a couple of quick notes and comments from the photos and my quick observation of the plans: 1) The overflow appears to be too far from the ground. It should terminate from 12 to 24 inches from the ground and have a #4 screen on the end to avoid possibly eroding the foundation area. 2) I need to know that this tank is an ANSI/NSF 61 approved tank. 3) Because it is outside, it will need to be a hatch with a shoebox lid, gasketed, raised up a minimum of 4 inches above the roof of the tank and locakable. I have attached examples of some that have been custom manufactured for these kinds of tanks. You may even consider doing this for your existing 5,000 and 500 gallon tanks so that the exception does not continue to have to be renewed every three years. 4) The air vent discharge appears to sit only about 1 inch above the tank roof, this should be raised up to avoid potential blockage of the air vent. 5) All the piping needs to be buried, except for right at the tank inlet and outlet locations. Piping that is exposed to UV and other hazards (rock fall, weather, animals,etc) is not sanitary. These pipelines would have to have been submitted for approval for construction along with the tank drawings and approval would not have been issued without proper burial and trench details. 6) There are no details for the booster pump station. I need to see a design drawing and details about how it is connected, showing correct pressure gauges on either side of the pump (inlet side of pump has to have a compound gauge measure positive and negative pressure, discharge side has to have a standard gauge. Basically following Rule R309-540. 7) The booster pump enclosure has to be shown to be raised up off the ground and at a location where it has a proper drain (in the building or enclosure) and protected from flooding. 8) I need a pump curve or details on pumping rate (gpm) and hp rating of the pump. Also, be aware that the current rule does not require redundant pumps for this situation, transferring water from one location to another, but the new rule coming out very soon will require the installation of two pumps (one as a redundant pump) for all booster pump station. You may want to consider this in the revised design. As you can see, I have several comments, which would have been addressed and revised before construction if plans had been submitted ahead of time. Plans that are submitted to me should address all of these changes so that plan approval can be issued. After that, the modifications will have to be made before an operating permit can be issued. Let me know if you have questions. Paul On Tue, Jun 18, 2024 at 1:35 PM <karl@pv-eng.com> wrote: [Quoted text hidden] -- [Quoted text hidden] 6/18/24, 2:19 PM State of Utah Mail - Virgin Sky Water System- system # 27-108 - Request for updated letter of exception https://mail.google.com/mail/u/0/?ik=f3bcb897f8&view=pt&search=all&permmsgid=msg-a:r-5622012466937763942&simpl=msg-a:r-56220124669377…1/3 [Quoted text hidden] 6 attachments Screenshot_20230518-083717_Drive.jpg 486K Screenshot_20230518-083710_Drive.jpg 634K Screenshot_20230518-083724_Drive.jpg 634K Gasket on hatch.jpg 14K 6/18/24, 2:19 PM State of Utah Mail - Virgin Sky Water System- system # 27-108 - Request for updated letter of exception https://mail.google.com/mail/u/0/?ik=f3bcb897f8&view=pt&search=all&permmsgid=msg-a:r-5622012466937763942&simpl=msg-a:r-56220124669377…2/3 hatch and air vent.JPG 2357K hatch.JPG 2343K 6/18/24, 2:19 PM State of Utah Mail - Virgin Sky Water System- system # 27-108 - Request for updated letter of exception https://mail.google.com/mail/u/0/?ik=f3bcb897f8&view=pt&search=all&permmsgid=msg-a:r-5622012466937763942&simpl=msg-a:r-56220124669377…3/3 J. Paul Wright <pwright@utah.gov> Open Sky New Water Line and Tank, System 27108, File #15287 1 message J. Paul Wright <pwright@utah.gov>Mon, Oct 7, 2024 at 11:49 AM To: Jeff Thomas <jeff@pv-eng.com> Cc: Karl Rasmussen <karl@pv-eng.com>, Bygnal Dutson <bygnal@stayopensky.com> Jeff and Karl, I have reviewed the plans that you sent me and I have a couple of questions and comments: 1) Have the new hatches already been installed? The hatch seems to meet the DDW requirements, but if they haven't been installed yet, then the letter I produce will be a plan approval so you can go ahead and get the hatches installed. 2) Has the water line that you describe in the exception request with the steel pipe or the casing been installled, or is it just a poly pipe right now? Again, if you are waiting for plan approval and the exception approval first, I just need to know that. 3) The overflow discharge for the 550 gallon tank appears to discharge right at the base of the tank. This could erode the foundation around the tank if it discharges. You should include a splash pad of some sort to prevent this from happening.Also, the screen for an overflow only needs to be a #4 mesh screen, #14 is typically for air vents. 4) The booster pump is required to have a pressure gauge on the suction side as well, with the ability to measure negative pressure (a compound gauge). Let me know if you have questions. Paul On Tue, Sep 17, 2024 at 3:31 PM <jeff@pv-eng.com> wrote: Thank you for the update. From: J. Paul Wright <pwright@utah.gov> Sent: Tuesday, September 17, 2024 11:29 AM To: Jeff Thomas <jeff@pv-eng.com> Cc: Karl Rasmussen <karl@pv-eng.com> Subject: Re: Open Sky New Water Line and Tank I haven't had a chance to look at everything, it's probably going to be a few weeks. There are several projects ahead of this one right now. I will let you know once I have a chance to look at everything. Paul On Tue, Sep 17, 2024, 11:27 AM <jeff@pv-eng.com> wrote: 10/7/24, 11:50 AM State of Utah Mail - Open Sky New Water Line and Tank, System 27108, File #15287 https://mail.google.com/mail/u/0/?ik=f3bcb897f8&view=pt&search=all&permthid=thread-a:r3558528418226899287&simpl=msg-a:r-660958829371294…1/4