Loading...
HomeMy WebLinkAboutDAQ-2024-011307lntermountain Power Service Corporation August 28,2024 Mr. Bryce Bird, Director Utah Division of Air Quality 150 North 1950 West P.O. Box 744820 Salt Lake City, UT 847t4-4820 Dear Director Bird: UTAH DEPARruENT OF ENVIRONMENTAL OUAUTY ,":t . .n,1rlt,.f i DiVISION OF AIR QUALTY Monitoring Report for lntermountain Power Service Corooration's (IPSC) Title V Operating Permit (#2700010005) Condition l.S.2.a of the above referenced Title V Operating Permit (Permit) requires IPSC to submit a Monitoring Report every six months. This letter will serve as IPSC's Monitoring Report for the period of January t,2024, through June 30, 2024. During this time: All of the monitoring required by IPSC's Permit was conducted as per the Permit conditions. No deviations from Permit conditions occurred. All unavoidable breakdowns were reported in accordance with the provisions of R307-107 as per condition l.S.2.c of IPSC's Permit. No monitor downtime incidents for Permit conditions ll.B.2.b, ll.B.7.a, ll.B.7.b, and ll.B.8.a (other than downtime associated with zero and span or other daily calibration checks, if applicable), and the results of stack testing, if applicable for these Permit conditions, were su bmitted. There were no excursions or exceedances from Permit conditions ll.B.2.b, ll.B.7.a, ll.B.7.b, and ll.B.8.a. 850 West Brush Wellman Road, Delta, utah,84624 / lelephone: (435) 864-4414 / FAXi (435) 854-6570 / Fed. l.D. #87-0388573 B-2-10327 Mr. Bryce Bird August 28,2024 Page 2 As the final part of this Monitoring Report, I certify that, based on information and belief formed after reasonable inquiry, that the statements and information contained in this document are true, accurate, and complete. Should you have any questions, please contact Mike Utley at (435) 864-6489. Sincerely, furqViL,^" Jon A. Finlinson President and Chief Operations Officer and Responsible Official nAA-'t\- MU/HBl:ljs cc: LADWP - Gregory S. Huynh LADWP - Tamer Ellyahky LADWP - Andrea Villarin