HomeMy WebLinkAboutDAQ-2024-011307lntermountain Power Service Corporation
August 28,2024
Mr. Bryce Bird, Director
Utah Division of Air Quality
150 North 1950 West
P.O. Box 744820
Salt Lake City, UT 847t4-4820
Dear Director Bird:
UTAH DEPARruENT OF
ENVIRONMENTAL OUAUTY
,":t . .n,1rlt,.f i
DiVISION OF AIR QUALTY
Monitoring Report for lntermountain Power Service Corooration's (IPSC)
Title V Operating Permit (#2700010005)
Condition l.S.2.a of the above referenced Title V Operating Permit (Permit) requires IPSC to submit a
Monitoring Report every six months. This letter will serve as IPSC's Monitoring Report for the period of
January t,2024, through June 30, 2024. During this time:
All of the monitoring required by IPSC's Permit was conducted as per the Permit
conditions.
No deviations from Permit conditions occurred. All unavoidable breakdowns were
reported in accordance with the provisions of R307-107 as per condition l.S.2.c of IPSC's
Permit.
No monitor downtime incidents for Permit conditions ll.B.2.b, ll.B.7.a, ll.B.7.b, and
ll.B.8.a (other than downtime associated with zero and span or other daily calibration
checks, if applicable), and the results of stack testing, if applicable for these Permit
conditions, were su bmitted.
There were no excursions or exceedances from Permit conditions ll.B.2.b, ll.B.7.a,
ll.B.7.b, and ll.B.8.a.
850 West Brush Wellman Road, Delta, utah,84624 / lelephone: (435) 864-4414 / FAXi (435) 854-6570 / Fed. l.D. #87-0388573
B-2-10327
Mr. Bryce Bird
August 28,2024
Page 2
As the final part of this Monitoring Report, I certify that, based on information and belief formed after
reasonable inquiry, that the statements and information contained in this document are true, accurate,
and complete. Should you have any questions, please contact Mike Utley at (435) 864-6489.
Sincerely,
furqViL,^"
Jon A. Finlinson
President and Chief Operations Officer and Responsible Official
nAA-'t\-
MU/HBl:ljs
cc: LADWP - Gregory S. Huynh
LADWP - Tamer Ellyahky
LADWP - Andrea Villarin