Loading...
HomeMy WebLinkAboutDERR-2024-011701Utah Department of Environmental Quality - UST Release Detection TANK OWNERSHIP Name XPO LOGISTICS FREIGHT INC Address 2211 OLD EARHART RD STE 100 ANN ARBOR, MI 48105 Contact XPO LOGISTICS FREIGHT INC Phone Email matthew.zellen@xpo.com TANK LOCATION Name XPO LOGISTICS FREIGHT INC - USU Address 858 S 3760 W SALT LAKE CITY, UT 84104 A Operator CHRISTOPHER N HOLLOWAY Phone (801) 954-0709 B Operator SAME Phone SAME Facility ID: 4002230 Inspection Date: 10/23/2024 DISPENSER DETAILS DISP ID/ALT ID SUBSTANCE UDC PIPE FLEX LOC INSTALL DATE UDC INSTALL DATE FIRE VALVE SAT PRESENT UDC TEST DISP FLEX CP TEST 1 - 1 Diesel No Not Listed None None No Yes None None 2 - 2 Diesel No Not Listed None None No Yes None None 3 - 3 Diesel No Not Listed None None No Yes None None 4 - 4 Diesel No Not Listed None None No Yes None None TANK DETAILS Tank ID/Alt ID 1 / 1 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc June 14, 1999 / 20000 / West Substance Stored Diesel / Diesel #2 (U.L.S.) Tank Material- Mod Fiberglass Reinforced Plastic- Double-Walled ATG Veeder Root / TLS-450 Interstitial Monitor LTT Test June 24, 2024 LLD Test June 24, 2024 Pipe Material- Mod Fiberglass Reinforced Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Not in contact with soil LLD Model Red Jacket / VR FX1DV Spill/Overfill/Sm Delivery > 15 gal. Spill Bucket / Overfill alarm / No PST Fund/Other Type No / Insurance Tank/Pipe Rel Det TankInterstitialDblWalled PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test None CP Pipe Test None Tank ID/Alt ID 2 / 2 E-Gen/AST No / No Siphon/Compart No / No Tank Status Temporarily Out of Use Installed/Cap/Loc June 14, 1999 / 20000 / East Substance Stored Diesel / Diesel #2 (U.L.S.) Tank Material- Mod Fiberglass Reinforced Plastic- Double-Walled ATG Veeder Root / TLS-450 Interstitial Monitor LTT Test None LLD Test None Pipe Material- Mod Fiberglass Reinforced Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Red Jacket / VR FX1DV Spill/Overfill/Sm Delivery > 15 gal. Spill Bucket / Overfill alarm / No PST Fund/Other Type No / Insurance Tank/Pipe Rel Det TankInterstitialDblWalled PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test None CP Pipe Test None 2024-10-23 Page 1 of 7 Tank ID/Alt ID 3 / 3 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc June 14, 1999 / 2500 / North Substance Stored New Oil / Tank Material- Mod Fiberglass Reinforced Plastic- Double-Walled ATG Veeder Root / TLS-450 Interstitial Monitor LTT Test June 24, 2024 LLD Test None Pipe Material- Mod Fiberglass Reinforced Plastic / Double-Walled Pipe type/STP Cont U.S. Suction / Yes STP Flex Connectors Steel Flex in Sump LLD Model Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / Automatic shutoff / No PST Fund/Other Type No / Insurance Tank/Pipe Rel Det TankInterstitialDblWalled PipeLineTightness CP Tank Test None CP Pipe Test None Tank ID/Alt ID 4 / 4 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc June 14, 1999 / 1000 / South Substance Stored Used Oil / Tank Material- Mod Fiberglass Reinforced Plastic- Double-Walled ATG Veeder Root / TLS-450 Interstitial Monitor LTT Test None LLD Test None Pipe Material- Mod Fiberglass Reinforced Plastic / Double-Walled Pipe type/STP Cont Gravity Feed / No STP Flex Connectors Not Listed LLD Model Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / none / Yes PST Fund/Other Type No / Insurance Tank/Pipe Rel Det TankInterstitialDblWalled PipeLDDeferred CP Tank Test None CP Pipe Test None INSPECTION COMMENTS None 2024-10-23 Page 2 of 7 FACILITY RESPONSES The above accurately represents the facility's release detection records Yes Financial Responsibility Financial responsibility method is ok?Yes Operator Training A Operator current?Yes B Operator current?Yes Monthly checklist available and complete?Yes Is the site unmanned?No C Operators trained?Yes TANK RESPONSES Tank 1 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Yes Tank 1 ATG/IM IM - Type of Documentation Used?ATG IM - System capable of detecting a release of regulated substances from any portion of the primary tank/piping within one month of release? Yes ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes Tank 1 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank 1 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 1 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 2 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes 2024-10-23 Page 3 of 7 Tank 1 ATG/IM Does the ATG system have a valid annual test?Yes Tank 2 Temporary Closure Is release detection being maintained or is the depth of product less than 1 inch? Yes What is the depth of product? (Inches)<1 The cathodic protection system being maintained?Yes The tanks are locked and secured?Yes Tank 2 ATG/IM IM - Type of Documentation Used?ATG IM - System capable of detecting a release of regulated substances from any portion of the primary tank/piping within one month of release? Yes ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes Tank 2 ATG/IM Does the ATG system have a valid annual test?Yes Tank 3 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes Tank 2 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 2 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 3 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank 3 Suction Piping Leak Detection U.S. suction piping has a valid LTT every 3 years or monthly monitoring?Yes Tank 3 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 4 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes 2024-10-23 Page 4 of 7 Tank 3 ATG/IM IM - Type of Documentation Used?ATG IM - System capable of detecting a release of regulated substances from any portion of the primary tank/piping within one month of release? Yes ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes Tank 3 ATG/IM Does the ATG system have a valid annual test?Yes Tank 4 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes Tank 4 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 4 ATG/IM IM - Type of Documentation Used?ATG IM - System capable of detecting a release of regulated substances from any portion of the primary tank/piping within one month of release? Yes ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes Tank 4 ATG/IM Does the ATG system have a valid annual test?Yes DISPENSER RESPONSES Dispenser 2 Flex connectors at the dispensers are protected from corrosion?Yes Dispenser 4 Flex connectors at the dispensers are protected from corrosion?Yes Dispenser 1 Flex connectors at the dispensers are protected from corrosion?Yes Dispenser 3 Flex connectors at the dispensers are protected from corrosion?Yes 2024-10-23 Page 5 of 7 MONTHLY LEAK DETECTION MONITORING Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Tank 1 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 2 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 3 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 4 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl NON-COMPLIANCE ITEMS All items are in compliance. 2024-10-23 Page 6 of 7 Prepared by fueloperator.com Inspection Information Inspector:Warner, Sean Record Created:Oct. 23, 2024, 11:27 a.m. Inspection Date:Oct. 23, 2024 2024-10-23 Page 7 of 7