HomeMy WebLinkAboutDERR-2024-011701Utah Department of Environmental Quality - UST Release Detection
TANK OWNERSHIP
Name XPO LOGISTICS FREIGHT INC
Address 2211 OLD EARHART RD STE 100
ANN ARBOR, MI 48105
Contact XPO LOGISTICS FREIGHT INC
Phone
Email matthew.zellen@xpo.com
TANK LOCATION
Name XPO LOGISTICS FREIGHT INC - USU
Address 858 S 3760 W
SALT LAKE CITY, UT 84104
A Operator CHRISTOPHER N HOLLOWAY
Phone (801) 954-0709
B Operator SAME
Phone SAME
Facility ID: 4002230 Inspection Date: 10/23/2024
DISPENSER DETAILS
DISP
ID/ALT
ID
SUBSTANCE UDC PIPE FLEX LOC
INSTALL
DATE
UDC
INSTALL
DATE
FIRE
VALVE
SAT
PRESENT
UDC
TEST
DISP
FLEX
CP
TEST
1 - 1 Diesel No Not Listed None None No Yes None None
2 - 2 Diesel No Not Listed None None No Yes None None
3 - 3 Diesel No Not Listed None None No Yes None None
4 - 4 Diesel No Not Listed None None No Yes None None
TANK DETAILS
Tank ID/Alt ID 1 / 1
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc June 14, 1999 / 20000 / West
Substance
Stored Diesel / Diesel #2 (U.L.S.)
Tank Material-
Mod
Fiberglass Reinforced Plastic-
Double-Walled
ATG Veeder Root / TLS-450
Interstitial Monitor
LTT Test June 24, 2024
LLD Test June 24, 2024
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Not in contact with soil
LLD Model Red Jacket / VR FX1DV
Spill/Overfill/Sm
Delivery
> 15 gal. Spill Bucket / Overfill
alarm / No
PST Fund/Other
Type No / Insurance
Tank/Pipe Rel
Det
TankInterstitialDblWalled
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 2 / 2
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Temporarily Out of Use
Installed/Cap/Loc June 14, 1999 / 20000 / East
Substance
Stored Diesel / Diesel #2 (U.L.S.)
Tank Material-
Mod
Fiberglass Reinforced Plastic-
Double-Walled
ATG Veeder Root / TLS-450
Interstitial Monitor
LTT Test None
LLD Test None
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Red Jacket / VR FX1DV
Spill/Overfill/Sm
Delivery
> 15 gal. Spill Bucket / Overfill
alarm / No
PST Fund/Other
Type No / Insurance
Tank/Pipe Rel
Det
TankInterstitialDblWalled
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
2024-10-23 Page 1 of 7
Tank ID/Alt ID 3 / 3
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc June 14, 1999 / 2500 / North
Substance
Stored New Oil /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
Double-Walled
ATG Veeder Root / TLS-450
Interstitial Monitor
LTT Test June 24, 2024
LLD Test None
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont U.S. Suction / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Double Walled Spill Bucket /
Automatic shutoff / No
PST Fund/Other
Type No / Insurance
Tank/Pipe Rel
Det
TankInterstitialDblWalled
PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 4 / 4
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc June 14, 1999 / 1000 / South
Substance
Stored Used Oil /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
Double-Walled
ATG Veeder Root / TLS-450
Interstitial Monitor
LTT Test None
LLD Test None
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Gravity Feed / No
STP Flex
Connectors Not Listed
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Double Walled Spill
Bucket / none / Yes
PST Fund/Other
Type No / Insurance
Tank/Pipe Rel
Det
TankInterstitialDblWalled
PipeLDDeferred
CP Tank Test None
CP Pipe Test None
INSPECTION COMMENTS
None
2024-10-23 Page 2 of 7
FACILITY RESPONSES
The above accurately represents the
facility's release detection records Yes
Financial Responsibility
Financial responsibility method is ok?Yes
Operator Training
A Operator current?Yes
B Operator current?Yes
Monthly checklist available and
complete?Yes
Is the site unmanned?No
C Operators trained?Yes
TANK RESPONSES
Tank 1 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
If an overfill alarm is being used is it
properly located so the delivery driver
can hear or see it, and is clearly
identified?
Yes
Tank 1 ATG/IM
IM - Type of Documentation Used?ATG
IM - System capable of detecting a
release of regulated substances from
any portion of the primary tank/piping
within one month of release?
Yes
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
Tank 1 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 1 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 1 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 2 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
2024-10-23 Page 3 of 7
Tank 1 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 2 Temporary Closure
Is release detection being maintained
or is the depth of product less than 1
inch?
Yes
What is the depth of product? (Inches)<1
The cathodic protection system being
maintained?Yes
The tanks are locked and secured?Yes
Tank 2 ATG/IM
IM - Type of Documentation Used?ATG
IM - System capable of detecting a
release of regulated substances from
any portion of the primary tank/piping
within one month of release?
Yes
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
Tank 2 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 3 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 2 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 2 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 3 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 3 Suction Piping Leak Detection
U.S. suction piping has a valid LTT
every 3 years or monthly monitoring?Yes
Tank 3 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 4 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
2024-10-23 Page 4 of 7
Tank 3 ATG/IM
IM - Type of Documentation Used?ATG
IM - System capable of detecting a
release of regulated substances from
any portion of the primary tank/piping
within one month of release?
Yes
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
Tank 3 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 4 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 4 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 4 ATG/IM
IM - Type of Documentation Used?ATG
IM - System capable of detecting a
release of regulated substances from
any portion of the primary tank/piping
within one month of release?
Yes
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
Tank 4 ATG/IM
Does the ATG system have a valid
annual test?Yes
DISPENSER RESPONSES
Dispenser 2
Flex connectors at the dispensers are
protected from corrosion?Yes
Dispenser 4
Flex connectors at the dispensers are
protected from corrosion?Yes
Dispenser 1
Flex connectors at the dispensers are
protected from corrosion?Yes
Dispenser 3
Flex connectors at the dispensers are
protected from corrosion?Yes
2024-10-23 Page 5 of 7
MONTHLY LEAK DETECTION MONITORING
Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24
Tank 1 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 2 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 3 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 4 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
NON-COMPLIANCE ITEMS
All items are in compliance.
2024-10-23 Page 6 of 7
Prepared by fueloperator.com
Inspection Information
Inspector:Warner, Sean
Record Created:Oct. 23, 2024, 11:27
a.m.
Inspection
Date:Oct. 23, 2024
2024-10-23 Page 7 of 7