HomeMy WebLinkAboutDERR-2024-011700Utah Department of Environmental Quality - UST Release Detection
TANK OWNERSHIP
Name ESTES EXPRESS LINES
Address 4601 SPEAKER ROAD
KANSAS CITY, KS 66106
Contact ESTES EXPRESS LINES
Phone
Email curtis.carr@estes-express.com
TANK LOCATION
Name G.I. TRUCKING COMPANY DBA ESTES
WEST
Address 1234 S 3200 W
SALT LAKE CITY, UT 84104
A
Operator RUBEN BYERLEY
Phone (913) 281-1723
B
Operator SAME
Phone SAME
Facility ID: 4001470 Inspection Date: 10/23/2024
DISPENSER DETAILS
DISP
ID/ALT
ID
SUBSTANCE UDC PIPE FLEX LOC
INSTALL
DATE
UDC
INSTALL
DATE
FIRE
VALVE
SAT
PRESENT
UDC
TEST
DISP
FLEX
CP
TEST
1 - 1 Diesel No None None Yes No None None
2 - 2 Diesel No None None Yes No None None
TANK DETAILS
Tank ID/Alt ID 1 / 2
E-Gen/AST No / No
Siphon/Compart Yes / No
Tank Status Temporarily Out of Use
Installed/Cap/Loc Dec. 1, 1988 / 20000 / South
Center
Substance
Stored Diesel /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
Excavation Liner
ATG Veeder Root / TLS-350
LTT Test None
LLD Test None
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Bare Steel Flex
LLD Model Red Jacket / VR FX1DV
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Automatic
shutoff / No
PST Fund/Other
Type No / Self-insurance
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 2 / 3
E-Gen/AST No / No
Siphon/Compart Yes / No
Tank Status Currently In Use
Installed/Cap/Loc Dec. 1, 1988 / 20000 / Center
Substance
Stored Diesel /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
Excavation Liner
ATG Veeder Root / TLS-350 CSLD
Manifolded
LTT Test None
LLD Test None
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Bare Steel Flex
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Double Walled Spill Bucket /
Automatic shutoff / No
PST Fund/Other
Type No / Self-insurance
Tank/Pipe Rel
Det
TankATG PipeLineTightness /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
2024-10-23 Page 1 of 9
Tank ID/Alt ID 3 / 4
E-Gen/AST No / No
Siphon/Compart Yes / No
Tank Status Currently In Use
Installed/Cap/Loc Dec. 1, 1988 / 20000 / North
Center
Substance
Stored Diesel /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
Excavation Liner
ATG Veeder Root / TLS-350 CSLD
Manifolded
LTT Test Aug. 7, 2024
LLD Test Aug. 7, 2024
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Bare Steel Flex
LLD Model Red Jacket / VR FX1DV
Spill/Overfill/Sm
Delivery
5 gal. Double Walled Spill Bucket /
Automatic shutoff / No
PST Fund/Other
Type No / Self-insurance
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 4 / 5
E-Gen/AST No / No
Siphon/Compart Yes / No
Tank Status Temporarily Out of Use
Installed/Cap/Loc Dec. 1, 1988 / 20000 / North
Substance
Stored Diesel /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
Excavation Liner
ATG Veeder Root / TLS-350
LTT Test None
LLD Test None
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Bare Steel Flex
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Automatic
shutoff / No
PST Fund/Other
Type No / Self-insurance
Tank/Pipe Rel Det TankATG PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 5 / 1
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Temporarily Out of Use
Installed/Cap/Loc Dec. 1, 1988 / 10000 / South
Substance
Stored Diesel /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
Excavation Liner
ATG Veeder Root / TLS-350
LTT Test None
LLD Test None
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Bare Steel Flex
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Automatic
shutoff / No
PST Fund/Other
Type No / Self-insurance
Tank/Pipe Rel Det TankATG PipeLineTightness
CP Tank Test None
CP Pipe Test None
2024-10-23 Page 2 of 9
Tank ID/Alt ID 6 / 6
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Temporarily Out of Use
Installed/Cap/Loc Dec. 1, 1988 / 2500 / Single -
Separate excavation
Substance
Stored Used Oil /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
Double-Walled
ATG Veeder Root / TLS-350
LTT Test None
LLD Test None
Pipe Material-Mod Fiberglass Reinforced Plastic
/ None
Pipe type/STP Cont Gravity Feed / No
STP Flex Connectors
LLD Model
Spill/Overfill/Sm
Delivery / / Yes
PST Fund/Other
Type No / Self-insurance
Tank/Pipe Rel Det TankATG PipeLDDeferred
CP Tank Test None
CP Pipe Test None
INSPECTION COMMENTS
None
2024-10-23 Page 3 of 9
FACILITY RESPONSES
Financial Responsibility
Financial responsibility method is ok?Yes
The above accurately represents the
facility's release detection records Yes
Operator Training
A Operator current?Yes
B Operator current?Yes
Monthly checklist available and
complete?Yes
Is the site unmanned?No
C Operators trained?Yes
TANK RESPONSES
Tank 2 Temporary Closure
Is release detection being maintained
or is the depth of product less than 1
inch?
Yes
What is the depth of product? (Inches)<1
The cathodic protection system being
maintained?Yes
The tanks are locked and secured?Yes
Tank 2 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 2 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 2 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 2 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 2 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 3 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
2024-10-23 Page 4 of 9
Tank 3 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 3 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 3 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 4 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 3 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 3 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 4 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 4 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 4 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 5 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 5 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
2024-10-23 Page 5 of 9
Tank 4 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 4 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 5 Temporary Closure
Is release detection being maintained
or is the depth of product less than 1
inch?
Yes
What is the depth of product? (Inches)<1
The cathodic protection system being
maintained?Yes
The tanks are locked and secured?Yes
Tank 5 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 5 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 1 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 1 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 1 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 6 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Tank 6 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
2024-10-23 Page 6 of 9
Tank 5 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 1 Temporary Closure
Is release detection being maintained
or is the depth of product less than 1
inch?
Yes
What is the depth of product? (Inches)<1
The cathodic protection system being
maintained?Yes
The tanks are locked and secured?Yes
Tank 1 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 1 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 6 Temporary Closure
Is release detection being maintained
or is the depth of product less than 1
inch?
Yes
What is the depth of product? (Inches)<1
The cathodic protection system being
maintained?Yes
The tanks are locked and secured?Yes
Tank 6 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 6 ATG/IM
Does the ATG system have a valid
annual test?Yes
DISPENSER RESPONSES
2024-10-23 Page 7 of 9
Dispenser 2
Flex connectors at the dispensers are
protected from corrosion?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 1
Flex connectors at the dispensers are
protected from corrosion?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
MONTHLY LEAK DETECTION MONITORING
Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24
Tank 1 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 2 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 3 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 4 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 5 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 6 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
NON-COMPLIANCE ITEMS
All items are in compliance.
2024-10-23 Page 8 of 9
Prepared by fueloperator.com
Inspection Information
Inspector:Warner, Sean
Record Created:Oct. 23, 2024, 10:11
a.m.
Inspection
Date:Oct. 23, 2024
2024-10-23 Page 9 of 9