Loading...
HomeMy WebLinkAboutDERR-2024-011665PUBLIC NOTICE of COMPLETION Five-Year Review for the Sharon Steel Superfund Site Salt Lake County, Utah Summary: Sixth Five-Year Review Completed The Utah Department of Environmental Quality, Division of Environmental Response and Remediation (UDEQ/DERR), and the U.S. Environmental Protection Agency (EPA), Region 8, have completed the sixth Five-Year Review for the Sharon Steel Superfund Site (Site). Five-Year Reviews are required by the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) when hazardous substances remain on site above levels that permit unrestricted use and unlimited exposure. Five-Year Reviews are conducted to evaluate the site remedy and to determine whether site conditions remain protective of human health and the environment. Report Summary and Protectiveness Statement: This review provides the assessment of cleanup Site remedies at Operable Units (OU) 1 and 2. OU1 addresses the former mill site, tailings pile, and groundwater. OU2 addresses contaminated soils in residential and commercial areas. The review concludes the remedies at OU1 and OU2 are functioning as intended however additional actions are necessary to ensure long-term protectiveness. It is recommended that the EPA and UDEQ/DERR evaluate Institutional Controls for OU2 and if additional documentation and monitoring are necessary for the remedy to remain protective. Additionally, on January 17, 2024, the EPA issued “Updated Residential Soil Lead Guidance for CERCLA sites and Resource Conservation and Recovery Act (RCRA) Corrective Action Facilities” that lowered recommended regional screening level (RSL) for lead-contaminated soil at residential areas. The EPA and UDEQ/DERR will evaluate how this change may impact the cleanup that was conducted at the Sharon Steel Site and determine if additional investigation and/or cleanup is needed. The EPA and UDEQ/DERR will share information on planned activities and results as they become available. A protectiveness determination of the remedy at the Sharon Steel Site cannot be made at this time and is deferred until further information is obtained. Additional response actions may be necessary for the remedy to remain protective. It is expected that determination of the protectiveness status at the Site could take approximately 36 months to complete. This Five-Year Review Report was signed August 27, 2024 and the next Five-Year Review is required five years from the completion date. This review is available electronically at the UDEQ/DERR website at http://www.environmentalresponse.utah.gov Or visit the U.S EPA website under ‘Key Documents’ at: https://www.epa.gov/superfund/Sharon-Steel A copy of the review is also available at the UDEQ/DERR Offices located on the 1st Floor, at 195 North 1950 West, Salt Lake City, Utah, 84114. Please call for an appointment to review records at (801) 536-4100, Monday through Friday, from 8:30 A.M. to 4:30 P.M. For more information on the Sharon Steel Superfund Site Five-Year Review, please contact: Tony Howes Josie Nusz UDEQ/DERR Project Manager EPA Remedial Project Manager Phone: (385) 391-5917 Phone: (720) 985-4397 Email: thowes@utah.gov Email: Nusz.Josie@epa.gov