Loading...
HomeMy WebLinkAboutDAQ-2024-011159DEPARTMENT OF THE AIR FORCE 75TH CIVIL ENGINEER GROUP (AFMC) HILL AIR FORCE BASE UTAH 27 June2024 Amanda Burton Chief, Environmental Branch 7290 Weiner Road Hill Air Force Base Utah 84056-5003 Mr. Harold Burge Utah Division of Air Quality Attention: Compliance Section P.O. Box 1M820 Salt Lake ciry utah 84114-4820 Dear Mr. Burge I,TAH DEPARruENT OF EWIRONMENTAL otlAUTY JUN 21 2C,?4 fian) )altleve4 DIVISION OF AIR QUALITY Hill Air Force Base (AFB) is submitting this letter to notifu the administrator of the initial performance test of three Victor Energy, 99.8 MMBtu/hr rental boilers, located at building 260 under approval letter DAQE-GN101210293-24. The boilers are subject to an opacity standard under 40 CFR 60.43c(c) when firing fuel oil. An initial performance test for opacity is required by 40 CFR 60.45c to demonstrate compliance with established limits via visual opacity determination in accordance with 40 CFR 60, appendix A, method 9 within 60-days after achieving the maximum production rate at which the affected emission units will be operated but not later than 180 days after initial startup. The boilers are scheduled to be started up individually for testing and commissioning while combusting fuel oil beginning 08 July 2024. Once the boilers complete the initial startup on fuel oil, they will operate primarily on natural gas, with fuel oil combustion only taking place as a back-up during periods of natural gas curtailment or maintenance/readiness testing as needed. If you have any questions or would like to discuss this issue further, my point of contact is Dr. Erik Dettenmaier, 7 5 CEG / CEIEA, at (801) 7 7 7 -0888 or erik.dettenmaier. I @us.af. mi l. Sincerely X Amanda C Burton Signed lyr BURTONAMANDACHRISTINE.l 270023058 AMANDA C BURTON, NH-III, DAF Chief, Environmental Branch REVIEWEDInitials:Date:Oct 24, 2024Compliance Status:OKFile #: 10121 (B2)