Loading...
HomeMy WebLinkAboutDERR-2024-011677Utah Department of Environmental Quality - UST Release Detection TANK OWNERSHIP Name JACKSONS FOOD STORES Address 3450 EAST COMMERCIAL CT MERIDIAN, ID 83642 Contact JACKSONS FOOD STORES Phone Email Andrew.Marvin@jacksonsfoodstores.com TANK LOCATION Name DBA JACKSONS FOOD STORES #151 Address 278 W 2100 S SALT LAKE CITY, UT 84115 A Operator Andrew Marvin Phone (208) 888-6061 B Operator SAME Phone SAME Facility ID: 4001294 Inspection Date: 10/22/2024 DISPENSER DETAILS DISP ID/ALT ID SUBSTANCE UDC PIPE FLEX LOC INSTALL DATE UDC INSTALL DATE FIRE VALVE SAT PRESENT UDC TEST DISP FLEX CP TEST 1 - 1/2 Gasoline Yes Steel Flex in Sump None None Yes No None None 2 - 3/4 Gasoline Yes Steel Flex in Sump None None Yes No None None 3 - 5/6 Gasoline Yes Steel Flex in Sump None None Yes No None None 4 - 7/8 Gasoline Yes Steel Flex in Sump None None Yes No None None 5 - 9/10 Gasoline Yes Steel Flex in Sump None None Yes No None None 6 - 11/12 Gasoline Yes Steel Flex in Sump None None Yes No None None 7 - 13/14 Gasoline Yes Steel Flex in Sump None None Yes No None None 8 - 15/16 Diesel Yes Steel Flex in Sump None None Yes No None None 9 - 17/18 Diesel Yes Steel Flex in Sump None None Yes No None None 10 - 19/20 Diesel Yes Steel Flex in Sump None None Yes No None None 11 - 21/22 Diesel Yes Steel Flex in Sump None None Yes No None None 12 - 23/24 Diesel Yes Steel Flex in Sump None None Yes No None None TANK DETAILS Tank ID/Alt ID 30 / T7 E-Gen/AST No / No Siphon/Compart Yes / No Tank Status Currently In Use Installed/Cap/Loc May 25, 1995 / 6000 / Northeast Substance Stored Diesel / Diesel #2 (U.L.S.) Tank Material- Mod Fiberglass Reinforced Plastic- None ATG Gilbarco / EMC CSLD Manifolded LTT Test April 3, 2024 LLD Test April 3, 2024 Pipe Material- Mod Flexible Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Red Jacket / VR FX1DV Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / Overfill alarm / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test None CP Pipe Test None 2024-10-22 Page 1 of 13 Tank ID/Alt ID 31 / T6 E-Gen/AST No / No Siphon/Compart Yes / No Tank Status Currently In Use Installed/Cap/Loc May 25, 1995 / 6000 / Northwest Substance Stored Diesel / Diesel #2 (U.L.S.) Tank Material- Mod Fiberglass Reinforced Plastic- None ATG Gilbarco / EMC CSLD Manifolded LTT Test April 3, 2024 LLD Test April 3, 2024 Pipe Material- Mod Flexible Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Red Jacket / VR FX1DV Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / Overfill alarm / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test None CP Pipe Test None Tank ID/Alt ID 32 / T5 E-Gen/AST No / No Siphon/Compart Yes / No Tank Status Currently In Use Installed/Cap/Loc May 25, 1995 / 12000 / North Center Substance Stored Diesel / Diesel #2 (U.L.S.) Tank Material- Mod Fiberglass Reinforced Plastic- None ATG Gilbarco / EMC CSLD Manifolded LTT Test April 3, 2024 LLD Test April 3, 2024 Pipe Material- Mod Flexible Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Red Jacket / VR FX1DV Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Overfill alarm / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test None CP Pipe Test None Tank ID/Alt ID 33 / T4 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc May 25, 1995 / 12000 / North Center Substance Stored Gasoline / Premium Tank Material- Mod Fiberglass Reinforced Plastic- None ATG Gilbarco / EMC CSLD UnManifolded LTT Test April 3, 2024 LLD Test April 3, 2024 Pipe Material- Mod Flexible Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Red Jacket / VR FX1V Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / Overfill alarm / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test None CP Pipe Test None 2024-10-22 Page 2 of 13 Tank ID/Alt ID 34 / T3 E-Gen/AST No / No Siphon/Compart Yes / No Tank Status Currently In Use Installed/Cap/Loc May 25, 1995 / 12000 / South Center Substance Stored Gasoline / Regular Tank Material- Mod Fiberglass Reinforced Plastic- None ATG Gilbarco / EMC CSLD Manifolded LTT Test April 3, 2024 LLD Test April 3, 2024 Pipe Material- Mod Flexible Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Red Jacket / VR FX1V Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / Overfill alarm / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test None CP Pipe Test None Tank ID/Alt ID 35 / T2 E-Gen/AST No / No Siphon/Compart Yes / No Tank Status Currently In Use Installed/Cap/Loc May 25, 1995 / 12000 / South Center Substance Stored Gasoline / Regular Tank Material- Mod Fiberglass Reinforced Plastic- None ATG Gilbarco / EMC CSLD Manifolded LTT Test April 3, 2024 LLD Test April 3, 2024 Pipe Material- Mod Flexible Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Red Jacket / VR FX1V Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / Overfill alarm / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test None CP Pipe Test None Tank ID/Alt ID 36 / T1 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc May 25, 1995 / 12000 / South Substance Stored Gasoline / Premium Tank Material- Mod Fiberglass Reinforced Plastic- None ATG Gilbarco / EMC CSLD UnManifolded LTT Test April 3, 2024 LLD Test April 3, 2024 Pipe Material- Mod Flexible Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Red Jacket / VR FX1V Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / Overfill alarm / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test None CP Pipe Test None INSPECTION COMMENTS None 2024-10-22 Page 3 of 13 FACILITY RESPONSES Financial Responsibility Financial responsibility method is ok?Yes The above accurately represents the facility's release detection records Yes Operator Training A Operator current?Yes B Operator current?Yes Monthly checklist available and complete?Yes Is the site unmanned?No C Operators trained?Yes TANK RESPONSES Tank T7 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Yes Tank T7 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank T7 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank T7 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank T7 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank T6 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes 2024-10-22 Page 4 of 13 Tank T7 ATG/IM Does the ATG system have a valid annual test?Yes Tank T6 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Yes Tank T6 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank T6 ATG/IM Does the ATG system have a valid annual test?Yes Tank T6 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank T6 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank T5 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank T5 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank T5 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank T4 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank T4 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes 2024-10-22 Page 5 of 13 Tank T5 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Yes Tank T5 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank T5 ATG/IM Does the ATG system have a valid annual test?Yes Tank T4 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Yes Tank T4 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank T3 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank T3 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank T3 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank T2 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank T2 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank T2 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes 2024-10-22 Page 6 of 13 Tank T4 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank T4 ATG/IM Does the ATG system have a valid annual test?Yes Tank T3 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?No Does the Spill Prevention device have a potential to release product into the environment? Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Yes Tank T1 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank T1 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank T1 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes 2024-10-22 Page 7 of 13 Tank T3 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank T3 ATG/IM Does the ATG system have a valid annual test?Yes Tank T2 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?No Does the Spill Prevention device have a potential to release product into the environment? Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Yes 2024-10-22 Page 8 of 13 Tank T2 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank T2 ATG/IM Does the ATG system have a valid annual test?Yes Tank T1 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?No Does the Spill Prevention device have a potential to release product into the environment? Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Yes 2024-10-22 Page 9 of 13 Tank T1 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank T1 ATG/IM Does the ATG system have a valid annual test?Yes DISPENSER RESPONSES Dispenser 3/4 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 7/8 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 1/2 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 5/6 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes 2024-10-22 Page 10 of 13 Dispenser 11/12 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 15/16 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 19/20 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 23/24 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 9/10 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 13/14 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 17/18 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 21/22 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes 2024-10-22 Page 11 of 13 MONTHLY LEAK DETECTION MONITORING Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Tank 30 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 31 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 32 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 33 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 34 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 35 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 36 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl NON-COMPLIANCE ITEMS TANK T1 Question:Is the spill containment bucket intact? Comments:liquid in the interstice TANK T2 Question:Is the spill containment bucket intact? Comments:liquid in the interstice TANK T3 Question:Is the spill containment bucket intact? Comments:liquid in spill bucket interstice 2024-10-22 Page 12 of 13 Prepared by fueloperator.com Inspection Information Inspector:Warner, Sean Record Created:Oct. 22, 2024, 9:42 a.m. Inspection Date:Oct. 22, 2024 2024-10-22 Page 13 of 13