Loading...
HomeMy WebLinkAboutDAQ-2024-011152DEPARTMENT OF THE AIR FORCE 75TH CTVIL ENGTNEER GROUP (AFMC) HILL AIR FORCE BASE UTAH Amanda Burton Chief, Environmental Branch 7290 Weiner Street Hill Air Force Base Utah 84056-5003 Director Utah Division of Air Quality Attention: Compliance Section P.O. Box 144820 Salt t ake city utah 84114-4820 ll luly 2024 I,TAH DEPAHTMENT OF E}WTRONMENTAL OUruTY JtlL 1 2 2A24 *an d de-t\ lercJ DIViSION OF AIR OUALTTY Dear Director Hill Air Force Base is submitting this notification, pursuant to Conditions II.B.52.d existing affected boilers and II.B.53.d new affected boilers of the Main Base Title V Operating Permit (TVOP) I 100007004, which states "the permittee shall submit a notification of alternative fuel use within 48 hours of the declaration of each period of natural gas curtailment or supply intemtption. [Origin: 40 CFR 63 Subpart DDDDDI [40 CFR 63.7545(f)1" On 12 July 2024, one of the boilers in Building 260 (AQUIS 3501,3502,3503,3504,3506, 3507, or 3508) will be fired on DS2 Diesel Fuel Grade 2-D. The sfainer on the building 260 natural gas supply line must be cleaned resulting in a supply intemrption. The alternative fuel, DS2 Diesel Fuel Grade 2-D, complies with the specifications under the definition of distillate oil in 40 CFR 60.41c and is Defense Logistics Agency-Energy contracted fuel compliant with MILSTD-3004B'DoD Standard Practice-Quality Assurance Surveillance for Fuels, Lubricants and Related Products' for National Stock Number 9140-01-524-0139. If you have any questions or would like to discuss this issue further, my point of contact is Dr. Erik DettenmaierT5 CEG/CEIEA, at(801) 777-0888 orerik.dettenmaier.l@us.af.mil. Sincerely 7/11/2024 X Amanda Burton Signed by: BURTONAMANDACHRISTINE.l 270023068 AMANDA C BURTON, NH.III, DAF Chiefi Environmental Branch REVIEWEDInitials:Date: Oct 24, 2024Compliance Status: OKFile #: 10121 (B2)