HomeMy WebLinkAboutDDW-2024-012583Sanitary Survey - Deficiency Report
PWS Number:UTAH25075 Deficiency Points:45 Survey Date:10/03/2024
Survey Name:MUTUAL DELL
RECREATION
Surveyor:Russ Franklin
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH25075 DISTRIBUTION SYSTEM
33. Documentation of annual public awareness and/or employee training
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes providing public education or awareness material or presentations.
Notes:They have the sheets in their backflow email but no work has been recorded yet.
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M004 CCC-NO ANNUAL PUBLIC EDUCATION OR AWARENESS
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH25075 DISTRIBUTION SYSTEM
35. Does the water system have detailed records of cross connection control activities? (inventories of backflow assemblies, devices, and air gaps
installed within the system)
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes written records of cross connection control activities.
Notes:They have the sheets in their backflow email but no work has been recorded yet.
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M006 CCC-LACKS WRITTEN RECORDS OF CCC ACTIVITIES
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH25075 DISTRIBUTION SYSTEM
36. Does the water system have records of on-going enforcement activities? (test history, enforcement activities, hazard assessments)
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes test history and documentation of on-going enforcement activities.
Notes:They have the sheets in their backflow email but no work has been recorded yet.
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M007 CCC-LACKS ON-GOING ENFORCEMENT IMPLEMENTATION