Loading...
HomeMy WebLinkAboutDDW-2024-012583Sanitary Survey - Deficiency Report PWS Number:UTAH25075 Deficiency Points:45 Survey Date:10/03/2024 Survey Name:MUTUAL DELL RECREATION Surveyor:Russ Franklin Sanitary Survey Category: SM SDWIS Severity Code: Minor Deficiency Cross Connection and Operator Certification | DS001 | UTAH25075 DISTRIBUTION SYSTEM 33. Documentation of annual public awareness and/or employee training Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program that includes providing public education or awareness material or presentations. Notes:They have the sheets in their backflow email but no work has been recorded yet. Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M004 CCC-NO ANNUAL PUBLIC EDUCATION OR AWARENESS Sanitary Survey Category: SM SDWIS Severity Code: Minor Deficiency Cross Connection and Operator Certification | DS001 | UTAH25075 DISTRIBUTION SYSTEM 35. Does the water system have detailed records of cross connection control activities? (inventories of backflow assemblies, devices, and air gaps installed within the system) Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program that includes written records of cross connection control activities. Notes:They have the sheets in their backflow email but no work has been recorded yet. Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M006 CCC-LACKS WRITTEN RECORDS OF CCC ACTIVITIES Sanitary Survey Category: SM SDWIS Severity Code: Minor Deficiency Cross Connection and Operator Certification | DS001 | UTAH25075 DISTRIBUTION SYSTEM 36. Does the water system have records of on-going enforcement activities? (test history, enforcement activities, hazard assessments) Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program that includes test history and documentation of on-going enforcement activities. Notes:They have the sheets in their backflow email but no work has been recorded yet. Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M007 CCC-LACKS ON-GOING ENFORCEMENT IMPLEMENTATION