Loading...
HomeMy WebLinkAboutDDW-2024-012562Sanitary Survey - Deficiency Report PWS Number:UTAH22005 Deficiency Points:120 Survey Date:10/08/2024 Survey Name:HENEFER TOWN WATER SYSTEM Surveyor:Rocky Pace Sanitary Survey Category: SM SDWIS Severity Code: Significant Deficiency Management and Operations | DS001 | UTAH22005 DISTRIBUTION SYSTEM 24. Are there any individual home booster pumps installed in the distribution system (not for fire suppression)? Rule: R309-550-11(3)R309-550-11(3) Notes:There is one home that is serviced by an individual home booster pump. Deficiency Points: 50 Days until points become effective on IPS: 120 SDWIS Deficiency Description: M008 SERVICE CONNECTIONS IN DISTRIBUTION SYSTEM RELY ON INDIVIDUAL HOME BOOSTER PUMP DUE TO INADEQUATE PRESSURE Sanitary Survey Category: SM SDWIS Severity Code: Minor Deficiency Cross Connection and Operator Certification | DS001 | UTAH22005 DISTRIBUTION SYSTEM 37. Documentation of personnel trained to manage the program (ALL COMUNITY WATER SYSTEMS REQUIRE A DDW CERTIFIED CCC PROGRAM ADMINISTRATOR. ALL OTHER WATER SYSTEMS REQUIRE AT A MINIMUM BACKFLOW 101 OR EQUIVALENT/ GREATER CCC TRAINING) Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program that includes an operator with adequate training in the area of cross connection control or backflow prevention. Notes:System does not have a certified CCC program administrator Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M005 CCC-LACKS OPERATOR TRAINING Sanitary Survey Category: SM SDWIS Severity Code: Minor Deficiency Cross Connection and Operator Certification | DS001 | UTAH22005 DISTRIBUTION SYSTEM 39. Does the water system have records of on-going enforcement activities? (test history, enforcement activities, hazard assessments) Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program that includes test history and documentation of on-going enforcement activities. Notes:System does not have records of on-going enforcement. Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M007 CCC-LACKS ON-GOING ENFORCEMENT IMPLEMENTATION Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Springs | WS001 | BACHELOR CANYON SPRING #1 67. Is a spring box vent present? ... if yes, answer the following question(s) Rule: R309-515-7(7)(d), R309-545-15 Rule requires junction boxes and collection boxes to comply with R309-545 with respect to venting. Therefore, a junction or collection box requires a vent to be fitted with #14 mesh or finer non-corrodible screen, be fitted with a protective heavy-gauge screen or covering if 6 inches in diameter or greater, be down-turned and shielded to prevent the entrance of contaminants, be located and sized to avoid blockage during winter, and have the end of the vent discharge a minimum of 24 inches above the earth on buried structures. Notes: Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: SS11 SPRING BOX LACKS A MEANS OF VENTING Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Springs | WS002 | BACHELOR CANYON SPRING #2 82. Is a spring box vent present? ... if yes, answer the following question(s) Rule: R309-515-7(7)(d), R309-545-15 Rule requires junction boxes and collection boxes to comply with R309-545 with respect to venting. Therefore, a junction or collection box requires a vent to be fitted with #14 mesh or finer non-corrodible screen, be fitted with a protective heavy-gauge screen or covering if 6 inches in diameter or greater, be down-turned and shielded to prevent the entrance of contaminants, be located and sized to avoid blockage during winter, and have the end of the vent discharge a minimum of 24 inches above the earth on buried structures. Notes: Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: SS11 SPRING BOX LACKS A MEANS OF VENTING Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Springs | WS003 | BACHELOR CANYON SPRINGS #3 AND #4 97. Is a spring box vent present? ... if yes, answer the following question(s) Rule: R309-515-7(7)(d), R309-545-15 Rule requires junction boxes and collection boxes to comply with R309-545 with respect to venting. Therefore, a junction or collection box requires a vent to be fitted with #14 mesh or finer non-corrodible screen, be fitted with a protective heavy-gauge screen or covering if 6 inches in diameter or greater, be down-turned and shielded to prevent the entrance of contaminants, be located and sized to avoid blockage during winter, and have the end of the vent discharge a minimum of 24 inches above the earth on buried structures. Notes: Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: SS11 SPRING BOX LACKS A MEANS OF VENTING Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Springs | WS004 | BACHELOR CANYON SPRING #5 112. Is a spring box vent present? ... if yes, answer the following question(s) Rule: R309-515-7(7)(d), R309-545-15 Rule requires junction boxes and collection boxes to comply with R309-545 with respect to venting. Therefore, a junction or collection box requires a vent to be fitted with #14 mesh or finer non-corrodible screen, be fitted with a protective heavy-gauge screen or covering if 6 inches in diameter or greater, be down-turned and shielded to prevent the entrance of contaminants, be located and sized to avoid blockage during winter, and have the end of the vent discharge a minimum of 24 inches above the earth on buried structures. Notes: Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: SS11 SPRING BOX LACKS A MEANS OF VENTING Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Springs | WS005 | FRANKLIN CANYON SPRING 127. Is a spring box vent present? ... if yes, answer the following question(s) Rule: R309-515-7(7)(d), R309-545-15 Rule requires junction boxes and collection boxes to comply with R309-545 with respect to venting. Therefore, a junction or collection box requires a vent to be fitted with #14 mesh or finer non-corrodible screen, be fitted with a protective heavy-gauge screen or covering if 6 inches in diameter or greater, be down-turned and shielded to prevent the entrance of contaminants, be located and sized to avoid blockage during winter, and have the end of the vent discharge a minimum of 24 inches above the earth on buried structures. Notes: Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: SS11 SPRING BOX LACKS A MEANS OF VENTING Sanitary Survey Category: TR SDWIS Severity Code: Minor Deficiency Treatment - Chlorination General | TP005 | FRANKLIN CANYON CHLORINE 195. Is there a designated chlorine Point of Entry (POE) sample location? Rule: R309-105-7, 8 & 18, R309-100 through 605 Trigger for regulatory followup to address concerns. Notes:No designated POE test point Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: TGR9 TRIGGER FOR REGULATORY FOLLOWUP TO ADDRESS CONCERNS