HomeMy WebLinkAboutDERR-2024-011651Utah Department of Environmental Quality - UST Release Detection
TANK OWNERSHIP
Name SLC VA MEDICAL CENTER
Address 500 FOOTHILL BLVD MAIL STOP #138
SALT LAKE CITY, UT 84148
Contact SLC VA MEDICAL CENTER
Phone
Email Shannon.Smith92@va.gov
TANK LOCATION
Name VA MEDICAL CENTER
Address 500 FOOTHILL BLVD BUILDING #38
SALT LAKE CITY, UT 84148
A Operator JUSTIN SCOBELL
Phone (801) 582-1565
B Operator SAME
Phone SAME
Facility ID: 4001459 Inspection Date: 10/23/2024
DISPENSER DETAILS
DISP
ID/ALT
ID
SUBSTANCE UDC PIPE FLEX LOC
INSTALL
DATE
UDC
INSTALL
DATE
FIRE
VALVE
SAT
PRESENT
UDC
TEST
DISP
FLEX
CP
TEST
1 - 1/2 Gasohol Yes Steel Flex in Sump Aug. 1,
2014
Aug. 1,
2014
Yes No Aug. 1,
2014
None
2 - 38D Diesel Yes Not Listed Jan. 1,
1910
None Yes No None None
TANK DETAILS
Tank ID/Alt ID 3 / 3
E-Gen/AST Yes / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc June 24, 1988 / 2500 /
Substance Stored Diesel /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-350
LTT Test None
LLD Test None
Pipe Material-
Mod
Bare Steel / Secondary
Containment
Pipe type/STP
Cont Safe Suction / No
STP Flex
Connectors
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Double Walled Spill Bucket /
Automatic shutoff / No
PST Fund/Other
Type No / Exempt
Tank/Pipe Rel
Det TankATG PipeLDDeferred
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 14 / 39
E-Gen/AST Yes / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc June 28, 1988 / 2500 /
Substance Stored Diesel /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-350
LTT Test None
LLD Test None
Pipe Material-Mod Bare Steel / Secondary
Containment
Pipe type/STP
Cont Safe Suction / No
STP Flex
Connectors
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Automatic
shutoff / No
PST Fund/Other
Type No / Exempt
Tank/Pipe Rel Det TankATG PipeLDDeferred
CP Tank Test None
CP Pipe Test None
2024-10-23 Page 1 of 12
Tank ID/Alt ID 15 / 40
E-Gen/AST Yes / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc June 27, 1988 / 4000 /
Substance Stored Diesel /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-350
LTT Test None
LLD Test None
Pipe Material-
Mod
Bare Steel / Secondary
Containment
Pipe type/STP
Cont Safe Suction / No
STP Flex
Connectors
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Double Walled Spill Bucket /
Automatic shutoff / No
PST Fund/Other
Type No / Exempt
Tank/Pipe Rel
Det TankATG PipeLDDeferred
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 16 / 41
E-Gen/AST Yes / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc June 24, 1988 / 4000 /
Substance Stored Diesel /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-350
LTT Test None
LLD Test None
Pipe Material-Mod Bare Steel / Secondary
Containment
Pipe type/STP
Cont Safe Suction / No
STP Flex
Connectors
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Automatic
shutoff / No
PST Fund/Other
Type No / Exempt
Tank/Pipe Rel Det TankATG PipeLDDeferred
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 18 / 43
E-Gen/AST Yes / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Aug. 26, 2010 / 15000 /
Substance
Stored Diesel / Diesel #2 (U.L.S.)
Tank Material-
Mod
Fiberglass Reinforced Plastic-
Double-Walled
ATG Veeder Root / TLS-350
Interstitial Monitor
LTT Test None
LLD Test Sept. 19, 2023
Pipe Material-
Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Red Jacket / VR FX1DV
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Overfill alarm
/ No
PST Fund/Other
Type No / Exempt
Tank/Pipe Rel
Det
TankInterstitialDblWalled
PipeAutoLineLeakDetection /
PipeInterstitialDblWalled
CP Tank Test None
CP Pipe Test None
2024-10-23 Page 2 of 12
Tank ID/Alt ID 19 / 44
E-Gen/AST Yes / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Aug. 26, 2010 / 15000 / East
Substance
Stored Diesel / Diesel #2 (U.L.S.)
Tank Material-
Mod
Fiberglass Reinforced Plastic-
Double-Walled
ATG Veeder Root / TLS-350
Interstitial Monitor
LTT Test None
LLD Test Sept. 19, 2023
Pipe Material-
Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Red Jacket / VR FX1DV
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Overfill alarm
/ No
PST Fund/Other
Type No / Exempt
Tank/Pipe Rel
Det
TankInterstitialDblWalled
PipeAutoLineLeakDetection /
PipeInterstitialDblWalled
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 20 / 20
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc May 8, 2014 / 8000 / Single
Substance
Stored Gasoline / Regular
Tank Material-
Mod
Fiberglass Reinforced Plastic-
Double-Walled
ATG Veeder Root / TLS-350
Interstitial Monitor
LTT Test None
LLD Test Sept. 19, 2023
Pipe Material-
Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Veeder Root PLLD
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Overfill alarm
/ No
PST Fund/Other
Type No / Exempt
Tank/Pipe Rel
Det
TankInterstitialDblWalled
PipeAutoLineLeakDetection /
PipeInterstitialDblWalled
CP Tank Test None
CP Pipe Test None
INSPECTION COMMENTS
None
2024-10-23 Page 3 of 12
FACILITY RESPONSES
Financial Responsibility
Financial responsibility method is ok?Yes
The above accurately represents the
facility's release detection records Yes
Operator Training
A Operator current?Yes
B Operator current?Yes
Monthly checklist available and
complete?Yes
Is the site unmanned?Yes
Is a sign posted in a conspicuous area
giving the name and telephone number
of a person in case of an emergency
and if the station is manned part of the
time, are C operators trained?
Yes
Does the site have emergency shutoff
device?Yes
TANK RESPONSES
Tank 3 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 3 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 3 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Tank 3 Suction Piping Leak Detection
Piping qualifies as Safe Suction.
(Documentation is available and
verifiable to show that piping operates
at less than atmospheric pressure, has
only one check valve (under pump),
and has proper slope of piping. If all
these criteria are met, no leak
detection is required on the piping.)
Yes
Tank 3 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 39 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Tank 39 Suction Piping Leak Detection
Piping qualifies as Safe Suction.
(Documentation is available and
verifiable to show that piping operates
at less than atmospheric pressure, has
only one check valve (under pump),
and has proper slope of piping. If all
these criteria are met, no leak
detection is required on the piping.)
Yes
2024-10-23 Page 4 of 12
Tank 3 ATG/IM
Does the ATG system have a valid
annual test?No
Tank 39 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 39 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 39 ATG/IM
Does the ATG system have a valid
annual test?No
Tank 40 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 39 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 40 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Tank 40 Suction Piping Leak Detection
Piping qualifies as Safe Suction.
(Documentation is available and
verifiable to show that piping operates
at less than atmospheric pressure, has
only one check valve (under pump),
and has proper slope of piping. If all
these criteria are met, no leak
detection is required on the piping.)
Yes
Tank 40 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 41 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Tank 41 Suction Piping Leak Detection
Piping qualifies as Safe Suction.
(Documentation is available and
verifiable to show that piping operates
at less than atmospheric pressure, has
only one check valve (under pump),
and has proper slope of piping. If all
these criteria are met, no leak
detection is required on the piping.)
Yes
Tank 41 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 43 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
2024-10-23 Page 5 of 12
Tank 40 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 40 ATG/IM
Does the ATG system have a valid
annual test?No
Tank 41 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 43 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?No
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 43 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 44 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 44 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?No
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 44 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 20 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 20 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?No
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
2024-10-23 Page 6 of 12
Tank 41 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 41 ATG/IM
Does the ATG system have a valid
annual test?No
Tank 43 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
If an overfill alarm is being used is it
properly located so the delivery driver
can hear or see it, and is clearly
identified?
Yes
Tank 20 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
2024-10-23 Page 7 of 12
Tank 43 ATG/IM
IM - Type of Documentation Used?ATG
IM - System capable of detecting a
release of regulated substances from
any portion of the primary tank/piping
within one month of release?
Yes
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
Tank 43 ATG/IM
Does the ATG system have a valid
annual test?No
Does the Containment Sump have a
valid 3-year test?Yes
Tank 44 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
If an overfill alarm is being used is it
properly located so the delivery driver
can hear or see it, and is clearly
identified?
Yes
2024-10-23 Page 8 of 12
Tank 44 ATG/IM
IM - Type of Documentation Used?ATG
IM - System capable of detecting a
release of regulated substances from
any portion of the primary tank/piping
within one month of release?
Yes
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
Tank 44 ATG/IM
Does the ATG system have a valid
annual test?No
Does the Containment Sump have a
valid 3-year test?Yes
Tank 20 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
If an overfill alarm is being used is it
properly located so the delivery driver
can hear or see it, and is clearly
identified?
Yes
2024-10-23 Page 9 of 12
Tank 20 ATG/IM
IM - Type of Documentation Used?ATG
IM - System capable of detecting a
release of regulated substances from
any portion of the primary tank/piping
within one month of release?
Yes
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
Tank 20 ATG/IM
Does the ATG system have a valid
annual test?No
Does the Containment Sump have a
valid 3-year test?Yes
DISPENSER RESPONSES
Dispenser 38D
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 1/2
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
2024-10-23 Page 10 of 12
MONTHLY LEAK DETECTION MONITORING
Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24
Tank 3 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 14 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 15 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 16 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 18 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Tank 19 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Tank 20 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
NON-COMPLIANCE ITEMS
TANK 20
No Photos
Question:Does the pressurized piping system have a valid line leak detector test?
Comments:None
TANK 20
No Photos
Question:Does the ATG system have a valid annual test?
Comments:None
TANK 3
No Photos
Question:Does the ATG system have a valid annual test?
Comments:None
TANK 39
No Photos
Question:Does the ATG system have a valid annual test?
Comments:None
TANK 40
No Photos
Question:Does the ATG system have a valid annual test?
Comments:None
TANK 41
No Photos
Question:Does the ATG system have a valid annual test?
Comments:None
TANK 43
No Photos
Question:Does the pressurized piping system have a valid line leak detector test?
Comments:None
TANK 43
No Photos
Question:Does the ATG system have a valid annual test?
Comments:None
TANK 44
No Photos
Question:Does the pressurized piping system have a valid line leak detector test?
Comments:None
TANK 44
No Photos
Question:Does the ATG system have a valid annual test?
Comments:None
2024-10-23 Page 11 of 12
Prepared by fueloperator.com
Inspection Information
Inspector:Rasmussen, DeAnn
Record Created:Oct. 23, 2024, 1:25 p.m.
Inspection Date:Oct. 23, 2024
2024-10-23 Page 12 of 12