Loading...
HomeMy WebLinkAboutDERR-2024-011638Utah Department of Environmental Quality - UST Release Detection TANK OWNERSHIP Name 379 SOUTH CORNER STORE LLC Address 379 S 300 W SALT LAKE CITY, UT 84101 Contact 379 SOUTH CORNER STORE LLC Phone Email timmynguyen8430@gmail.com TANK LOCATION Name FAST BREAK Address 379 S 300 W SALT LAKE CITY, UT 84101 A Operator THOMAS NGUYEN Phone (682) 500-9766 B Operator SAME Phone SAME Facility ID: 4001552 Inspection Date: 10/24/2024 DISPENSER DETAILS DISP ID/ALT ID SUBSTANCE UDC PIPE FLEX LOC INSTALL DATE UDC INSTALL DATE FIRE VALVE SAT PRESENT UDC TEST DISP FLEX CP TEST 1 - 1/2 Gasoline No None None Yes No None None 2 - 3/4 Gasoline No None None Yes No None None 3 - 5/6 Gas/Diesel No None None Yes No None None TANK DETAILS Tank ID/Alt ID 1 / 1a E-Gen/AST No / No Siphon/Compart No / Yes Tank Status Currently In Use Installed/Cap/Loc Jan. 1, 1990 / 8200 / Northeast Substance Stored Gasoline / Regular Tank Material-Mod Composite (Steel w/ FRP)- None ATG Veeder Root / TLS-350 LTT Test Feb. 22, 2024 LLD Test Feb. 22, 2024 Pipe Material- Mod Fiberglass Reinforced Plastic / None Pipe type/STP Cont Pressurized / No STP Flex Connectors Booted Steel Flex LLD Model Red Jacket / VR FX1V Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / Automatic shutoff / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test None CP Pipe Test None Tank ID/Alt ID 2 / 2a E-Gen/AST No / No Siphon/Compart No / Yes Tank Status Currently In Use Installed/Cap/Loc Jan. 1, 1990 / 5264 / Northwest Substance Stored Gasoline / Premium Tank Material-Mod Composite (Steel w/ FRP)- None ATG Veeder Root / TLS-350 LTT Test Feb. 22, 2024 LLD Test Feb. 22, 2024 Pipe Material- Mod Fiberglass Reinforced Plastic / None Pipe type/STP Cont Pressurized / No STP Flex Connectors Booted Steel Flex LLD Model Red Jacket / VR FX1V Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / Automatic shutoff / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test None CP Pipe Test None 2024-10-25 Page 1 of 7 Tank ID/Alt ID 6 / 1b E-Gen/AST No / No Siphon/Compart No / Yes Tank Status Temporarily Out of Use Installed/Cap/Loc Jan. 1, 1990 / 7144 / Southwest Substance Stored Gasoline / Midgrade Tank Material-Mod Composite (Steel w/ FRP)-None ATG Veeder Root / TLS-350 LTT Test None LLD Test None Pipe Material- Mod Fiberglass Reinforced Plastic / None Pipe type/STP Cont Pressurized / No STP Flex Connectors Booted Steel Flex LLD Model Vaporless LD2000 Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Ball float valve / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test None CP Pipe Test None Tank ID/Alt ID 7 / 2b E-Gen/AST No / No Siphon/Compart No / Yes Tank Status Temporarily Out of Use Installed/Cap/Loc Jan. 1, 1990 / 4136 / Southeast Substance Stored Diesel / Diesel #2 (U.L.S.) Tank Material-Mod Composite (Steel w/ FRP)- None ATG Veeder Root / TLS-350 LTT Test None LLD Test None Pipe Material- Mod Fiberglass Reinforced Plastic / None Pipe type/STP Cont Pressurized / No STP Flex Connectors Booted Steel Flex LLD Model Vaporless LD2000 Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / Automatic shutoff / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test None CP Pipe Test None INSPECTION COMMENTS None 2024-10-25 Page 2 of 7 FACILITY RESPONSES The above accurately represents the facility's release detection records Yes Financial Responsibility Financial responsibility method is ok?Yes Operator Training A Operator current?Yes B Operator current?Yes Monthly checklist available and complete?Yes Is the site unmanned?Yes Is a sign posted in a conspicuous area giving the name and telephone number of a person in case of an emergency and if the station is manned part of the time, are C operators trained? Yes Does the site have emergency shutoff device?Yes TANK RESPONSES Tank 1a Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes Tank 1a ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank 1a Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Tank 1a Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 1a Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 2a Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes 2024-10-25 Page 3 of 7 Tank 1a ATG/IM Does the ATG system have a valid annual test?Yes Tank 2a Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes Tank 2a ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank 2a ATG/IM Does the ATG system have a valid annual test?Yes Tank 1b Temporary Closure Is release detection being maintained or is the depth of product less than 1 inch? Yes What is the depth of product? (Inches)<1 The cathodic protection system being maintained?Yes The tanks are locked and secured?Yes Tank 2a Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 2a Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 1b Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Tank 1b Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 1b Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 2b Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Tank 2b Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes 2024-10-25 Page 4 of 7 Tank 1b ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank 1b ATG/IM Does the ATG system have a valid annual test?Yes Tank 2b Temporary Closure Is release detection being maintained or is the depth of product less than 1 inch? Yes What is the depth of product? (Inches)<1 The cathodic protection system being maintained?Yes The tanks are locked and secured?Yes Tank 2b ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank 2b Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes 2024-10-25 Page 5 of 7 Tank 2b ATG/IM Does the ATG system have a valid annual test?Yes DISPENSER RESPONSES Dispenser 3/4 Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 1/2 Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 5/6 Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes MONTHLY LEAK DETECTION MONITORING Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Tank 1 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 2 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 6 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 7 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl NON-COMPLIANCE ITEMS All items are in compliance. 2024-10-25 Page 6 of 7 Prepared by fueloperator.com Inspection Information Inspector:Rasmussen, DeAnn Record Created:Oct. 24, 2024, 10:26 p.m. Inspection Date:Oct. 24, 2024 2024-10-25 Page 7 of 7