Loading...
HomeMy WebLinkAboutDERR-2024-011631Good Morning Ian, I've summarized the compliance issues at these sites. I've attached the inspections. Give me a call if you have any questions. FAC ID 4001950 Airport North Support - Precision Testing did most of the tests on 08/08/24.The line leak detectors and ATG are due on November 21, 2024. I'd move all of these tests to the same day next year to prevent another mob charge. Please send me the documentation that these items have been resolved (invoices, retests, photos). Tank 1 Gas - failed the spill bucket test - repair and retest. The pressure vent valve needs to be tested (required on all gas (not diesel) tanks. LLD & ATG due on 11/21/24. Tank 2 Diesel - failed the overfill test on 08/08/24 - repair and retest. LLD & ATG due on 11/21/24. Tank 3 Diesel - LLD & ATG due on 11/21/2024. Dispenser 2 -product seeping from connection- repair and send me a photo of the repair Dispenser 5 - UDC failed on 08/08/24 - repair and retest Dispenser 9 - product in bottom of UDC - repair and retest FAC ID 4001532 - Shop & Maintenance - cathodic protection test is due on 11/21/2025 (next year). FAC ID 4002002 - Everything is up to date. FAC ID 4001950 - Everything is up to date. Thanks, DeAnn -- DeAnn Rasmussen Environmental Scientist Mobile: (385) 251-0936 Office: (801) 536-4100 Fax: (801) 359-8853 darasmussen@utah.gov DEQ/DERR/UST 195 North 1950 West-1st Floor P.O. BOX 144840 Salt Lake City, UT 84114-4840 4 attachments 4002180_2024-10-24.pdf 46K 4002002_2024-10-24.pdf 51K 4001950_2024-10-24.pdf 68K 4001532_2024-10-24.pdf 43K 10/25/24, 10:24 AM State of Utah Mail - (no subject) https://mail.google.com/mail/u/0/?ik=901d42da0e&view=pt&search=all&permthid=thread-a:r-5382666649393195333%7Cmsg-a:r-7104888617008293…2/2